Custodial/Maintenance Work Schedule Sample Clauses

Custodial/Maintenance Work Schedule. The regular work week for all custodians/maintenance employees shall be Monday through Friday. The regular work year shall be 260 days including holidays, except in leap year, which shall be 261 days including holidays. The regular work hours shall be forty (40) hours per week and 8 hours per day, exclusive of lunch for the position of mechanic but inclusive of lunch for custodians. The custodians will remain in their buildings during lunch “on call” to handle emergencies. Split schedules shall not be required except in the position of mechanic. The mechanic’s schedule shall be split by a noontime break sufficient in length to permit radio coverage for AM and PM regular bus runs within the mechanic’s scheduled 8 hours. When no students are in the building, custodians may, with superintendent approval, be able to work first shift with no loss in differential. Custodians may with approval of administration be assigned to work four (4) ten (10) hour days during the summer months. A day of leave in this instance will be allocated on a 1.25 day basis (i.e. 10 hours).
AutoNDA by SimpleDocs

Related to Custodial/Maintenance Work Schedule

  • Custodial/Maintenance Custodian, Buildings/Grounds Maintenance 20.5 Nutrition Services: Kitchen Manager, Kitchen Assistant ARTICLE IV – LEAVES Leave may only be taken in 30 minute increments. Except for emergency situations, unit members must complete the absence request form which includes obtaining their administrator’s written approval prior to taking leave. In emergency situations, the unit member is required to contact their administrator as far in advance of their scheduled work as possible.

  • MAINTENANCE WORK Landlord reserves the right from time to time, but subject to payment by and/or reimbursement from Tenant as otherwise provided herein: (i) to install, use, maintain, repair, replace, relocate and control for service to the Premises and/or other parts of the Project pipes, ducts, conduits, wires, cabling, appurtenant fixtures, equipment spaces and mechanical systems, wherever located in the Premises or the Project, (ii) to alter, close or relocate any facility in the Premises or the common areas or otherwise conduct any of the above activities for the purpose of complying with a general plan for fire/life safety for the Project or otherwise, and (iii) to comply with any federal, state or local law, rule or order. Landlord shall attempt to perform any such work with the least inconvenience to Tenant as is reasonably practicable, but in no event shall Tenant be permitted to withhold or reduce Basic Rental or other charges due hereunder as a result of same, make any claim for constructive eviction or otherwise make any claim against Landlord for interruption or interference with Tenant's business and/or operations.

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Operating and Maintenance Manuals 58.1 If “as built” Drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the Contract Data.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Installation and Maintenance Except for the bi‐directional and production metering equipment owned by the City, all equipment on Customer’s side of the delivery point, including the required disconnect device, shall be provided and maintained in satisfactory operating condition by Customer and shall remain the property and responsibility of the Customer. The City will bear no responsibility for the installation or maintenance of Customer’s equipment or for any damage to property as a result of any failure or malfunction thereof. The City shall not be liable, directly or indirectly for permitting or continuing to allow the interconnection of the Facility or for the acts or omissions of Customer or the failure or malfunction of any equipment of Customer that causes loss or injury, including death, to any party.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • REPAIRS; MAINTENANCE The Owner hereby gives power to the Agent to supervise repairs, improvements, alterations, and decorations to the Property as well as purchase and pay bills for services and supplies. The Agent shall obtain prior approval of the Owner for all expenditures over $ for any single item. Prior approval for lesser amounts shall not be required for monthly or recurring operating charges or if emergency expenditures over the maximum are, in the Agent’s opinion, needed to protect the Property from damage, prevent injury to persons, avoid suspension of necessary services, avoid penalties or fines, or suspension of services to tenants required by a lease or rental agreement or by law, including, but not limited to, maintaining the Property in a condition fit for human habitation as required by applicable law.

Time is Money Join Law Insider Premium to draft better contracts faster.