Design of Study Sample Clauses

Design of Study. Phase I studies are exploratory and are usually performed in small groups of twenty (20) to forty (40) adults to assess the safety of the product and to detect the expected immune response [**]. Phase I studies might also be extended to the final target population [**]. The following general design is proposed at present. Each Phase I study will investigate a number of different dose levels (normally up to 4 dose levels) of Clinical Candidates [**] Schedule 1 Appendix 2 8 and involve [**] subjects per dose group. The studies will enrol male and female adult volunteer subjects [**]. Each subject will receive up to [**] doses of a single dose level. The doses will be administered at Time [**] month and [**] months after the first injection [**]. For reasons of safety, dose escalation will be [**]. Subjects will be dosed [**], such that the first [**] to be dosed will receive the lowest dose, the second [**] will receive the next highest dose with the third and fourth [**] receiving the third and fourth highest doses. Consideration of administering only [**] doses on Days [**] and [**] may also be appropriate. Alternatively, planning the study to administer [**] doses, but with a review of the [**] data after the second dose, with a view to stopping the administration of the third dose should [**] be seen after the second dose, might be worthy of consideration as this will shorten the Phase I development timelines. It is proposed that [**] dose levels will be included to establish a no effect/minimal effect dose group and to investigate if there is a dose response. Safety will be of primary importance. For this reason dose escalation will be done [**] with the lowest dose group dosed first and safety reviewed prior to the second dose group receiving their first dose. Following an appropriate safety review the third [**] will receive their first dose and if appropriately safe the final [**] will receive their first dose. Hence, the dosing of each subsequent [**] will occur approximately [**] days after dosing the preceding [**]. Subjects will receive their second dose [**] days after the first dose and their third dose [**] months after the first dose. Eligibility for administration of the second and third doses to individual volunteers will depend on the safety profile in the individual subjects following the first and second doses and will only be administered if a subject tolerates the first/second injection. Safety reviews will be conducted after each [**]...
AutoNDA by SimpleDocs

Related to Design of Study

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Evaluation of Students Acknowledging the District’s adopted grading system, the teacher shall maintain the right and responsibility to determine grades and other evaluation of a student. No grade or evaluation shall be changed except by the teacher with the approval of the building administrator.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall: 1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the Work to be performed and furnished by Contractor. 2. Visit the Site as needed to assist in preparing the final Drawings and Specifications. 3. Provide technical criteria, written descriptions, and design data for Owner’s use in filing applications for permits from or approvals of governmental authorities having jurisdiction to review or approve the final design; assist Owner in consultations with such authorities; and revise the Drawings and Specifications in response to directives from such authorities, as appropriate. 4. Advise Owner of any recommended adjustments to the opinion of probable Construction Cost. 5. After consultation with Owner, include in the Construction Contract Documents any specific protocols for the transmittal of Project-related correspondence, documents, text, data, drawings, information, and graphics, in electronic media or digital format, either directly, or through access to a secure Project website. Any such protocols shall be applicable to transmittals between and among Owner, Engineer, and Contractor during the Construction Phase and Post- Construction Phase, and unless agreed otherwise shall supersede any conflicting protocols previously established for transmittals between Owner and Engineer. 6. Assist Owner in assembling known reports and drawings of Site conditions, and in identifying the technical data contained in such reports and drawings upon which bidders or other prospective contractors may rely. 7. In addition to preparing the final Drawings and Specifications, assemble drafts of other Construction Contract Documents based on specific instructions and contract forms, text, or content received from Owner. 8. Prepare or assemble draft bidding-related documents (or requests for proposals or other construction procurement documents), based on the specific bidding or procurement-related instructions and forms, text, or content received from Owner. 9. Contract shall include contractor provided changeable message signs to communication construction information. 10. Furnish for review by Owner, its legal counsel, and other advisors, 6 copies of the final drawings and Specifications, assembled drafts of other construction Contract Documents, the draft bidding-related documents (or requests for proposals or other construction procurement documents), and any other final design Phase deliverables, by the established due date, with the Final Design Phase, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items, and any instructions for revisions. B. Engineer’s services under the Final Design Phase will be considered complete on the date when Engineer has delivered to Owner the final Drawings and Specifications, other assembled Construction Contract Documents, bidding-related documents (or requests for proposals or other construction procurement documents), and any other Final Design Phase deliverables. C. In the event that the Work designed or specified by Engineer is to be performed or furnished under more than one prime contract, or if Engineer’s services are to be separately sequenced with the work of one or more prime Contractors (such as in the case of fast- tracking), Owner and Engineer shall, prior to commencement of the Final Design Phase, develop a schedule for performance of Engineer’s services during the Final Design, Bidding or Negotiating, Construction, and Post-Construction Phases in order to sequence and coordinate properly such services as are applicable to the work under such separate prime contracts.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement.

