Construction and Installation Schedule Sample Clauses

Construction and Installation Schedule. Company will submit a schedule depicting the estimated time required to complete each phase of the construction and installation of the displays and improvements called for in the final plans. All improvements and displays installed by Company in the Premises will be of high quality, safe, and fire resistant materials. All plans and specifications for the improvements, displays and equipment constructed or installed by Company, its agents, or subcontractors, will conform to all applicable statutes, ordinances, building codes, rules and regulations. Company will obtain, at its own expense, all necessary building permits.
AutoNDA by SimpleDocs
Construction and Installation Schedule. The Airline will submit a schedule depicting the estimated time required to complete each phase of the construction and installation of the displays and improvements called for in the final plans. All improvements and displays installed by the Airline in its Airline Premises will be of high quality, safe, and fire-resistant materials. All plans and specifications for the improvements, displays and equipment constructed or installed by the Airline or any Airline Party will conform to all Applicable Laws. The Airline will obtain, at its own expense, all necessary building permits.
Construction and Installation Schedule. The timetables and milestones for Project construction and installation should be contained in this schedule. Any penalties for late installation should also be documented here. Documentation of required insurance, sub-Contractor lists and any MBE/WBE required subcontracts can be included in this schedule or broken out into a separate schedule. NOTE: It is important that the construction/installation phase of the Project (for example bonds and insurance) be treated in compliance with individual institutional requirements and the appropriate governing statutes. Since construction is just one component of the overall Project, a separate construction contract may be desirable and in some cases necessary. The construction contract would then be referred to in the body of the contract and attached as an exhibit, appendix or other type of attachment. Another approach would be to consolidate the appropriate construction language for inclusion in the body of the final contract. This will need to be decided as appropriate on a case-by-case basis. SCHEDULE G: SYSTEMS START-UP AND COMMISSIONING; OPERATING PARAMETERS OF INSTALLED EQUIPMENT This section should specify the performance testing procedures that will be used to start-up and commission the installed equipment and total system. The schedule also provides for the Owner to be notified of and have the right to be present during all commissioning procedures. This schedule should contain a provision for the documentation of the client's attendance at the various tests and acceptance of the Contractor’s certification that the tests followed the specified procedures and met or exceed the expected results. Use of manufacturer’s start up and performance sheets are required. The operating parameters should contain any specified parameters for the operation of the installed equipment such as temperature setbacks, equipment run times, load controlling specifications and other conditions for the operation of the equipment. SCHEDULE H:
Construction and Installation Schedule. During the Implementation Period, Xxxxxxx will perform the Work in accordance with the following schedule: Milestones - Components Min Days Start Finish 1 Construction/Installation 1.01 GESA Award and Amendment Execution 6 11/21/2023 11/27/2023 1.02 Subcontractor Notices to Proceed 10 11/27/2023 12/7/2023 1.03 Award Subcontracts (time varies due to lead times/design) 81 11/27/2023 2/16/2024 1.04 Complete permit documents 99 12/7/2023 3/15/2024 1.05 Equipment submittal/approval (varies due to lead times/design) 25 12/18/2023 1/12/2024 1.06 Equipment lead time except air-cooled chiller plant at the SHS 168 1/12/2024 6/28/2024 1.07 2nd shift mobilization 53 4/15/2024 6/7/2024 1.08 Summer schedule begins for full-day construction 61 6/10/2024 8/10/2024 1.09 Teachers First Day Back 0 8/20/2024 8/20/2024 1.10 Punchlist Completion except air-cooled chiller plant at the SHS 11 8/10/2024 8/21/2024 1.11 Schools ready for teachers and students 0 8/22/2024 8/22/2024 1.12 O&M As-builts/Closeout except air-cooled chiller plant at the SHS 28 8/12/2024 9/9/2024 1.13 Commissioning except air-cooled chiller plant at the SHS 72 8/20/2024 10/31/2024 1.14 Training except air-cooled chiller plant at the SHS 5 8/12/2024 8/17/2024

Related to Construction and Installation Schedule

  • Delivery and Installation Delivery

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • Construction of Public Improvements a. Upon satisfaction of the conditions set forth in Paragraph 2.1 and the notice requirement set forth below, Developer shall construct the Public Improvements at its own expense in accordance with this Agreement, the Final Plat, the Resolution, the Civil Engineering Construction Plans, the Town’s ordinances, resolutions and regulations and all other applicable laws and regulations. All Public Improvements shall be installed and constructed within the rights- of-way or easements dedicated to the Town. Unless otherwise approved by the Town in writing, all materials used for constructing the Public Improvements shall be materials set forth on the Town’s approved material list. Workmanship and materials shall be of good quality.

  • CONSTRUCTION AND IMPROVEMENTS Concessionaire shall not affix, alter, or erect any permanent or temporary equipment, structures, buildings, or additions to the Concession Premises without first obtaining the prior written approval of Department.

  • MAINTENANCE, REPAIRS, OR ALTERATIONS The Tenant shall, at their own expense and at all times, maintain premises in a clean and sanitary manner, and shall surrender the same at termination hereof, in as good condition as received, normal wear and tear excepted. The Tenant may not make any alterations to the leased premises without the consent in writing of the Landlord. The Landlord shall be responsible for repairs to the interior and exterior of the building. If the Premises includes a washer, dryer, freezer, dehumidifier unit and/or air conditioning unit, the Landlord makes no warranty as to the repair or replacement of units if one or all shall fail to operate. The Landlord will place fresh batteries in all battery-operated smoke detectors when the Tenant moves into the premises. After the initial placement of the fresh batteries it is the responsibility of the Tenant to replace batteries when needed. A monthly "cursory" inspection may be required for all fire extinguishers to make sure they are fully charged.

  • Delivery & Installation a) Subject to the conditions of the contract, the delivery of the goods and completion of the related services shall be in accordance with the delivery and completion schedule specified in the bidding document. The details of supply/ shipping and other documents to be furnished by the successful/ selected bidder are specified in the bidding document and/ or contract.