Fuel Cycle Sample Clauses

Fuel Cycle. The fuel cycle includes the electricity production with the supply of the fuel to power plants, the electricity distribution network and the charging station. The main issue to be addressed is the choice of the electricity generation technology and mixes, e.g. analyzing the time dependent electricity generation mix of a country: choice of the annual average electricity production or mix, or the additionally (marginal) produced electricity for meeting the electric vehicles load. In cases where significant amounts of electricity are stored, e.g. in hydro power pumping plants, the electricity mix of consumption might be more relevant for LCA than the production mix. If fluctuating renewable electricity from wind or solar power is used, the key question is whether the renewable electricity ends up in the battery of the electric vehicle or if other effects are initiated in the grid. In the best case, the production of the renewable electricity needs to be harmonised with the charging of the electric vehicle. In most of the cases, the use of only (fluctuating) renewable electricity or in some specific cases electricity from variable hydro power (not pumped storage) must be combined with an adequate electricity storage system (including storage losses). Otherwise, a realistic share of (fluctuating) renewable electricity from wind and solar along with thermal power generation from biomass or fossil fuels must be considered. Furthermore, it must be ensured that the renewable electricity for the EVs is additional to what would have been produced without the electric vehicles load, as shifting the use of the currently generated renewable electricity from a stationary application to the mobile application (i.e., for EV recharging) brings no additional environmental effects. 2016 IA-HEV ANNUAL REPORT Summarizing, it has to be born in mind that the consideration of renewable electricity for the charging of electric vehicles is justified only if this renewable energy is specifically and additionally generated for this purpose. The four main options of connecting renewable electricity with the loading of the electric vehicles are the following (Figure 3):
AutoNDA by SimpleDocs

Related to Fuel Cycle

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Contract Year A twelve (12) month period during the term of the Agreement commencing on the Effective Date and each anniversary thereof.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Extra Trips A. Field trips (extra trips) shall be provided by rotation on a list composed of regular drivers who volunteer in descending order of classification seniority (defined in Article 39).

  • INTERIM MAINTENANCE PERIOD During the interim maintenance period between obtaining of the completion certificate of Project and formation and operationalization of the Association the Promoter shall through itself or through a facility management company constitute a committee to run, operate, manage and maintain the Common Areas.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Work Week and Work Day (a) (Applicable to full-time employees only) The normal or standard work week shall be an average of thirty-seven and one-half (37½) hours, with a normal or standard work day of seven and one-half (7½) hours except in those Hospitals where agreements already provide a standard or normal work week of less than thirty-seven and one-half (37½) hours per week and seven and one-half (7½) hours per day. (Those Hospitals with the lesser required hours shall reflect in the salary rates a pro-rata lesser amount compared with salaries for other Hospitals based on the ratio that the standard or normal hours of work at the Hospital concerned are to thirty-seven and one-half (37½) hours and shall appropriately reflect such hours in this Article). The length of time over which the hours of work per week are to be averaged shall be determined locally and shall be set out in the Local Provisions Appendix.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Local Switching Interfaces 4.2.13.1 Newcomm shall order ports and associated interfaces compatible with the services it wishes to provide as listed in Exhibit A. BellSouth shall provide the following local switching interfaces:

Time is Money Join Law Insider Premium to draft better contracts faster.