  • Development Program RWJPRI shall be [**] and have [**] in consultation with the JDAC, to select LICENSED COMPOUNDS which shall then be designated PRODUCTS for further DEVELOPMENT by RWJPRI and marketing by ORTHO and its AFFILIATES. RWJPRI shall provide KOSAN with written notice of its decision to select a LICENSED COMPOUND for DEVELOPMENT. Once a PRODUCT has been selected for further DEVELOPMENT, RWJPRI, with the advice of the JDAC, shall have the [**] right to develop the PRODUCT through STAGES O, I, II and III and shall have the [**] right to prepare and file, and shall be the owner of, all applications for MARKETING AUTHORIZATION throughout the world. During such DEVELOPMENT efforts, KOSAN will assist RWJPRI as may be mutually agreed, at RWJPRI's expense, in chemical development, formulation development, production of labeled material and production of sufficient quantities of material for STAGE O and initial STAGE I studies. RWJPRI shall exercise diligent efforts, commensurate with the efforts it would normally exercise for products with similar potential sales volume and consistent with its overall business strategy, in developing such PRODUCT in accordance with the DEVELOPMENT PLAN established by RWJPRI. In the course of such efforts RWJPRI shall, either directly or through an AFFILIATE or SUBLICENSEE to which the license shall have been extended, take appropriate steps including the following: (i) in consultation with the JDAC, select certain LICENSED COMPOUNDS for STAGE O DEVELOPMENT; and (ii) establish and maintain a program reasonably designed, funded and resourced to obtain information adequate to enable the preparation and filing with an appropriate and properly empowered national regulatory authority all necessary documentation, data and [**] CERTAIN INFORMATION IN THIS EXHIBIT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THE OMITTED PORTIONS. other evidence required for IND non-rejection to commence and conduct human clinical trials of such PRODUCT. (iii) proceed following IND non-rejection to commence PHASE I, II, and III clinical trials, associated studies and such other work which RWJPRI reasonably deems to be required for subsequent inclusion in filings for MARKETING AUTHORIZATION; (iv) after such submissions are filed prosecute such submissions and file all reasonably necessary, reports and respond to all reasonable requests from the pertinent regulatory, authorities for information, data, samples, tests and the like.

  • Manufacturing Technology Transfer Upon AbbVie’s written request with respect to a given Collaboration CAR-T Product and Licensed Product, Caribou shall effect a full transfer to AbbVie or its designee (which designee may be an Affiliate or a Third Party Provider) of all Materials and Know-How Controlled by Caribou relating to the then-current process for the Manufacture of such Collaboration CAR-T Product and any corresponding Licensed Products (each, a “Manufacturing Process”). Caribou shall provide, shall cause its Affiliates to provide, and shall use Commercially Reasonable Efforts to assist AbbVie in causing all Third Party Providers to provide, all reasonable assistance requested by AbbVie to enable AbbVie (or its Affiliate or designated Third Party Provider, as applicable) to implement each Manufacturing Process at the facilities designated by AbbVie. If requested by AbbVie, such assistance shall include facilitating the entering into of agreements with applicable Third Party suppliers relating to such Collaboration CAR-T Product and any corresponding Licensed Products. Without limitation of the foregoing, in connection with the Manufacturing Process and related transfer: (a) Caribou shall, and shall cause its Affiliates to, make available to AbbVie (or its Affiliate or designated Third Party Provider, as applicable), and shall use Commercially Reasonable Efforts to assist AbbVie in causing all Third Party Providers to make available to AbbVie, from time to time as AbbVie may request, all Materials and Manufacturing-related Know-How Controlled by Caribou relating to each Manufacturing Process, including methods, reagents and processes and testing/characterization Know-How, and all documentation constituting material support, performance advice, shop practice, standard operating procedures, specifications as to Materials to be used, and control methods, that are necessary or reasonably useful to enable AbbVie (or its Affiliate or designated Third Party manufacturer, as applicable) to use and practice such Manufacturing Process; (b) Caribou shall cause all appropriate employees and representatives of Caribou and its Affiliates, and shall use Commercially Reasonable Efforts to assist AbbVie in causing all appropriate employees and representatives of Third Party Providers, to meet with employees or representatives of AbbVie (or its Affiliate or designated Third Party Provider, as applicable) at the applicable manufacturing facility at mutually convenient times to assist with the working up and use of each Manufacturing Process and with the training of the personnel of AbbVie (or its Affiliate or designated Third Party Provider, as applicable) to the extent necessary or reasonably useful to enable AbbVie (or its Affiliate or designated Third Party Provider, as applicable) to use and practice such Manufacturing Process; (c) Without limiting the generality of this Section 4.4.2, Caribou shall cause all appropriate analytical and quality control laboratory employees and representatives of Caribou and its Affiliates, and shall use Commercially Reasonable Efforts to assist AbbVie in causing all appropriate analytical and quality control laboratory employees and representatives of Third Party Providers, to meet with employees or representatives of AbbVie (or its Affiliate or designated Third Party Provider, as applicable) at the applicable manufacturing facility and make available all necessary equipment, at mutually convenient times, to support and execute the provision of all applicable analytical methods and the validation thereof (including all applicable Know-How, Information and Materials Controlled by Caribou, and sufficient supplies of all primary and other reference standards); (d) Caribou shall, and shall cause its Affiliates to, take such steps, and shall use Commercially Reasonable Efforts to assist AbbVie in causing Third Party Providers take such steps, as are necessary or reasonably useful to assist AbbVie (or its Affiliate or designated Third Party Provider, as applicable) in obtaining any necessary licenses, permits or approvals from Regulatory Authorities with respect to the Manufacture of the applicable Collaboration CAR-T Products and corresponding Licensed Products at the applicable facilities; and (e) Caribou shall, and shall cause its Affiliates to, provide, and shall use Commercially Reasonable Efforts to assist AbbVie in causing Third Party Providers to provide, such other assistance as AbbVie (or its Affiliate or designated Third Party Provider, as applicable) may reasonably request to enable AbbVie (or its Affiliate or designated Third Party Provider, as applicable) to use and practice each Manufacturing Process and otherwise to Manufacture the applicable Collaboration CAR-T Products and corresponding Licensed Products.

