Crab Creek Site Sample Clauses

Crab Creek Site. The third site is located on the mainstem Xxxxx River on the south bank of the Xxxxx River upstream of the Crab Creek Bridge on USFS land which is approximately ten miles upstream of the confluence with Swift Creek Reservoir and one mile downstream of Lower Falls. An acclimation pond constructed in the Xxxxx River is proposed at the outlet of Crab Creek. This pond will receive flow from both Crab Creek and hyporheic flow from the Xxxxx River (see attached drawings). An existing pool at this location would be deepened and widened to allow for fish acclimation and a net structure with ½-inch mesh would be placed at the outlet to prevent escapement. Natural structures will be installed in and surrounding this pond to promote fish retention and provide cover for fish. The completed rearing area will have an approximate volume of 2,500 ft3 with the capacity to rear up to 33,000 fish. The pond would be activated in the fall just after Labor Day. An outflow structure will pass water from the pond into the Xxxxx River. Fish will be placed into the pond structure directly from a fish truck. Operation and protocols would be similar to those at the other two sites although fish will be released based on time-in-pond rather than size unless there are some outmigration behaviors exhibited. Because of the uncertainty with this type of rearing structure the ACC has elected to place fewer fish at Crab Creek until the reliability of this design can be verified. Approximately 15,000 fish will be stocked at this site in 2012. We expect that one person will access the site daily in the beginning and approximately three times a week. Fish will be volitionally released beginning in about mid-October by removing the barrier net and allowing the fish free access to the mainstem Xxxxx River. After the majority of the fish have departed, the pond rock structure will be left in place and the outlet reassembled just prior to the next year’s rearing time. This option allows for little to no further disturbance to the riparian area. It also allows for flexibility such that if this site does not seem to be effective, it could be easily obliterated and fish reared at an alternative location such as Muddy River, Clear Creek or Eagle Cliffs. There may be some fish that elect to stay in the pond area so there will not be any attempt to force them to exit. For the above three sites, operational details are provided in the Technical memorandum included with the final design drawings (see xxxx...
AutoNDA by SimpleDocs

Related to Crab Creek Site

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Employee Facilities Employee Facilities. Restrooms and attendant facilities shall be provided as required in the orders and regulations of the State of Washington Department of Labor and Industries. A good faith effort will be made by the Employer to provide facilities for employees’ personal belongings.

  • TEACHER FACILITIES A. The Board shall provide for each actively employed teacher: 1. A serviceable desk, chair and computer. 2. Access to a dining table. 3. A lockable desk, file cabinet or closet in which teachers may store instructional materials and supplies. 4. An appropriately furnished room to be reserved for the exclusive use of staff as a faculty lounge. Said room will be regularly cleaned by the custodial staff and will be in addition to the other teacher work areas. However, staff will be expected to keep the lounge reasonably neat and orderly. 5. Access to well-lighted and clean employee restrooms, separate from the students' restrooms with appropriate supplies. 6. Storage facilities for special instructional personnel. 7. In accordance with applicable food and nutrition guidelines, the principal, at request by a majority of the teachers, may arrange for the installation of a maximum of two faculty vending machines in each faculty lounge. All proceeds from the machines shall be used in such manner as the majority of teachers and educational support employees of that building shall determine. Cost, if any, of installation shall be borne by the teachers and educational support employees of each school. B. Where feasible in existing buildings, and in all new buildings, the following will be provided. 1. A teacher work area containing adequate equipment and supplies to aid in the preparation of instructional materials. 2. A communication system so that teachers can communicate with the main office from their classrooms, provided that such system is used only for emergency announcements during class periods. 3. Space for teachers' dining in a faculty lounge or other room unavailable to students with tables and chairs sufficient to accommodate teachers during their lunch period. C. Teachers shall report in writing to the principal any condition considered unsafe or hazardous. The principal shall take action(s) as appropriate and shall notify the teacher in writing of such action(s) taken within five (5) days. D. A telephone will be made available for teachers to use for school business. Teachers and principals shall arrange this use to provide reasonable privacy during the call. During the workday, teachers may make personal phone calls only if the calls cannot be made at any other time. E. Teachers who need access to a telephone for school business after the workday ends shall arrange this access with the principal. Teachers with supervisory responsibilities will also have access to the building. F. An adequate portion of the parking lots at each school will be reserved for teacher parking. Effective July 1, 2012, newly hired employees assigned to the South East Street Central Office location will be required to pay a fee of $45 per month if they elect to park in designated BOE parking areas. Twelve-month employees may elect payroll deduction to allocate payments over 24 equal paychecks. Eleven-month employees may elect payroll deduction to allocate payments over 22 equal paychecks. Ten-month employees may elect payroll deduction to allocate payment over 20 equal paychecks. G. The Board will take steps to ensure teachers have access to their classrooms when custodians unlock the buildings in the morning and up to one (1) hour before custodial shifts end on weekdays during the school year, provided rooms are not being utilized by outside user groups. Teachers shall have access to their rooms during summer operating hours during summer months unless there is scheduled maintenance, outside user groups or FCPS programs occurring.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to ICG.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!