Fire Fighting Pipe Work Sample Clauses

Fire Fighting Pipe Work. Fire fighting pipe work shall be executed in accordance with the requirements of the standard, in consideration of the following: - All above and below ground fire fighting pipe work shall be of a material that has been proven to be suitable for purpose and this material shall be approved by the Engineer prior to execution (plastic piping is not acceptable for above ground). All above ground pipe work shall be painted red. All pipe work supports shall be compatible with piping material and welding of pipe work to support steel supports shall not be permitted. - All above ground deluge fire fighting piping and fittings (both upstream and downstream of the deluge valve) shall be galvanised steel to a recognised international standard. In line strainers shall be installed to protect spray nozzles. All valves shall be marked for flow direction, open / shut direction and function. All valves shall be fully accessible for operation and maintenance. Outside valves shall have weatherproof covers. - The use of grooved pipe fittings is only acceptable outside of the fire risk they are protecting. - All pipe work systems shall be pressure tested prior to back filling in accordance with NFPA or equivalent. All pipe work shall be flushed thoroughly from source to discharge before entering service. In addition, full flow commissioning tests shall be performed on each zone of the deluge fire fighting system. - All buried pipe work shall be installed with thrust blocks as required by NFPA.
AutoNDA by SimpleDocs

Related to Fire Fighting Pipe Work

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Utility Infrastructure During the term of this Agreement, Company will have the right to receive water, sanitary sewer, electric, storm drainage, telecommunication and data services at the Premises.

  • Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.