Documents and Submittals at the Site Sample Clauses

Documents and Submittals at the Site. The Design-Builder shall maintain at the site for the Owner one copy of the Design-Build Documents and a current set of the Construction Documents, in good order and marked currently to indicate field changes and selections made during construction, and one copy of approved Submittals. The Design-Builder shall deliver these items to the Owner in accordance with Section 9.10.2 as a record of the Work as constructed.
AutoNDA by SimpleDocs
Documents and Submittals at the Site. The Contractor shall maintain at the site for the Owner electronic copies of the Contract Documents and current set of the Construction Documents, in good order and marked currently to indicate field changes and selections made during construction, and one hard copy of approved Submittals. The Contractor shall deliver these copies of these items to the Owner in accordance with Section 9.10.2 as a record of the Work as constructed.
Documents and Submittals at the Site. Contractor will keep at the Project site for use by Owner, Architect, or their representatives, a record copy of the Project Manual, the Drawings, all Addenda, and all Modifications. These documents will be maintained in good order and currently marked to record changes and selections made during construction. In addition, Contractor will keep at the Project site one copy of all Submittals.
Documents and Submittals at the Site. The Design-Builder shall maintain at the site for the Town one copy of the Design-Build Documents and a current set of the Construction Documents, in good order and marked currently to indicate field changes and selections made during construction, and one copy of approved Submittals. The Design-Builder shall deliver these items to the Town in accordance with Section 9.10.2 as a record of the Work as constructed.
Documents and Submittals at the Site. The Design-Builder shall maintain at the site for the Manager one copy of the Design-Build D set of the Construction Documents, in good order and marked currently to indicate field chan during construction, and one copy of approved Submittals. The Design-Builder shall deliver t Manager in accordance with Section 9.10.2 as a record of the Work as constructed. d responsively in ments and a current and selections made items to the
Documents and Submittals at the Site. The DBC shall maintain at the site for the Owner one copy of the Design-Build Documents and a current set of the Construction Documents, in good order and marked currently to indicate field changes and selections made during construction, and one copy of approved Submittals in high resolution pdf file format. The DBC shall deliver these items to the Owner in accordance with Section 9.10.2 as a record of the Work as constructed at substantial completion.
Documents and Submittals at the Site. § 5.8.1 Design-Builder shall maintain at the Site for the Owner one hard-copy of the Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to record changes (including changes in the field and selections made during construction). At the end of construction, these documents shall be provided to the Architect with a request to complete Record Drawings. The Design-Builder shall further maintain at the Site and available for Owner’s inspection one record hard-copy of approved shop drawings, product data, samples and similar required Submittals. These shall be supplied by the Design-Builder to the Owner upon completion of the be limited improvem changes du Work as a record of the Work as constructed, at a time and place designated by Owner. These documents shall be available to Project Manager and Owner during the progress of the Work. As-Built Documents shall contain, but not to: (i) the actual location of the underground utilities and appurtenances as referenced to permanent surface ents; (ii) the location of internal utilities and appurtenances concealed in building structures; and (iii) ring the construction process. The As-Built Documents are to be kept accurately and no Work shall be permanently concealed until the required information has been recorded. As part of the Project Close-out Documents, and prior to release by Owner of Final Payment, Design-Builder shall submit two (2) sets of accurate and complete As-Built Documents and Record Drawings, in electronic form, to Owner and Project Manager in accordance with Tex. Gov’t. Code § 2269.310, with Design-Builder’s representation that the documents show complete "as-built" conditions of the Work.
AutoNDA by SimpleDocs
Documents and Submittals at the Site. Xxxxxxx shall maintain at the site for the Owner one copy of the Industrial Design-Build Documents and a current set of the Construction Documents, in good order and marked currently to indicate field changes and selections made during construction, and one copy of approved Submittals. Xxxxxxx shall deliver these items to the Owner in accordance with § 11.1.5 as a record of the IDB Work as constructed.

Related to Documents and Submittals at the Site

  • Documents and Materials CONTRACTOR shall maintain and make available to COUNTY for its inspection and use during the term of this Agreement, all Documents and Materials, as defined in Paragraph 9 of this Agreement. CONTRACTOR’s obligations under the preceding sentence shall continue for four

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

Time is Money Join Law Insider Premium to draft better contracts faster.