Compatibility with ADOT’s provided data, is preferable Sample Clauses

Compatibility with ADOT’s provided data, is preferable. RAS FEE SCHEDULE Please find the current Fee Schedule from Roadway Asset Services, LLC. The included rates will be valid for PAG and local jurisdictions throughout the duration of the initial contract term. A detailed scope of work will be defined with each individual jurisdiction that elects to utilize this Fee Schedule. Task Additional Professional Services Units Unit Cost 1 Field Setup, GPS Network Creation and Pavement Data Collection for Local Roadway Network (Centerline Miles) - Single Pass Test 1 $135 4 Pavement Report without multi-year Budget Scenarios (lump sum) 1 $11,500 5 Pavement Widths Verification (Centerline Miles) 1 $18 6 RAS Hosted Videologger - PCI Data and Imagery (3-Years of Hosting and Maintenance Included) <500 Miles 1 $8,500 7 RAS Hosted Videologger - PCI Data and Imagery (3-Years of Hosting and Maintenance Included) 501-1000 Miles 1 $12,500 8 RAS Hosted Videologger - PCI Data and Imagery (3-Years of Hosting and Maintenance Included) >1001 Miles 1 $17,500 9 GIS Creation & Centerline Development (Centerline Miles) 1 $30 11 Pavement Report with 1 round of multi-year Budget Scenarios (lump sum) 1 $17,000 12 Cartegraph Pavement Condition Data Import (Per Agency) 1 $10,000 13 StreetSaver Pavement Condition Data Import (Per Agency) 1 $12,500 14 PAVER Pavement Condition Data Import (Per Agency) 1 $7,500 15 Lucity Pavement Condition Data Import (Per Agency) 1 $8,000 16 Asset Extraction - Pavement Markings (Centerline Miles) 1 $65 25 Asset Extraction - Bus Shelters/Pads (Centerline Miles) 1 $50 28 Asset Extraction - Fire Hydrants (Centerline Miles) 1 $50 34 Falling Weight Deflectometer (FWD) or Ground Penetrating Radar (GPR) testing for Arterial and Collector Roads (lane mile) 1 $180 35 Falling Weight Deflectometer (FWD) or Ground Penetrating Radar (GPR) testing for Local/Residential Roads (lane mile) 1 $210 36 Falling Weight Deflectometer (FWD) analysis and reporting (SCI value in tables) (lane mile) 1 $198 37 Falling Weight Deflectometer (FWD) or Ground Penetrating Radar (GPR) analysis and reporting (SCI value in tables and GPR thickness tables) (lane mile) 1 $396 38 Mobilization for Falling Weight Deflectometer (FWD) or Ground Penetrating Radar (GPR) testing (lump sum) 1 $10,000 39 Traffic Control for Falling Weight Deflectometer (FWD) or Ground Penetrating Radar (GPR) testing (day) 1 $2,000 40 Sr GIS Analyst (Hours) 1 $150 41 GIS Analyst (Hours) 1 $110 42 Sr. Pavement Contractor (Hours) 1 $275
AutoNDA by SimpleDocs

Related to Compatibility with ADOT’s provided data, is preferable

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Data Encryption Contractor must encrypt all State data at rest and in transit, in compliance with FIPS Publication 140-2 or applicable law, regulation or rule, whichever is a higher standard. All encryption keys must be unique to State data. Contractor will secure and protect all encryption keys to State data. Encryption keys to State data will only be accessed by Contractor as necessary for performance of this Contract.

  • Compatibility 1. Any unresolved issue arising from a mutual agreement procedure case otherwise within the scope of the arbitration process provided for in this Article and Articles 25A to 25G shall not be submitted to arbitration if the issue falls within the scope of a case with respect to which an arbitration panel or similar body has previously been set up in accordance with a bilateral or multilateral convention that provides for mandatory binding arbitration of unresolved issues arising from a mutual agreement procedure case.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Exceptional Access to Thick Registration Data In case of a registrar failure, deaccreditation, court order, etc. that prompts the temporary or definitive transfer of its domain names to another registrar, at the request of ICANN, Registry Operator will provide ICANN with up-­‐to-­‐date data for the domain names of the losing registrar. The data will be provided in the format specified in Specification 2 for Data Escrow. The file will only contain data related to the domain names of the losing registrar. Registry Operator will provide the data as soon as commercially practicable, but in no event later than five (5) calendar days following ICANN’s request. Unless otherwise agreed by Registry Operator and ICANN, the file will be made available for download by ICANN in the same manner as the data specified in Section 3.1 of this Specification.

  • Jointly Provided Switched Access Services 7.5.1 Jointly Provided Switched Access Service is described and governed by the FCC and state access Tariffs, Multiple Exchange Carrier Access Billing (MECAB) and Multiple Exchange Carrier Ordering and Design (MECOD) Guidelines and based on LERG routing, and is not modified by any provisions of this Agreement. Both Parties agree to comply with such guidelines. CenturyLink and CLEC agree that the originating, intermediate, and terminating LECs for switched access will cooperatively determine the Jointly Provided Switched Access arrangements in which all parties concur.

  • Workstation/Laptop encryption All workstations and laptops that process and/or store DHCS PHI or PI must be encrypted using a FIPS 140-2 certified algorithm which is 128bit or higher, such as Advanced Encryption Standard (AES). The encryption solution must be full disk unless approved by the DHCS Information Security Office.

  • Monthly Data Download Not later than fifteen (15) days after the end of each month, beginning with the month in which the Commencement Date occurs and ending with the Final Shared-Loss Month, Assuming Institution shall provide Receiver:

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

Time is Money Join Law Insider Premium to draft better contracts faster.