Description of the Points of Interconnection and Points of Change of Ownership Sample Clauses

Description of the Points of Interconnection and Points of Change of Ownership. The Point of Interconnection (“POI”) and Point of Change in Ownership (“PCO”) are identified in the table below and shown in Figures C-1, C-2, and C-3 below. The POI and PCO are the same location since the Transmission Project will not require any Connecting Transmission Owner’s Attachment Facilities. The POI/PCO locations are: Transmission Line Line # Designation Structure Number where POI/PCO Is Located Structure Description where POI/PCO Is Located Description of Change in Ownership Churchtown Substation towards Craryville Substation Tap 984 2159.5 Deadend tower Transmission Developer ownership will include structure # 2159.5 and conductor, insulators, and hardware heading west towards the Churchtown Substation (See Figure C-1) Falls Park Substation Tap towards Valkin Substation 19 Existing tower L-730- 12 Deadend tower CTO ownership will include existing structure # L-730-12, jumper loops, insulators and hardware from the Transmission Developer end of the jumper loops, and conductor heading east towards the existing Falls Park Substation (See Figure C-2) Falls Park Substation Tap towards Xxxxxx Substation 20 Existing tower L-731- 12 Deadend tower CTO ownership will include existing structure # L-731-12, jumper loops, insulators, and hardware from the Transmission Developer end of the jumper loops, and conductor heading east towards the existing Falls Park Substation (See Figure C-3) Figure C-1 Figure C-2 Figure C-3
AutoNDA by SimpleDocs
Description of the Points of Interconnection and Points of Change of Ownership. The Point of Interconnection (“POI”) and Point of Change in Ownership (“PCO”) are identified in the table below and are also shown in the POI one line diagrams that follow. The POI and PCO are the same location since the Transmission Project will not require any Connecting Transmission Owner’s Attachment Facilities, as the transfer of ownership of the feeders occurs at the tower insulator hardware. The POI/PCO locations are: Transmission Line Line # Designation Structure Number where POI/PCO Is Located Structure Description where POI/PCO Is Located Description of Change in Ownership Schodack – Valkin Transition 14 2002.3 Double Circuit Deadend Tower Transmission Developer will own the structure, jumpers, connectors, etc. necessary to connect the Connecting Transmission Owner’s conductors and OPGW/ OHGW to the Transmission Developer’s facilities at the POI/PCO. Connecting Transmission Owner will own the transmission line on the Connecting Transmission Owner’s side of the structure (including the hardware necessary to deadend Connecting Transmission Owner’s conductor and OHGW onto the structure). (hereinafter referred to as Transmission Line Line # Designation Structure Number where POI/PCO Is Located Structure Description where POI/PCO Is Located Description of Change in Ownership “Typical Deadend” See Figure C-15 ). (See Figure C- 1 for POI detail) Xxxxxxxxxxxxx – Alps 6 1 Deadend tower Connecting Transmission Owner will own the structure, jumpers, and transmission line on the Connecting Transmission Owner’s side. Transmission Developer will own the transmission line on the Transmission Developer’s side of the structure (including the hardware necessary to deadend Transmission Developer’s conductor) (See Figure C-2) New Scotland - Xxxxxxxxxxxxx 2 77 3 pole deadend Connecting Transmission Owner will own the structure, jumpers, and transmission line on the Connecting Transmission Owner’s side. Transmission Developer will own the transmission line on the Transmission Developer’s side of the structure (including the hardware necessary to deadend Transmission Developer’s conductor) (See Figure C-3) Schodack - Valkin 14 2031.1 Deadend Tower Typical Deadend (See Figure C-4) Valkin - Falls Park 19-730 2031.2 Deadend Tower Typical Deadend (See Figure C-5) Transmission Line Line # Designation Structure Number where POI/PCO Is Located Structure Description where POI/PCO Is Located Description of Change in Ownership Falls Park - Hudson 20-731 2122.3 Deadend Pole Typic...

Related to Description of the Points of Interconnection and Points of Change of Ownership

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection.

  • Points of Interconnection As and to the extent required by Section 251 of the Act, the Parties shall provide Interconnection of their networks at any technically feasible point as described in Section 4.3. To the extent the originating Party’s POI is not located at the terminating Party’s relevant IP, the originating Party is responsible for transporting its traffic from it’s POI to the terminating Party’s relevant IP.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Provision of Interconnection Financial Security The Interconnection Customer is obligated to provide all necessary Interconnection Financial Security required under Section 11 of the GIDAP in a manner acceptable under Section 11 of the GIDAP. Failure by the Interconnection Customer to timely satisfy the GIDAP’s requirements for the provision of Interconnection Financial Security shall be deemed a breach of this Agreement and a condition of Default of this Agreement.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Provision of Interconnection Service Transmission Provider and Interconnected Transmission Owner agree to provide for the interconnection to the Transmission System in the PJM Region of Interconnection Customer’s Customer Facility identified in the Specifications in accordance with Part IV and Part VI of the Tariff, the Operating Agreement of PJM Interconnection, L.L.C. (“Operating Agreement”), and this ISA, as they may be amended from time to time.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.