We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.

For more information visit our privacy policy.

Disposal Area Sample Clauses

Disposal AreaThe Contractor shall use the nearest approved solid waste disposal facility for the disposal of surplus construction material from the work. It is required that any asphalt or concrete excavated from this project shall be taken to an approved recycling center.
Disposal Area. Cross-section sounding lines are to be run @ 100 m interval. Continuous soundings are to be taken on the cross-section and plotted @ 20 m apart on the cross-section lines. The Survey shall be done for a minimum area of 1000 m X 1000 m, however shall be extended as per the directives of Engineer. The Scale of survey is 1:5000. Hydrographic Survey for disposal area shall be carried out prior to disposal if the disposal is within river portion or as per the directives of Engineer.
Disposal Area. 07.01 The Contractor shall obtain a disposal area for all unsuitable or surplus materials at no cost to the Town. 07.02 The Contractor and the Engineer shall clarify if the Town wants to salvage any materials demolished at the site. Any such material shall be delivered by the Contractor to a place of storage designated by the Town.

Related to Disposal Area

  • Control Area An electric power system or combination of electric power systems to which a common automatic generation control scheme is applied in order to: (1) match, at all times, the power output of the generators within the electric power system(s) and capacity and energy purchased from entities outside the electric power system(s), with the load within the electric power system(s); (2) maintain scheduled interchange with other Control Areas, within the limits of Good Utility Practice; (3) maintain the frequency of the electric power system(s) within reasonable limits in accordance with Good Utility Practice; and (4) provide sufficient generating capacity to maintain operating reserves in accordance with Good Utility Practice.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Capacity Building 1. Contractor will work in partnership with AOD to study the viability of billing under Drug Medi-Cal and 3rd party payer. 2. Contractor will document and track consumers who are CalWORKS eligible.

  • Disposal The Recipient will not, without the Province’s prior written consent, sell, lease, or otherwise dispose of any asset purchased or created with the Funds or for which Funds were provided, the cost of which exceeded the amount as provided for in Schedule “B” at the time of purchase.

  • As-Builts Seller shall provide final as-built drawings of the Seller-Owned Interconnection Facilities within 30 Days of the successful completion of the Acceptance Test.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • TENANT PARKING Tenant shall rent from Landlord, commencing on the Commencement Date, the amount of parking spaces set forth in Section 9 of the Summary, on a monthly basis throughout the Lease Term, which parking spaces shall pertain to parking on a first-come, first-served, as available basis in the Project parking facility. Tenant shall not use any space to park more than one vehicle at a time. Tenant may surrender spaces on not less than thirty (30) days prior Notice at which time Tenant’s right to re-rent such space shall expire. The location of the reserved parking spaces, if any, shall be designated by Landlord. Tenant shall pay monthly fees for all parking spaces rented by Tenant, on a monthly basis together with Base Rent, at the prevailing rate charged from time to time. In addition, Tenant shall be responsible for any increases in taxes imposed by any governmental authority in connection with the renting of such parking spaces by Tenant or the use of the parking facility by Tenant regardless of whether Landlord charges Tenant for such parking separately or at all. Tenant’s continued right to use the parking spaces is conditioned upon Tenant abiding by all rules and regulations which are prescribed from time to time for the orderly operation and use of the parking facility where the parking spaces are located (including any sticker or other identification system established by Landlord and the prohibition of vehicle repair and maintenance activities in the Project’s parking facilities), Tenant’s cooperation in seeing that Tenant’s employees and visitors also comply with such rules and regulations and Tenant not being in Default under this Lease. Neither Tenant nor its employees shall park automobiles in the Project parking facility overnight. All vehicles parked in the Project parking facility must be properly licensed in accordance with the laws of the State in which the Project is located and in operable condition. No oversized vehicles, commercial vehicles or vehicles which would damage the surface of the Project parking facility, shall be permitted to use the Project parking facility. Tenant’s use of the Project parking facility shall be at Tenant’s sole risk and Tenant acknowledges and agrees that Landlord shall have no liability whatsoever for damage to the vehicles of Tenant, its employees and/or visitors, or for other personal injury or property damage or theft relating to or connected with the parking rights granted herein or any of Tenant’s, its employees’ and/or visitors’ use of the parking facilities. Tenant’s rights hereunder are subject to the terms of any Underlying Documents. Landlord specifically reserves the right to change the size, configuration, design, layout and all other aspects of the Project parking facility at any time and Tenant acknowledges and agrees that Landlord may, without incurring any liability to Tenant and without any abatement of Rent under this Lease, from time to time, close-off or restrict access to the Project parking facility for purposes of permitting or facilitating any such construction, alteration or improvements. Landlord may issue a total number of unreserved spaces for the Project parking facility based on past usage patterns rather than limiting spaces to the number of spaces. Landlord may delegate its responsibilities hereunder to a parking operator in which case such parking operator shall have all the rights of control attributed hereby to the Landlord and, at Landlord’s sole discretion, the monthly fees for parking spaces may be billed by and paid to the parking operator. The parking spaces rented by Tenant pursuant to this Article 28 are provided to Tenant solely for use by Tenant’s own personnel and such spaces may not be transferred, assigned, subleased or otherwise alienated by Tenant without Landlord’s prior approval. Tenant may validate visitor parking by such method or methods as the Landlord may establish, at the validation rate from time to time generally applicable to visitor parking. Landlord may cancel parking spaces which remain unused for ninety (90) days or more.

  • Building Permit The Owner shall pay for all permits. The Owner and AE shall be required to provide such information to the Permitting Authority as is necessary to obtain approval from the Permitting Authority to commence construction prior to beginning construction. The CM shall pull the Building Permit, and shall be responsible for delivering and posting the Building Permit at the Project Site prior to the commencement of construction. The Owner and AE shall fully cooperate with the CM when and where necessary.

  • Disposal of Waste The licensee shall have to make their own arrangements for daily disposal of waste (after segregation of dry and wet waste) out of Maha-Metro premises. The wastes shall be dumped at sites approved by concerned civic agencies to ensure perfect cleanliness. If any kind of waste is found disposed off on Maha-Metro land or premises a penalty/fine of Rs. 5000/- per instance shall be imposed by Maha-Metro for each occasion.