Electrical Demolition Sample Clauses

Electrical Demolition a. Remove selected sections of raceway, wire, and other associated devices dedicated to the mechanical equipment which is being removed.
AutoNDA by SimpleDocs
Electrical Demolition. Payment under this item shall be for all furnishing of labor, services, tools, equipment, materials, appurtenances and incidentals required for all the construction work required for the demolition of electrical materials, structures, equipment, connections, etc., per the plans. This bid item will be paid as a Lump Sum, based on percentage of contract work completed. • Bid Item No. 4N – SCE Underground Coordination & Installation of Conduits & Manhole (Per Plans): Payment under this item shall be for all furnishing of labor, services, tools, equipment, materials, appurtenances and incidentals required for all the construction work required for the Southern California Edison underground coordination work and the installation of conduits and manhole work, included but not limited to, all wiring, piping, testing, conduits, assembly, framing work, excavation, bedding, electrical ducts, bolts, backfilling, fiberglass materials, rods, clamps, riser bends, poles, cables, crushed rock, grading, tie-in work, PVC couplings, PVC piping, padding, placement of all materials, and all other work and materials necessary to complete the Southern California Edison underground coordination work and the installation of conduits and manhole work, per the plans and SCE plans (Attachment C). This bid item will be paid as a Lump Sum, based on percentage of contract work completed. • Bid Item No. 5A – Storm Drain HDPE (4"-18"): Payment under this item shall be for all furnishing of labor, services, tools, equipment, materials, appurtenances and incidentals required for all the construction work required for the installation of the storm drain pipe, included but not limited to, piping, trench excavation and preparation, bedding, fittings, backfill, compaction and surface/pavement completion, worker protection, and other work and materials required to complete the construction work for installing the storm drain pipe, per the plans. This bid item will be paid for per Linear Foot. • Bid Item No. 5B – 18” X 18” Drop Inlet: Payment under this item shall be for all furnishing of labor, services, tools, equipment, materials, appurtenances and incidentals required for all the construction work required for the installation of the drop inlet, included but not limited to, all excavation, bedding, backfilling, compaction, watering, furnishing and installing the cast-iron grate and lid, grading around the inlet, connecting to piping, and all other work and materials necessary to result in a c...

Related to Electrical Demolition

  • Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.

Time is Money Join Law Insider Premium to draft better contracts faster.