Design Phase. All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase All Basic Services set forth in the Agreement. Construction Phase All Basic Services set forth in the Agreement. Post-Construction All Basic Services set forth in the Agreement.
Design Phase. During its design phase, Specialty Subcontractor shall meet with Construction Manager and Owner Parties as requested to coordinate preparation of the Construction Drawings and Specifications. During those meetings, Specialty Subcontractor shall furnish the Project Design Team with recommendations for: (i) construction feasibility; (ii) Materials and labor availability, including analysis of the types and quantities of labor required for the applicable trade work; (iii) procurement and lead-time, and (iv) other cost-reduction measures, including Value Engineering. Specialty Subcontractor shall work with the Project Development Team to design the relevant portions of the Work, through approval of the Construction Drawings and Specifications, to ensure the cost of such Work shall be at most equal to its awarded bid price. Specialty Subcontractor shall promptly notify the Project Development Team of any material changes to quantities or qualities that affect the cost or schedule included in its bid and shall provide detailed information of such changes for Owner Parties’ and Construction Manager’s review.
Design Phase. For all Design Phase Services, including, but not limited to, providing value engineering services, reviewing Construction Documents for constructability, assisting and meeting with Design Professional during the various design phases, preparing cost estimates and obtaining various project permits, Construction Manager shall receive the fixed amount of $2,000 (two thousand dollars) as the total lump sum compensation for its services. Said lump sum amount shall be paid in accordance with the following schedule: One thousand dollars each for the months of February and M arch, 2003.
Design Phase. A.2.1 All documents including drawings and specifications, any changes, revisions or amplifications thereof, as well as all construction cost estimates, shall be subject to the written approval of the Owner before the documents are accepted. The approval of drawings by the Owner is not to be construed as authority to violate, cancel or set aside any provisions of applicable codes.
Design Phase. In conjunction with the design phase of the Project (and continuing for as long as specified herein), Design/Builder shall carry insurance as prescribed herein. All insurance policies shall be with a company or companies lawfully authorized to do business in Florida, and with an A.M. Best rating of no less than A/XV. All insurance policies shall be issued and countersigned by duly authorized representatives of such companies and shall be written on ISO standard forms or their equivalents.
Design Phase. As part of the Design Phase services, the CM/GC shall do the following:
Design Phase. See “Exhibit A – Scope of Services for DP” for scope for the following subphases of the Design Phase: Program Development, Conceptual Design, Schematic Design, Design Development, GMP-Setting and Construction Documents.
Design Phase. The services to be provided during the Design Phase for the Project include, but are not limited to, providing responsible reporting, documentation, recommendations and supervision of the following services: pre-construction scheduling, review and recommendations during the design development stages from the schematic phase to the completion of working drawings, preparation of conceptual and periodic estimates, budget assessment and cost containment advice, value engineering studies and recommendations, and Construction Manager reviews.
Design Phase. Under this phase, AMISP shall design and plan for the AMI Project within the Schedule A specified in this Contract. Subject to provisions of this Contract, the completion of implementation of the Solution by the AMISP shall be in accordance with the Project Implementation Schedule as specified in Schedule A.
Design Phase. Upon execution of this agreement, ENGINEER shall: