Evaporator Project Sample Clauses

Evaporator Project. A Diaphragm Plant Evaporator was commissioned at the Corporation’s McIntosh, AL facility in 1977 and soon after startup, settlement of soils below the structure began as evidenced by movement, cracking and settling of the structure and equipment. The settlement resulted in significant deformation of foundations and structural members. Several geotechnical studies were conducted by the Corporation and the cause was determined to be dissolution of the soil silica sand below the foundation. The Evaporator Project will provide an extensive, structurally sound foundation support system intended to provide long term stability. The design involves installation of approximately 60 caisson support pilings, placed in three rows, to which additional overhead structural steel and support steel will be attached. These 4 foot diameter concrete caissons will be founded some 175 feet below the surface in a base clay layer not subject to settlement or chemical attack. The existing facilities will then be re-supported from this new foundation system. Replacement concrete curbed containment with an impervious barrier will also be provided. The Evaporator Project has been executed in phases since 2007, with the second phase placed in service in August 2009 and the third phase expected to be placed in service in late 2010 or early 2011. Only the second phase and the third phase are included in the Bond-Financed Facilities. None of the proceeds of the Series 2010 Bonds will be used to reimburse the Corporation for expenditures made with respect to the first phase of the Evaporator Project.
AutoNDA by SimpleDocs

Related to Evaporator Project

  • TENANT PARKING Subject to the terms of this Article 28, Tenant shall have the right to rent from Landlord, commencing on the Rent Commencement Date, the amount of unreserved parking passes set forth in Section 9 of the Summary (of which up to five (5) may be converted to reserved parking passes), on a monthly basis throughout the Lease Term, which parking passes shall pertain to the Property parking facility. Tenant shall pay to Landlord for automobile parking passes on a monthly basis the prevailing rate charged from time to time at the location of such parking passes; provided, however, during the first year of the Lease Term following the Rent Commencement Date only, Tenant shall be entitled to rent the unreserved parking passes at a rate of One Hundred Fifty and 00/100 Dollars ($150.00) per unreserved parking pass per month; and provided, further, that thereafter, the prevailing rate charged by Landlord shall be subject to market rate increases consistent with the parking rates being charged by landlords of Comparable Buildings in the Mid-Market/Civic Center Area. The foregoing parking rates may only be utilized by Tenant, its Permitted Transferee Assignees and any other assignee, sublessee, or transferee of the Tenant’s interest in this Lease. In addition, Tenant shall be responsible for the full amount of any taxes imposed by any governmental authority in connection with the renting of such parking passes by Tenant or the use of the parking facility by Tenant. Tenant may change the number of parking passes rented pursuant to this Article 28 upon thirty (30) days prior written notice to Landlord; provided that notwithstanding any contrary provision of this Lease, if Tenant elects to rent less than all of the unreserved parking passes at any time during the Lease Term, then Tenant’s right to again increase the number of parking passes that it elects to rent under this Lease shall be subject to availability (as determined by Landlord in its reasonable discretion); and provided, further, that in no event shall Tenant be entitled to rent more than the amount and type of parking passes allocated to Tenant as set forth in Section 9 of the Summary during the Lease Term. Tenant’s continued right to use the parking passes is conditioned upon Tenant abiding by all rules and regulations which are reasonably prescribed from time to time for the orderly operation and use of the parking facility where the parking passes are located, including any sticker or other identification system established by Landlord and Tenant’s cooperation in seeing that Tenant’s employees and visitors also comply with such rules and regulations. So long as the same do not unreasonably interfere with Tenant’s parking rights, Landlord specifically reserves the right to change the size, configuration, design, layout and all other aspects of the Property parking facility at any time and Tenant acknowledges and agrees that Landlord may, without incurring any liability to Tenant and without any abatement of Rent under this Lease, from time to time, close-off or restrict access to the Property parking facility for purposes of permitting or facilitating any such construction, alteration or improvements. Landlord may delegate its responsibilities hereunder to a parking operator in which case such parking operator shall have all the rights of control attributed hereby to the Landlord. The parking passes rented by Tenant pursuant to this Article 28 are provided to Tenant solely for use by Tenant’s own personnel and such passes may not be transferred, assigned, subleased or otherwise alienated by Tenant, except in connection with a Transfer of the Premises pursuant to Article 14 of this Lease, without Landlord’s prior approval. Tenant may validate visitor parking by such method or methods as the Landlord may establish, at the validation rate from time to time generally applicable to visitor parking. If Landlord adds a parking valet, Tenant shall have the right to use such valet’s services at the rate established by Landlord for the Building. In addition, if Landlord expands the parking area, Tenant shall have the right to its proportionate share of such additional spaces.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • Project The Land and all improvements thereon, including the Building, the Parking Facilities, and all Common Areas.

  • Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation license to enter the Premises for the purpose of performing such work as said person shall deem reasonably necessary to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord (except in the case of Landlord Parties’ willful misconduct or gross negligence) and without reducing or otherwise affecting Tenant’s obligations under this Lease. Any such work must be conducted in a manner that minimizes disruption and inconvenience to Tenant.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Electrical During the Term of this Lease, there shall be available to the Leased Premises electrical facilities comparable to those supplied in other comparable office buildings in the vicinity of the Building to provide sufficient power for normal lighting and office machines of similar low electrical consumption, and one personal computer for each desk station, but not for any additional computers or extraordinary data processing equipment, special lighting and any other item of electrical equipment which requires a voltage other than one hundred ten (110) volts single phase and is not typically found in an office, as determined by Landlord in its sole, but reasonable discretion; and provided, however, that if the installation of such electrical equipment requires additional air conditioning capacity above that normally provided to tenants of the Building or above standard usage of existing capacity as determined by Landlord in its sole, but reasonable discretion, then the additional air conditioning installation and/or operating costs attributable thereto shall be paid by Tenant. Tenant agrees not to use any apparatus or device in, upon or about the Leased Premises which may in any way increase the amount of such electricity usually furnished or supplied to the Leased Premises, and Tenant further agrees not to connect any apparatus or device to the wires, conduits or pipes or other means by which such electricity is supplied, for the purpose of using additional or unusual amounts of electricity, without the prior written consent of Landlord. At all times, Tenant’s use of electric current shall never exceed Tenant’s share of the capacity of the feeders to the Building or the risers or wiring installation. Tenant shall not install or use or permit the installation or use in the Leased Premises of any computer or electronic data processing or ancillary equipment or any other electrical apparatus designed to operate on electrical current in excess of 110 volts and 5 amps per machine, without the prior written consent of Landlord, which consent shall not be unreasonably withheld, conditioned or delayed. If Tenant shall require electrical current in excess of that usually furnished or supplied for use of the Leased Premises as general office space, Tenant shall first procure the written consent of Landlord (which consent shall not be unreasonably withheld, conditioned or delayed) to the use thereof and Landlord or Tenant may (i) cause a meter to be installed in or for the Leased Premises, or (ii) if Tenant elects not to install said meter, Landlord may reasonably estimate such excess electrical current. The cost of any meters (including, without limitation, the cost of any installation) or surveys to estimate such excess electrical current shall be paid by Tenant. Landlord’s approval of any space plan, floor plan, construction plans, specifications, or other drawings or materials regarding the construction of the Tenant Improvements or any alterations shall not be deemed or construed as consent by Landlord under this paragraph to Tenant’s use of such excess electrical current as provided above. Tenant agrees to pay to Landlord, promptly upon demand therefor, all costs of such excess electrical current consumed as calculated by said meters (at the rates charged for such services to the Building by the municipality or the local public utility) or the excess amount specified in said estimate, as the case may be, plus any additional expense incurred in keeping account of the electrical current so consumed, which additional expense Landlord shall advise Tenant within a reasonable time after request by Tenant.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Electrical Service Subject to the limitation of this Paragraph 4, furnish electrical service to the Premises, including providing and installing all Building standard replacement lighting tubes. If Tenant uses more electrical power than Landlord in good faith considers reasonable or normal for office use, Tenant will pay Landlord on a monthly basis the cost of such excess power consumed by Tenant. Consumption will be determined, at Landlord’s election, either (a) by a survey performed by a reputable consultant selected by Landlord, or (b) through separate meters or submeters installed, maintained and read by Landlord at Tenant’s cost. For purposes of this Paragraph 4 only, “month” and “monthly” shall mean any billing period used by the utility or other power provider supplying electricity. All installations of electrical futures, appliances and equipment within the Premises shall be subject to Landlord’s prior approval, and if they affect the temperature or humidity otherwise maintained, Landlord may, at Tenant’s sole cost and expense (to be paid within (30) days after delivery of written demand supported by invoices or other reasonably satisfactory evidence), install supplemental air conditioning units. Tenant’s use of electricity shall never exceed Tenant’s share of the capacity of existing feeders to the Building or of the risers, wiring installations and transformers serving the floor(s) containing the Premises. Landlord shall provide up to 3.5 xxxxx per usable square foot (demand) of riser and floor panel electrical capacity averaged over the floor being serviced. EXHIBIT C Tenant shall be allocated an approximate 2.0 xxxxx per usable square foot for power and 1.5 xxxxx per usable square foot for lighting. Any risers or wiring necessary to meet Tenant’s excess electrical requirements will be installed by Landlord on Tenant’s request, at Tenant’s sole cost and expense (to be paid in advance), but only if in Landlord’s reasonable good faith belief they are necessary and will not cause damage to the Building or a dangerous condition, entail excessive or unreasonable alterations, repairs or expense, or disturb other occupants.

Time is Money Join Law Insider Premium to draft better contracts faster.