Fixed Limit Construction Cost Sample Clauses

Fixed Limit Construction Cost. The maximum allowable Construction Cost established by the Awarding Authority as set forth in Attachment GDesign Phase Scope of Services.
AutoNDA by SimpleDocs
Fixed Limit Construction Cost. The maximum Construction Cost established by MassDevelopment as set forth in the Scope of Services.
Fixed Limit Construction Cost. The Designer shall determine the materials, equipment, component systems and types of construction included in the design of the Project so that it may be awarded within the Fixed Limit Construction Cost without alternates (unless Approved by MassDevelopment) and without allowances of any nature. Such determination shall be subject to the Approval of MassDevelopment which shall not be unreasonably withheld. If MassDevelopment has appointed a construction manager or an independent cost estimator for the Project, the Designer shall validate its Construction Cost Estimates with such person. Construction Cost Estimates shall be subject to the Approval of MassDevelopment. The decision of MassDevelopment shall be final in matters pertaining to this section but the Designer shall not be responsible for any decision by MassDevelopment that is inconsistent with generally accepted standards of professional practice provided that the Designer shall have MassDevelopment in writing of the inconsistency at the time of the Approval. If within three (3) months after approval of construction documents, in final form, the bids of the lowest responsible and eligible bidders exceed the Fixed Limit Construction Cost, the Designer shall, if so instructed in writing by MassDevelopment, provide such revised construction drawings and specifications and Construction Cost Estimates as MassDevelopment shall require for the purpose of bringing the cost within the Fixed Limit Construction Cost; provided that Designer may in connection with such revision make reasonable adjustments in the scope of the project subject to the written approval of MassDevelopment, which approval shall not be unreasonably withheld. The Designer shall not be paid additional compensation for such services.
Fixed Limit Construction Cost. The Project’s Fixed Limit Construction Cost is: $ .

Related to Fixed Limit Construction Cost

  • DIRECT CONSTRUCTION COST Direct Construction Cost means the sum of the amounts that Contractor actually and necessarily incurs constructing the Project in strict compliance with the Construction Documents. Direct Construction Cost includes only the cost categories set forth in this Article and does not include the Pre-Construction Phase Fees or the Construction Phase Fees unless specifically noted. References in the UGSC to adjustments in “cost” or “costs” mean the Direct Construction Cost.

  • Construction Cost 3.1. Construction Cost does not include the fees of the ARCHITECT/ENGINEER and consultants, the cost of the land, rights- of-way, or other costs, which is the responsibility of the State as provided in Paragraphs 2.2 through 2.3. or any of the contingencies available for the project unless specifically stated otherwise.

  • Post-Construction Phase A. Upon written authorization from Owner during the Post-Construction Phase, Engineer shall:

  • PRE-CONSTRUCTION PHASE FEE The Pre-Construction Phase Fee is the total compensation payable to Contractor for the performance of Pre-Construction Phase Services, except for Additional Pre-Construction Phase Services approved in advance and in writing by Owner. The Pre-Construction Phase Fee shall be a lump sum amount based on the AACC established in this Agreement.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Pre-Construction Phase Employer’s Liability, Workers’ Compensation, Comprehensive General Liability and Comprehensive Automobile Liability in the amounts as set forth in the UGSC.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Construction Costs Under no circumstances shall the Consultant be liable for extra costs or other consequences due to unknown conditions or related to the failure of contractors to perform work in accordance with the plans and specifications. Consultant shall have no liability whatsoever for any costs arising out of the Client’s decision to obtain bids or proceed with construction before the Consultant has issued final, fully-approved plans and specifications. The Client acknowledges that all preliminary plans are subject to substantial revision until plans are fully approved and all permits obtained.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.