DRAWINGS & MANUALS. A. Two sets of Engineering, electrical drawings and Installation and O&M manuals are to be supplied. Bidders shall provide complete technical data sheets for each equipment giving details of the specifications along with make/makes in their bid along with basic design of the power plant and power evacuation, synchronization along with protection equipment.
AutoNDA by SimpleDocs
DRAWINGS & MANUALS i. Two sets of Engineering, electrical drawings and Installation and O&M manuals are to be supplied to beneficiaries. Bidders shall provide complete technical datasheets for each equipment giving details of the specifications along with make/makes in their bid along with basic design of the power plant and power evacuation, synchronization along with protection equipment. Approved ISI and reputed makes for equipment be used.

Related to DRAWINGS & MANUALS

  • Drawings a. Drawings Submitted With Bid When the Bid Specifications require the Bidder to furnish drawings and/or plans, such drawings and/or plans shall conform to the mandates of the Bid

  • MANUALS Each product delivered under contract to any Customer must be delivered with at least one (1) copy of a safety and operating manual and any other technical or maintenance manual. The cost of the manual(s) must be included in the price for the Product offered.

  • Operations Manual The Franchisor agrees to loan to the Franchisee one or more manuals, technical bulletins, cookbooks and recipes and other written materials (collectively referred to as “Operations Manual”) covering Factory Candy ordering, Store Candy manufacturing, processing and stocking and other operating and in-store marketing techniques for the ROCKY MOUNTAIN CHOCOLATE FACTORY Store. The Franchisee agrees that it shall comply with the Operations Manual as an essential aspect of its obligations under this Agreement, that the Operations Manual shall be deemed to be incorporated herein by reference and failure by the Franchisee to substantially comply with the Operations Manual may be considered by the Franchisor to be a breach of this Agreement.

  • Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. The term "Specifications" shall also include all written matter in the Project Manual or on the drawings and any Addenda or Change Orders thereto.

  • Protocols Each party hereby agrees that the inclusion of additional protocols may be required to make this Agreement specific. All such protocols shall be negotiated, determined and agreed upon by both parties hereto.

  • Project Manual A bound manual prepared by the Design Professional. It includes the Invitation to Bid, Instructions to Bidders, the Bid Form, the Specifications, the General Conditions and Supplementary General Conditions.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Provider Manual The Provider Manual shall be a comprehensive online reference tool for the Provider and staff regarding, but not limited to, administrative, prior authorization, and referral processes, claims and encounter submission processes, continuity of care requirements, and plan benefits. The Provider Manual shall also address topics such as clinical practice guidelines, availability and access standards, care management programs and Enrollee rights.

Time is Money Join Law Insider Premium to draft better contracts faster.