Compaction of Cohesive soil (Soil with clay & slit Sample Clauses

Compaction of Cohesive soil (Soil with clay & slit. Prior to any compaction, the earth fill layers shall have optimum moisture content as required in clause 6.6.4 of Indian Standard IS 4701-1982. This moisture content shall be fairly uniform throughout the layer. Optimum moisture content (OMC) is the moisture content that corresponds to the laboratory maximum dry density determined in accordance with IS 2720 (Part VII) 1973. In so far as practicable, the moistening of the material shall be performed at the site of excavation (borrow pits) but such moistening shall be supplemented, as required, by sprinkling water (Through fine water spray nozzle) at the site for compaction if necessary, If the moisture content is greater than OMC, the compaction operations shall be delayed until time the earth fill layer has dried to OMC. The moisture content of soils shall be determined in accordance with IS 2720 (Part III) 1982. Compaction shall preferably, be done by 8-10 T vibratory power rollers, non vibratory 8 - 10 Tonne power rollers or sheep foot rollers or other appropriate compaction equipment can also be deployed for compaction, as directed by the Engineer-in-Charge. Manual compaction shall not be allowed. Density tests shall be taken after compaction of each layer. The dry bulk density of the compacted layer shall be not less than 98% of the maximum dry bulk density at optimum moisture content (via 98% of xxxxxxx density). The dry density of soils in fill shall be determined in accordance with IS 2720 (Part XXVIII) 1974 by the sand replacement method or by IS (Part XXIX) 1975 by the core cutter method. The contractor has to ensure compaction to the specified density to the satisfaction of Engineer-in- Charge/his authorized representative. Permission for placement of next layer shall be given only after the earlier layer has been compacted to the specified density. The Engineer-in-Charge or his authorized representative may deploy "Portable electronic/Nuclear gauge density Testers" for rapid on site determination of compaction parameters (Moisture content, in place density and compaction efficiency in terms of % age of xxxxxxx density) to ensure requisite implementation of specification by the contactor.
AutoNDA by SimpleDocs

Related to Compaction of Cohesive soil (Soil with clay & slit

  • Creative Commons Attribution-Non-Commercial-NoDerivs License The Creative Commons Attribution Non-Commercial-NoDerivs License (CC-BY-NC-ND) permits use, distribution and reproduction in any medium, provided the original work is properly cited, is not used for commercial purposes and no modifications or adaptations are made. (see below) Use by commercial "for-profit" organizations Use of Wiley Open Access articles for commercial, promotional, or marketing purposes requires further explicit permission from Wiley and will be subject to a fee. Further details can be found on Wiley Online Library xxxx://xxxxxxx.xxxxx.xxx/WileyCDA/Section/id-410895.html Other Terms and Conditions:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Safety Glasses 10.3.1 Where a teacher is considered to be working in an “eye danger” area, the teacher shall receive a personal issue of standard neutral safety glasses which shall remain the property of the employer.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Gouvernement des États-Unis Le logiciel et la documentation constituent des « Commercial Items » (éléments commerciaux), tel que ce terme est défini dans la clause 48 C.F.R. (Code of Federal Rules) §2.101, consistant en « Commercial Computer Software » (logiciel) et « Commercial Computer Software Documentation » (documentation), tels que ces termes sont utilisés dans les clauses 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202. Conformément à la clause 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202-1 à 227.7202-4, le « Commercial Computer Software » et le « Commercial Computer Software Documentation » sont fournis sous licence au gouvernement des États-Unis (a) uniquement comme « Commercial Items » et (b) uniquement accompagnés des droits octroyés à tous les autres utilisateurs conformément aux termes et conditions ci-inclus. Droits non publiés réservés en vertu de la législation des droits d’auteur en vigueur aux États-Unis.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

Time is Money Join Law Insider Premium to draft better contracts faster.