Dredge Tolerances Sample Clauses

Dredge Tolerances. The dredge level in the navigation channel shall not exceed an upper tolerance of + 0 mm and a lower tolerance of - 200 mm, where + indicates a height above the design dredge level and - indicates a depth below the design dredge level. No ridges or pinnacles above the design dredge level shall be accepted. Horizontal tolerances for dredging in the navigation channel shall be - 0 mm and + 250 mm on both sides, where - indicates a deviation of the toe of the dredged slope (towards the channel) from the location specified in the contract drawings and + indicates a deviation of the toe of the dredged slope (away from the channel) from the location specified in the contract drawings. The Contractor will not be paid for the extra quantities in depth and slopes flatter than 1:5, beyond tolerances as specified.
Dredge Tolerances. Bottom width of the channel is to be maintained 45.0 m with a 2 m depth of cut, the dredge level in the navigation channel shall not exceed an upper tolerance of + 0 mm and a lower tolerance of - 500 mm, where + indicates a height above the design dredge level and - indicates a depth below the design dredge level. No ridges or pinnacles above the design dredge level shall be accepted. Horizontal tolerances for dredging in the navigation channel shall be - 0 mm and + 1000 mm on both sides, where - indicates a deviation of the toe of the dredged slope (towards the channel) from the location specified in the contract drawings and + indicates a deviation of the toe of the dredged slope (away from the channel) from the location specified in the contract drawings. The Contractor will not be paid for the extra quantities in depth and slopes flatter than 1:5, beyond tolerances as specified.
Dredge Tolerances. The dredge level in the navigation channel shall not exceed the upper tolerance of +0mm and lower tolerance of -200mm, where “+” indicates a height above the design dredge level and “-“ indicates depth below design dredge level. No ridges or pinnacles above design dredge level shall be accepted. Horizontal tolerance for dredging in the navigation channel shall be -0mm and +250mm on both sides. The Contractor will not be paid for the extra quantities in slopes flatter than 1:5, if any. However, payment of tolerances will be made within the limits of tolerances as stipulated in RFP.
Dredge Tolerances. The dredge level in the navigation channel shall not exceed the upper tolerance of +0mm and lower tolerance of -200mm in Access Channel and Port Basin at Sittwe and shall not exceed the upper tolerance of +0mm and lower tolerance of -100 mm in Kaladan River, where “+” indicates a height above the design dredge level and “-“ indicates depth below design dredge level. No ridges or pinnacles above design dredge level shall be accepted. Horizontal tolerance for dredging in the navigation channel shall be -0mm and +2000 mm on both sides in Access Channel and Port Basin at Sittwe and -0mm and +1000 mm on both sides in Kaladan River. The Contractor will not be paid for the extra quantities in slopes flatter than 1:5, if any. However, payment of tolerances will be made within the limits of tolerances as stipulated in RFP.
Dredge Tolerances. The dredge level in the navigation channel shall not exceed an upper tolerance of (+) 0 mm and a lower tolerance of - 200 mm, where (+) indicates a height above the design dredge level and (-) indicates a depth below the design dredge level. No ridges or pinnacles above the design dredge level shall be accepted. Horizontal tolerances for dredging in the navigation channel shall be (-) 0 mm and (+) 1000 mm on both sides, where - indicates a deviation of the toe of the dredged slope (towards the channel) from the location specified in the contract drawings and (+) indicates a deviation of the toe of the dredged slope (away from the channel) from the location specified in the contract drawings. The Contractor will not be paid for the extra quantities in depth and slopes flatter than 1:5, beyond tolerances as specified. However, payment of tolerances will be made within the limits of tolerances as stipulated in RFP.