Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:
MEAL PERIODS AND REST BREAKS 4.1 Except when required for urgent or emergency work and except as provided in 4.2 no employee shall be required to work for more than five hours continuously without being allowed a meal break of not less than half an hour. 4.2 An employee unable to be relieved from work for a meal break shall be allowed to have a meal on duty and this period shall be regarded as working time. 4.3 Except where provided for in 4.2 an employee unable to take a meal after five hours’ duty shall be paid at overtime rates from the expiry of five hours until the time when a meal can be taken. 4.4 During the meal break or rest breaks prescribed above, free tea, coffee, milk and sugar shall be supplied by the employer. Where it is impractical to supply tea, coffee, milk and sugar free of charge, an allowance of $1.48 per week in lieu shall be paid. This allowance shall continue during all periods of leave except leave without pay. 4.5 Rest breaks of 10 minutes each for morning tea, afternoon tea or supper, where these occur during duty, shall be allowed as time worked.
Teaching Load 11-1 The parties recognize that the number of students, the number of preparations, and the amount of planning time are related to student performance. 11-2 CLASS SIZE 11-2-1 The parties recognize that class size is related to economics and that reduction of class size is faced with fiscal constraints. The parties further recognize that it is not feasible at this time to set general numerical limitations upon class size because of physical space available, special programs, special student needs, attendance area variances, differences in scheduling systems, busing, and because of other variable causes affecting class size. Nevertheless, the parties shall make reasonable effort to maintain class size at reasonable, workable, and educationally effective levels in all situations. 11-3 TEACHER LOAD 11-3-1 Teaching load shall be defined as the number of separate class preparations that a teacher has per school day as delineated in the course description guide.
TEACHING HOURS AND TEACHING LOAD Section 1 Work Day For the applicable agreement period, the normal work day will be seven and one-quarter (7 ¼) hours including arrival time fifteen (15) minutes before and departure time (15) minutes after the students’ school day. The normal work day will include uninterrupted prep time. The Building Principal, as authorized by the Superintendent, upon request of a teacher or group of teachers, may waive the requirement to remain fifteen (15) minutes after the school day for a specific day or days. It is recognized; however, that the proper performance of their duties may, on occasion, require these persons to work longer than the normal work day, i.e. for conferences, faculty meetings, department meetings, etc. Therefore, “mandatory meetings will occur two times per month and be no longer than 90 minutes in length, inclusive of the additional 15 minutes beyond the scheduled student school day. A schedule of the meetings will be distributed by June 30th of the previous school year, but may be changed at the discretion of the Principal with 48 hours’ notice.” Teachers will also remain at school after the fifteen (15) minutes described above, during one (1) day each calendar week for such periods of time as is necessary to provide students extra help, and/or to meet with parents or guardians, concerning the progress of their children or wards. No teacher shall be required to work more than a normal seven and one- quarter (7 ¼) hour day, including fifteen (15) minutes before and (15) minutes after the students’ school day, which will include uninterrupted prep time; this provision does not apply to other contractually agreed upon time and meetings. Should state law require a longer instructional day, or more days, the teachers shall work the added time and the parties shall immediately commence impact bargaining on the issue. This article does not purport to cover the arrival and departure time of teachers involved in special assignments. Section 2 Other Personnel Personnel other than classroom teachers will work at their assigned tasks for the length of the regular teachers' work day. The exact daily schedule will be worked out on an individual basis between the Administration and the employee with notification to the Association. Instructional Coaches are required to work an additional five (5) days at their per diem rate, beyond the work year for a total of 189 days. These days will be determined prior to the start of the new school year and at the discretion of the Superintendent and the Chief Academic Officer.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and PCS, PCS shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs. 2.4.2 Prior to ordering any Two-Way Interconnection Trunks from Verizon, PCS shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Second (Hundred Call Second) information, and the Parties shall mutually agree on the appropriate initial number of Two-Way End Office and Tandem Interconnection Trunks and the interface specifications at the Point of Interconnection (POI). Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One-Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.3 Two-Way Interconnection Trunks shall be from a Verizon End Office or Tandem to a mutually agreed upon POI. 2.4.4 On a semi-annual basis, PCS shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that PCS anticipates Verizon will need to provide during the ensuing two (2) year period to carry traffic from PCS to Verizon and from Verizon to PCS. PCS’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Second (Hundred Call Second) equal to five (5). 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and PCS shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three
Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.
Distribution Compliance Period The Purchaser agrees not to resell, pledge or transfer any Purchased Shares within the United States or to any U.S. Person, as each of those terms is defined in Regulation S, during the 40 days following the Closing Date.
One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.
INTERIM MAINTENANCE PERIOD During the interim maintenance period between obtaining of the completion certificate of such Project and formation and operationalization of the Association the Promoter shall through itself or through a facility management company to run, operate, manage and maintain the Common Areas. The Promoter shall endeavour that the committee responsible for the maintenance and operation of the Common Areas will be required to provide manpower for maintaining the Common Areas, wherever required, and to collect maintenance charges and also guest charges and the user charges for the utilities being provided on “pay by use” basis, if any. The maintenance and management of Common Areas by the committee will primarily include but not limited to maintenance of water works, common electrical installations, DG Sets, landscaping, driveways, parking areas, lobbies, lifts and staircases, AMC’s etc. It will also include safety and security of the Project such as fire detection and protection and management of general security control of the Project. The Rules/ Bye Laws to regulate the use and maintenance of the Common Areas shall during the interim maintenance period shall be framed by the Promoter with such restrictions as may be necessary for proper maintenance and all the Allottees are bound to follow the same. After the Common Areas of the Project are handed over to the Association, the Association may adopt the Rules and the Bye laws framed by the Promoter, with or without amendments, as may be deemed necessary by the Association.