Design-Builder Representations in a GMP Amendment Sample Clauses

Design-Builder Representations in a GMP Amendment. In the event the parties execute a GMP Amendment, the GMP Amendment shall be deemed to constitute a representation by the Design-Builder that: (1) It has examined, carefully studied, and thoroughly understands the Contract Documents associated with the Design-Build Work; (2) It has thoroughly reviewed and verified all information (except that the Design-Builder is not required to verify the information identified in subsection 4.5(B) other than as set forth therein) provided to or obtained by the Design-Builder through the performance of the Stage 1 Preliminary Services, including: Reports of explorations and tests of subsurface conditions at or contiguous to the Project Sites and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Project Sites which have been identified or made available by the City; and Reports as to Regulated Substances, if any, at the Project Sites which have been identified or made available by the City; (3) It has become familiar with and is satisfied as to the general, local, and Project Sites conditions that may affect cost, progress, and performance of the Design-Build Work; (4) It is familiar with and is satisfied as to all Applicable Law that may affect cost, progress, and performance of the Design-Build Work; (5) It is aware of the nature of the Related Projects and is satisfied that the Design-Build Work can be performed in accordance with the requirements concerning the Related Projects, as set forth in the Contract Documents; (6) It has considered the information known to the Design-Builder, including information commonly known to designers and contractors doing business in the locality of the Project Sites; information and observations obtained from visits to the Project Sites; and the Project Sites-related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on: The cost, progress, and performance of the Design-Build Work; The means, methods, techniques, sequences, and procedures of construction to be employed by the Design-Builder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and Design-Builder’s health and safety precautions and programs; (7) Based on all of the foregoing and the performance of the Stage 1 Preliminary Services, the Project Sites constitute acceptable and suitable ...
AutoNDA by SimpleDocs

Related to Design-Builder Representations in a GMP Amendment

  • Change Orders and Contract Amendments 33.1 The Procuring Entity may at any time order the Supplier through notice in accordance GCC Clause 8, to make changes within the general scope of the Contract in any one or more of the following: a) drawings, designs, or specifications, where Goods to be furnished under the Contract are to be specifically manufactured for the Procuring Entity; b) the method of shipment or packing; c) the place of delivery; and d) the Related Services to be provided by the Supplier. 33.2 If any such change causes an increase or decrease in the cost of, or the time required for, the Supplier's performance of any provisions under the Contract, an equitable adjustment shall be made in the Contract Price or in the Delivery/Completion Schedule, or both, and the Contract shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must be asserted within twenty-eight (28) days from the date of the Supplier's receipt of the Procuring Entity's change order. 33.3 Prices to be charged by the Supplier for any Related Services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services.

  • Execution of Change Orders Change Orders shall be signed by the Contractor, ordinarily certified by the Design Professional, and approved by the Owner in accordance with the form of Change Order prescribed by the Owner. No request for payment by the Contractor for a Change Order shall be due, nor shall any such request appear on an Application for Payment, until the Change Order is executed by the Owner. In the event of emergency (see Article

  • Assignment Amendments Waiver and Contract Complete A. AUDIT.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Complete Agreement; Modification of Agreement This Agreement constitutes the complete agreement among the parties hereto with respect to the subject matter hereof, supersedes all prior agreements and understandings relating to the subject matter hereof, and may not be modified, altered or amended except as set forth in Section 8.6.

  • SCOPE, WAIVER AND ALTERATION OF AGREEMENT (1) No agreement, alteration, understanding, variation, waiver or modification of any of the terms and conditions or covenants herein shall be made by any employee or group of employees with the Board unless executed in writing between the parties hereto and the same has been ratified by the Union and the Board. (2) The waiver of any breach or condition of this Agreement by either party shall not constitute a precedent in the future enforcement of the terms and conditions herein. (3) If any Article or Section of this Agreement or any supplement thereto should be held invalid by operation of law or by any tribunal of competent jurisdiction, or if compliance with or enforcement of any Article or Section should be restrained by such tribunal, the remainder of this Agreement and supplements shall not be affected thereby and the parties shall enter into immediate collective bargaining negotiations for the purpose of arriving at a mutually satisfactory replacement for such Article or Section.

  • Contract Amendment A. Contract Exhibit A, Scope of Work, is hereby deleted and replaced in its entirety with the attached Exhibit A, Scope of Work, which is incorporated into the Contract by reference herein. B. Contract Exhibit B, Additional Special Contract Conditions, is hereby deleted in its entirety and replaced with the attached Exhibit B, Additional Special Contract Conditions, which is incorporated into the ACS by reference herein. C. Contract Exhibit I, PUR 1355: Foreign Country of Concern Attestation, is hereby incorporated in its entirety to the ACS by reference herein.

  • COMPLETE AGREEMENT; AMENDMENTS This Agreement is the complete and exclusive agreement between the parties with respect to the subject matter contemplated thereby. No modifications to this Agreement shall be made or binding unless made in writing and signed by all parties to this Agreement.

  • CHANGE ORDERS AND AMENDMENTS A. Any alterations, additions, or deletions to the terms of this Agreement, which are required by changes in federal or state law or by regulations, are automatically incorporated without written amendment hereto, and shall become effective on the date designated by such law or by regulation. B. To ensure the legal and effective performance of this Agreement, both parties agree that any amendment that affects the performance under this Agreement must be mutually agreed upon and that all such amendments must be in writing. After a period of no less than 30 days subsequent to written notice, unless sooner implementation is required by law, such amendments shall have the effect of qualifying the terms of this Agreement and shall be binding upon the parties as if written herein. C. Customers have the right to issue a change order to any purchase orders issued to the Contractor for the purposes of clarification or inclusion of additional specifications, qualifications, conditions, etc. The change order must be in writing and agreed upon by Contractor and the Customer agency prior to issuance of any Change Order. A copy of the Change Order must be provided by the Contractor to, and acknowledged by, H-GAC.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.