Cypress Corridor Project Mitigation Sample Clauses

Cypress Corridor Project Mitigation. The Cypress Corridor in the northeast portion of the City of Oakley is included in the HCP/NCCP’s Urban Development Area. However, Oakley has completed or is near completion of its environmental review of many projects in the area. The proponents of these projects will pursue, or are currently pursuing, independent take authorizations under Section 7 of FESA and/or CESA. As the result of discussions with the project proponents, the Wildlife Agencies have identified substantial, mutually agreeable additions of land to the Preserve System and funding for HCP/NCCP implementation that they expect will provide sufficient mitigation for the projects without compromising the overall viability of the Preserve System or the Implementing Entity’s ability to meet HCP/NCCP goals and objectives. (Copies of the June 1, 2006 agreement between the Wildlife Agencies and the project proponents, the “East Cypress HCP/NCCP Memorandum of Agreement,” may be obtained from CDFG or the Implementing Entity.) If such projects receive independent take authorizations under FESA and CESA based on these alternative mitigation requirements, the projects will not be Covered Activities or otherwise be covered by or subject to the HCP/NCCP or this Agreement, and will not receive take authorization under the Permits. However, the Parties agree that the take resulting from such projects and the mitigation provided will be accounted for in the HCP/NCCP and this Agreement as if the projects were Covered Activities for purposes of calculating Stay Ahead and Rough Proportionality requirements in accordance with Section 9.2 and Section 9.3 of this Agreement and with Chapter 8.6.1 of the HCP/NCCP and will be credited toward the obligations set forth in Conservation Measure 1.1.
AutoNDA by SimpleDocs

Related to Cypress Corridor Project Mitigation

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Collocation Transfer of Responsibility Without Working Circuits The Collocation is not serving any End User Customers and does not have active service terminations (e.g., Interconnection trunks or UNE Loops) or 2) Collocation Transfer of Responsibility With Working Circuits – The Collocation has active service terminations, such as Interconnection trunks or is serving End User Customers.

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

Time is Money Join Law Insider Premium to draft better contracts faster.