Extracurricular Activities Effective July 1, 2009, stipends for participation in extracurricular activities which are authorized by the appointing authority shall be: Inland $950/year Sailing $400/year Art Club Advisor $300/year Drama Club Advisor $300/year Cross Country Skiing $150/year Boys’ Basketball $1000/year Girls’ Basketball (if class D) $1000/year Asst. Boys’ Basketball $750/year Asst. Girls’ Basketball (if class D) $750/year Scorekeeper/Timekeeper $10/game Soccer $400/year Track $400/year Cross County Running $400/year Girls’ Basketball (if not class D) $400/year Sports Activity Director $400/year Athletic Director $200/year
High Risk Activities 1. The Software is not fault-tolerant and is not designed, manufactured or intended for use or resale as on-line control equipment in hazardous environments requiring fail-safe performance, such as in the operation of nuclear facilities, aircraft navigation or communication systems, air traffic control, direct life support machines, or weapons systems, in which the failure of the Software could lead directly to death, personal injury, or severe physical or environmental damage ("High Risk Activities"). Syncro and its suppliers specifically disclaim any express or implied warranty of fitness for High Risk Activities.
Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.
Working and Labor Synergies The Contractor shall be responsible for maintaining a tranquil working relationship between the Contractor work force, the Contractor Parties and their work force, State employees, and any other contractors present at the work site. The Contractor shall quickly resolve all labor disputes which result from the Contractor's or Contractor Parties’ presence at the work site, or other action under their control. Labor disputes shall not be deemed to be sufficient cause to allow the Contractor to make any claim for additional compensation for cost, expenses or any other loss or damage, nor shall those disputes be deemed to be sufficient reason to relieve the Contractor from any of its obligations under the Contract.
First Aid Attendants a) Designated First Aid Attendants shall receive their job rate of pay plus the Ticket Premium rate. All other employees holding valid First Aid Tickets shall receive a premium of five cents (5¢) per hour over and above their job rate. There shall be no stacking or pyramiding of premiums. b) Where a company is paying a bonus or premium(s) greater than set out above, it shall keep such policy in effect. c) Effective July 1, 1994, premiums for designated First Aid Tickets shall be: Xxxxx 0 - $0.85 per hour Xxxxx 0 - $0.50 per hour
Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf): a. Foundational Programs and Capabilities (As specified in Public Health Modernization Manual) b. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Accountability Metric: c. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Modernization Process Measure:
Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.
EXTRA-CURRICULAR ACTIVITIES 1. In this Agreement, extra-curricular programs and activities include all those that are beyond the provincially prescribed and locally determined curricula of the school district. 2. The Board and the Association consider it desirable that teachers participate in extra-curricular activities, and recognize that participation in extra-curricular activities by the individual teacher is on a voluntary basis.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
TRAINING AND EMPLOYEE DEVELOPMENT 9.1 The Employer and the Union recognize the value and benefit of education and training designed to enhance an employee’s ability to perform their job duties. Training and employee development opportunities will be provided to employees in accordance with Employer policies and available resources. 9.2 Attendance at employer-required training will be considered time worked. The Employer will make reasonable attempts to schedule employer-required training during an employee’s regular work shift. The Employer will pay the registration and associated travel costs in accordance with Article 23, Travel, for employer-required training.