Commissioning Duties and Responsibilities Sample Clauses

Commissioning Duties and Responsibilities. 4.5.4.1. Designer/Builder Duties and Responsibilities:
AutoNDA by SimpleDocs

Related to Commissioning Duties and Responsibilities

  • General Duties and Responsibilities 1. Responsibilities under the General Conditions of the Contract for Construction: In addition to the responsibilities herein set forth, Consulting Engineer/Architect agrees to be responsible for those matters identified in the General Conditions as being responsibilities of the Consulting Engineer/Architect. Consulting Engineer/Architect specifically acknowledges receipt of a copy of the General Conditions and acceptance of the responsibilities as set forth therein.

  • Duties and Responsibilities (a) The Auction Agent is acting solely as agent for the Company hereunder and owes no fiduciary duties to any other Person by reason of this Agreement.

  • SERVICES AND RESPONSIBILITIES 2.1 Contractor hereby agrees to perform the services described and for the fee set forth in the Scope of Work. The Contractor shall be solely responsible for the satisfactory and complete execution of the Scope Work. The Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, utilities, transportation and other facilities and services necessary for the proper execution and completion of the Scope of Work. The Scope of Work shall generally be performed at the direction of the NMCRA and completed and completed within that certain number of days from the issuance of a Work Order by the NMCRA to the Contractor (the “Term”). Time is of the essence in the performance of all obligations within the Term. Final Completion of the Scope of Work shall be completed prior to the expiration of the Term and the failure of the Contractor to do so shall be a material default under this Agreement. “

  • Roles and Responsibilities 1. The Donor States shall make funds available in support of eligible programmes proposed by the Beneficiary State and agreed on by the Financial Mechanism Committee within the priority sectors listed in Article 3.1 of Protocol 38c and the programme areas listed in the Annex to Protocol 38c. The Donor States and the Beneficiary State shall cooperate on the preparation of concept notes defining the scope and planned results for each programme.

  • SCOPE OF WORK AND RESPONSIBILITIES 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxxxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities SERVICE AGREEMENT NO. 2557 Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Xxxxxxxxx Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220, and the Connecting Transmission Owner’s ESB 750. As per the Project Specific Specifications, the Interconnection Customer will install the RTU provided by Connecting Transmission Owner in accordance with Connecting Transmission Owner’s ESBs, indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. (Note: If no indoor facility is available, then installation of the RTU and revenue metering equipment in a dedicated, weatherproof, heated cubicle (accessible only to Connecting Transmission Owner) is acceptable.) For the revenue metering, the Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications, ESB 752 and ESB 750. The Interconnection Customer shall mount the revenue metering CT/PT units, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install the meter socket enclosure near the Connecting Transmission Owner’s RTU in accordance with the Project Specific Specifications. Additional right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 301 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the Line 301 Tap line, access roads to/from the Line 301 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is responsible for all permitting. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of the Connecting Transmission Owner’s Interconnection Facilities.

  • Roles and Responsibilities of the Parties The AEDC and the URA each agree to assume and undertake their respective roles and responsibilities relating to the Project as set forth below:

  • Client’s Responsibilities In addition to other responsibilities herein or imposed by law, the Client shall:

  • ROLES AND RESPONSIBILITIES OF EACH PARTY Role of the Commonwealth

  • Responsibilities 1. Subject to the provisions of this Agreement, BNY shall with respect to each Specified Country select an Eligible Foreign Custodian. In connection therewith, BNY shall: (a) determine that assets of the Funds held by such Eligible Foreign Custodian will be subject to reasonable care, based on the standards applicable to custodians in the relevant market in which such Eligible Foreign Custodian operates, after considering all factors relevant to the safekeeping of such assets, including, without limitation, those contained in paragraph (c)(1) of the Rule; (b) determine that the Funds’ foreign custody arrangements with each Eligible Foreign Custodian are governed by a written contract with the Custodian which will provide reasonable care for the Funds’ assets based on the standards specified in paragraph (c)(1) of the Rule; (c) determine that each contract with an Eligible Foreign Custodian shall include the provisions specified in paragraph (c)(2)(i)(A) through (F) of the Rule or, alternatively, in lieu of any or all of such (c)(2)(i)(A) through (F) provisions, such other provisions as BNY determines will provide, in their entirety, the same or a greater level of care and protection for the assets of the Funds as such specified provisions; (d) monitor pursuant to the Monitoring System the appropriateness of maintaining the assets of the Funds with a particular Eligible Foreign Custodian pursuant to paragraph (c)(1) of the Rule and the performance of the contract governing such arrangement; and (e) advise the Funds whenever BNY determines under the Monitoring System that an arrangement (including, any material change in the contract governing such arrangement) described in preceding clause (d) no longer meets the requirements of the Rule.

  • Roles & Responsibilities During the MOU Period, the Parties will work together to develop the final scope of the CCA project. The Parties are entering into this MOU in good faith and final project approval is contingent on satisfactory completion of the milestones outlined in Appendix A. CCAG is solely responsible for all costs throughout the approval process. As applicable, CCAG shall maintain adequate insurance coverages for any work conducted on the property ("Property”) depicted in Appendix B during the MOU Period.