Documents To Be Submitted Before Turn over of Facility Sample Clauses

Documents To Be Submitted Before Turn over of Facility. Before Project completion, Seller shall update design drawings and other design documents as shown in Section 10.1 to reflect as-built information and provide electronic and hard copies to the Purchaser. Before submittal of these as-built documents, Seller shall provide the Purchaser access to field markup drawings and other documents required to support the Purchaser 's O&M requirements. Isometrics shall be provided from the “as designed” 3D CAD model. Piping composite layout drawings may be provided for the above ground plant facilities. Underground composites shall be provided. Operational documents which shall be as-built, include P&ID’s, loop diagrams, one-lines, equipment lists, and interconnecting wiring drawings. As-built construction drawings for steel detail, pipe supports, rebar drawings, etc. will be provided as requested by Purchaser. All shop-fabricated pipe 2.5 inches or above shall be modeled. Non CAD drawings can be scanned for submittal on CD ROM.
AutoNDA by SimpleDocs

Related to Documents To Be Submitted Before Turn over of Facility

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

  • What Forms of Distribution Are Available from a Xxxxxxxxx Education Savings Account Distributions may be made as a lump sum of the entire account, or distributions of a portion of the account may be made as requested.

  • SUBMISSION OF THE MONTHLY MI REPORT 4.1 The completed MI Report shall be completed electronically and returned to the Authority by uploading the electronic MI Report computer file to MISO in accordance with the instructions provided in MISO.

  • WSIB Top-Up a) Teachers who, as of August 31, 2014, were entitled to Workplace Safety and Insurance Board benefits top-up, such entitlement shall be as follows:

  • Reallocation to a Class with a Lower Salary Range Maximum 1. If the employee meets the skills and abilities requirements of the position and chooses to remain in the reallocated position, the employee retains existing appointment status and has the right to be placed on the Employer’s internal layoff list for the classification occupied prior to the reallocation.

  • JOC - PRICING OF After Hours Coefficient What is your after hours coefficient for the RS Means Price Book for work performed after normal working hours? (FAILURE TO RESPOND PROHIBITS PART 2 JOC EVALUATION) Remember that this is a ceiling price proposed. You can discount to any TIPS Member customer a lower coefficient than your proposed contract coefficient, but not higher. This is one of three pricing questions that are required for consideration for award on this solicitation. Please consider your answer carefully. An explanation of the TIPS scoring of pricing titled "Pricing Coefficient Instruction" is included in the attachments for your information. The below is an EXAMPLE of how the pricing model works (It is not intended to influence your proposed coefficient, you should propose a coefficient that you determine is reasonable for your business for the life of the contract): The most common after hours coefficient is time and a half of the RS Means Unit Price Book prices. To illustrate this coefficient, if your regular hours coefficient is .95, your after hours coefficient would be 1.45.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Withdrawal Before Bidding 7.1. Registered E-Bidders, who have completed the 10% deposit payment, are entitled to withdraw from the auction at least one (1) working day before the auction date by 5.00 pm.

  • Pricing Increase Requests Subsequent to the first twelve (12) months of the Contract term and in accordance with the schedule for price adjustments established by OGS, Contractor may request an increase in the pricing contained in the Centralized Contract by submitting an update request based on change in pricing level as contained in Appendix C, Contract Modification Procedure to the OGS Contract Administrator. With any price increase request, in addition to the requirements contained in Appendix C, the Contractor must certify in writing that the price change for the Services is the same as its pricing in its GSA Supply Schedule, and that Contractor documents the request to the satisfaction of the State.

  • Dollar Limits Per Service Agreement Cost to diagnose, repair and/or replace - Geothermal and water source systems $1,500 Water cooled air conditioners, high velocity and hydronic systems $1,500 Concrete encased or concealed ductwork $500 Refrigerant lines $500 Appliances l Standard/Seller Coverage S Supreme Coverage l S Appliance color matchSM l S Built-in microwave l S Dishwasher l S Garbage disposal l S Range, oven, cooktop and vent hood l S Refrigerator - INCLUDING ICE MAKER! S Washer and dryer S Range, oven, cooktop, hood: handles, hinges, clocks, rotisseries, racks, knobs and dials, interior lining, glass/ceramic cooktops, self cleaning mechanisms and latch assemblies S Kitchen Refrigerator: handles, hinges, ice crusher, beverage dispenser and respective equipment S Built-in microwave: handles, hinges, interior lining, clocks and shelves, turntable platforms and rollers S Dishwasher: handles, hinges, racks, baskets, rollers, tub and interior lining, springs, latch assemblies and soap dispensers S Permits up to $250 per Service Agreement S Modifications up to $250 per Service Agreement S Haul away/disposal fees S Items under manufacturer’s warranty Excluded Items: ✖ Appliances not located in the primary kitchen (except washer and dryer) and duplicate appliances, unless additional refrigerator option(s) are purchased. ✖ Meat probe assemblies, door glass, sensi-heat burners will only be replaced with standard burners for range, oven, cooktop. ✖ Multimedia center including technology convenience items like LCD screens, Wi-Fi and cameras. ✖ Racks, hinges, shelves, interior thermal shells, food spoilage and freezers which are not an integral part of the kitchen refrigerator. ✖ Door glass, portable or counter top units, trim kits, meat probe assemblies, rotisseries for built-in microwave. ✖ Damage to clothing, plastic mini-tub, soap dispensers, filter screens, knobs, dials, hinges and lint screen for washer or dryer. ✖ Gas supply line to stove.

Time is Money Join Law Insider Premium to draft better contracts faster.