Transmission Project definition

Transmission Project shall have the meaning set forth in the Preamble of this Agreement.
Transmission Project shall have the meaning set forth in the Preamble of this Agreement. “Work” shall mean the Developer Required Actions and/or the Company Work, as applicable.
Transmission Project or "Project" mean the 230-kV and 92-kV transmission lines to be funded and constructed pursuant to this Agreement, including the facilities described in Exhibit 3 and all real property interests and other property and rights associated therewith. Transmission Service Entitlement

Examples of Transmission Project in a sentence

  • NYISO Minimum Interconnection Standard - The reliability standard that must be met by any generation facility or Class Year Transmission Project that is subject to NYISO’s Large Facility Interconnection Procedures in Attachment X to the ISO OATT or the NYISO’s Small Generator Interconnection Procedures in this Attachment Z, that is proposing to connect to the New York State Transmission System or Distribution System, to obtain ERIS.

  • NYISO Minimum Interconnection Standard – The reliability standard that must be met by any generation facility or Class Year Transmission Project that is subject to NYISO’s Large Facility Interconnection Procedures in Attachment X to the ISO OATT or the NYISO’s Small Generator Interconnection Procedures in this Attachment Z, that is proposing to connect to the New York State Transmission System or Distribution System, to obtain ERIS.

  • Prior to the In-Service Date of the Transmission Project or Network Upgrade Facilities, as applicable, the Transmission Developer and/or Connecting Transmission Owner shall test: (i) the Network Upgrade Facilities in accordance with Connecting Transmission Owner’s specifications and subject to Connecting Transmission Owner’s oversight and approval, and (ii) the Transmission Project to ensure safe and reliable operation, as such responsibilities are specified in Appendices A and B of this Agreement.

  • Transmission Developer shall operate the Transmission Project in accordance with NYISO and Connecting Transmission Owner requirements, as such requirements are set forth or referenced in Appendix C hereto.

  • Transmission Developer shall at its own expense operate, maintain and control the Transmission Project in a safe and reliable manner and in accordance with this Agreement, the NYISO Tariffs, ISO Procedures, and the Operating Agreement.


More Definitions of Transmission Project

Transmission Project means significant new AC or DC lines or facilities, or significant upgrades to existing lines or facilities, including network upgrades required by ISO-NE to accommodate
Transmission Project means significant new AC or DC lines or facilities, or significant upgrades to existing lines or facilities. As used in this RFP, Transmission Project does not refer to typical direct interconnection facilities or typical network upgrades built in each case solely associated with the interconnection of the clean energy project to the transmission system.
Transmission Project for a particular Party, means transmission lines and associated facilities located within or contiguous with the service territories of such Party’s (or any of such Party’s Subsidiaries’) regulated utilities in the United States or Canada, the assets of which would be subject to utility rate base calculations or regulated tariffs with the applicable utilities commission or similar authority.
Transmission Project means a project that is designed to:]
Transmission Project means significant new AC or DC lines or facilities, or significant upgrades to existing lines or facilities, including network upgrades required by ISO-NE to accommodate such new or upgraded facilities. A “Transmission Project” excludes local generator interconnection facilities.
Transmission Project shall have the meaning set forth in the recitals of this Agreement. Engineering & Procurement Agreement SERVICE AGREEMENT NO. 2534 EXHIBIT A SCOPE OF COMPANY WORK The Company estimates that its cost to complete the Company Work will be $2,592,119 for services as delineated in this Agreement. The Transmission Project identified by the NYISO as “Q#543 Segment B Project” and studied by the NYISO in its System Impact Study includes the following high-level scope of work: A new 54 mile 345/115 kV double-circuit transmission line from Schodack to Pleasant Valley; A new Xxxxxxxxxxxxx 345 kV switching station; The demolition and complete rebuild of the Churchtown switching station; Modifications to the existing Pleasant Valley 345 kV substation; A new Xxx Xxxxxx Capacitor Bank Substation; The retirement of various 115 kV lines between the Greenbush 115 kV station and Pleasant Valley 115 kV station. It is understood by the Parties that the current Transmission Project scope of work is materially consistent with the scope as listed above and as documented in the NYISO System Impact Study.
Transmission Project shall have the meaning set forth in the recitals of this Agreement. Engineering & Procurement Agreement SERVICE AGREEMENT NO. 2534 The Company estimates that its cost to complete the Company Work will be $2,592,119 for services as delineated in this Agreement.