  • Preliminary Design Phase 30 percent plans) A. Proceed with Preliminary Design Phase after the completion of the Conceptual phase which includes: Acceptance by Owner of the Conceptual Report and any other Study and Report Phase deliverables; selection by Owner of a recommended solution; issuance by Owner of any instructions for use of Project Strategies, Technologies, and Techniques, or for inclusion of sustainable features in the design, and Indication by Owner of any specific modifications or changes in the scope, extent, character, or design requirements of the Project desired by Owner. 1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary drawings, outline specifications, and written descriptions of the Project. 2. Include on plans, property lines, structure locations, ownership names and contact information. 3. In preparing the Preliminary Design Phase documents, use any specific applicable Project Strategies, Technologies, and Techniques authorized by Owner during or following the Study and Conceptual Phase, and include sustainable features, as appropriate, pursuant to Owner’s instructions. 4. Provide necessary field surveys, topographic and utility mapping for Engineer’s design purposes. Comply with the scope of work and procedure for the identification and mapping of existing utilities as defined by Section A1.03 “Utility Requirements” and Section A1.04 “Survey Services” 5. Visit the Site as needed to prepare the Preliminary Design Phase documents. 6. Advise Owner if additional reports, data, information, or services of the types described are necessary and assist Owner in obtaining such reports, data, information, or services. 7. Continue to assist Owner with Project Strategies, Technologies, and Techniques that Owner has chosen to implement. 8. Based on the information contained in the Preliminary Design Phase documents, prepare a revised opinion of probable Construction Cost, and assist Owner in tabulating the various cost categories which comprise Total Project Costs. 9. Obtain and review Owner’s instructions regarding Owner’s procurement of construction services (including instructions regarding advertisements for bids, instructions to bidders, and requests for proposals, as applicable), Owner’s construction contract practices and requirements, insurance and bonding requirements, electronic transmittals during construction, and other information necessary for the finalization of Owner’s bidding-related documents (or requests for proposals or other construction procurement documents), and Construction Contract Documents. Also obtain and review copies of Owner’s design and construction standards, Owner’s standard forms, general conditions, supplementary conditions, text, and related documents or content for Engineer to include in the draft bidding-related documents (or requests for proposals or other construction procurement documents), and in the draft Construction Contract Documents, when applicable. 10. Development communication plan for project: considering the use of door hangers, letters, public meetings, changeable message boards. 11. Furnish 6 review copies of the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables to Owner by established due date, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items. 12. Revise the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables in response to Owner’s comments, as appropriate, and furnish to Owner 6 copies of the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other deliverables by the specified due date. 13. Engineer’s services under the Preliminary Design Phase will be considered complete on the date when Engineer has delivered to Owner the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!