Energy Savings Initiatives Sample Clauses

Energy Savings Initiatives. A separate report has been prepared under the PPTA consultancy on energy savings initiatives for SAWACO. In conjunction with a local energy auditing consultant, MWH has conducted energy audits at locations covering the full range of operations across HCMC’s water supply system. The following sites were included in the audit. • Thu Duc WTP – Raw Water Pumping • Thu Duc WTP – Treated Water Pumping • Thu Duc WTP – Backwash System • Thu Duc WTP – Office, Workshop, Ancillaries • Xxx Xxxx WTP – Raw Water Pumping • Xxx Xxxx WTP – Treated Water Pumping • Xxx Xxxx WTP – Backwash System • Xxx Xxxx WTP – Office, Workshop, Ancillaries • Thu Duc BOO WTP • Xxxx An WTP • Xxxxx An Water Supply Company • Hoc Mon WTP • SAWACO Headquarters Offices • JS Company Office Zone 3 • JS Company Office Zone 5 At each location the key energy using items were noted and energy saving measures were identified and cost estimates prepared. The measures have been sorted into four groups: no cost, payback period up to 3 years, payback period up to 3 to 5 years and payback period greater than 5 years. The capital costs of these groups are shown in Table 3-2. Table 3-2 Costs of Energy Savings Measures Payback Period US$ million VND million No Cost 0 0 Short Term 0 to 3 years 1.5 27 Medium Term 3 to 5 years 0.75 13 Longer Term greater than 5 years. 2.9 52 The most significant short term payback measure is the installation of Variable Frequency Drives (VFDs) for the treated water pumps at WTPs. This has an estimated cost of US$1.3 million (23.7 billion VND) and a payback period of 2.8 years. Another significant item because of the short payback period is the modification of the filter backwash process at the Hoc Mon WTP. This has an estimated cost of US$16,000 (286 million VND) and a payback period of 0.36 years. Other short term pay back measures include installation of VFDs on pumps, of higher efficiency fluorescent lamps, of extra transformers, of more efficient pumps, of capacitor banks, and of more efficient air conditioners. Many of the medium and longer term payback measures are the same as the short term ones mentioned above. Under the Climate Change Adaptation project the consultants will provide support to SAWACO for introduction of these initiatives during project implementation. SAWACO is considering implementing the energy savings program with its own funds.
AutoNDA by SimpleDocs

Related to Energy Savings Initiatives

  • Mentor Teachers A. A Mentor Teacher shall be defined as a Master Teacher as identified in section 1526 of the School Code and shall perform the duties of a Master Teacher as specified in the code.

  • Educator Plans: Directed Growth Plan A) A Directed Growth Plan is for those Educators with PTS whose overall rating is needs improvement.

  • Staffing Plan 8.l The Board and the Association agree that optimum class size is an important aspect of the effective educational program. The Polk County School Staffing Plan shall be constructed each year according to the procedures set forth in Board Policy and, upon adoption, shall become Board Policy.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Financial Services Compensation Scheme We are a participant in the Financial Services Compensation Scheme (the “FSCS”). As a retail client you may be eligible to claim compensation from the FSCS in certain circumstances if we, any approved bank, our nominee company or eligible custodian are in default. Most types of investment business are covered in full for the first £85,000 of any eligible claim. Not every investor is eligible to claim under this scheme: for further information please contact us, or the FSCS directly at xxx.xxxx.xxx.xx.

  • Selection Planning Prior to the issuance to consultants of any requests for proposals, the proposed plan for the selection of consultants under the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Consultant Guidelines. Selection of all consultants’ services shall be undertaken in accordance with such selection plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Provision for Generation Compensation Grid unavailability in a contract year as defined in the PPA: (only period from 8 am to 6 pm to be counted): Generation Loss = [(Average Generation per hour during the Contract Year) × (number of hours of grid unavailability during the Contract Year)] Where, Average Generation per hour during the Contract Year (kWh) = Total generation in the Contract Year (kWh) ÷ Total hours of generation in the Contract Year. The excess generation by the SPD equal to this generation loss shall be procured by the Buying Utility at the PSA tariff so as to offset this loss in the succeeding 3 (three) Contract Years.

  • Business Continuity Planning Supplier shall prepare and maintain at no additional cost to Buyer a Business Continuity Plan (“BCP”). Upon written request of Buyer, Supplier shall provide a copy of Supplier’s BCP. The BCP shall be designed to ensure that Supplier can continue to provide the goods and/or services in accordance with this Order in the event of a disaster or other BCP-triggering event (as such events are defined in the applicable BCP). Supplier’s BCP shall, at a minimum, provide for: (a) the retention and retrieval of data and files; (b) obtaining resources necessary for recovery, (c) appropriate continuity plans to maintain adequate levels of staffing required to provide the goods and services during a disruptive event; (d) procedures to activate an immediate, orderly response to emergency situations; (e) procedures to address potential disruptions to Supplier’s supply chain; (f) a defined escalation process for notification of Buyer, within two (2) business days, in the event of a BCP-triggering event; and (g) training for key Supplier Personnel who are responsible for monitoring and maintaining Supplier’s continuity plans and records. Supplier shall maintain the BCP and test it at least annually or whenever there are material changes in Supplier’s operations, risks or business practices. Upon Xxxxx’s written and reasonable request, Supplier shall provide Buyer an executive summary of test results and a report of corrective actions (including the timing for implementation) to be taken to remedy any deficiencies identified by such testing. Upon Xxxxx’s request and with reasonable advance notice and conducted in such a manner as not to unduly interfere with Supplier’s operations, Supplier shall give Buyer and its designated agents access to Supplier’s designated representative(s) with detailed functional knowledge of Supplier’s BCP and relevant subject matter.

  • Multi-Year Planning The CAPS will be in a form acceptable to the LHIN and may be required to incorporate (1) prudent multi-year financial forecasts; (2) plans for the achievement of performance targets; and (3) realistic risk management strategies. It will be aligned with the LHIN’s then current Integrated Health Service Plan and will reflect local LHIN priorities and initiatives. If the LHIN has provided multi-year planning targets for the HSP, the CAPS will reflect the planning targets.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.