Functional Acceptance Testing Sample Clauses

Functional Acceptance Testing. Once the system has been reconfigured, functional testing will be performed per the enclosed Functional Testing Plan (FTP) document. The FTP is submitted with this work plan to show general procedures and equipment needed to conduct verification of features and functions. Final FTP procedures will be approved by XXXXXX and the City. At this stage, functional acceptance tests will be conducted for customer comparative assessment. Measurement results will be provided to the City for information only. No coverage guarantees are offered with this recommendation. If performance is less than acceptable to the City, XXXXXX will provide recommendations for corrections. The cost of any corrective action resulting from the reconfiguration must be negotiated by the City with Sprint-Nextel. If the radio users experience reduction or degradation of radio coverage after system reconfiguration, XXXXXX will prepare, at City/Sprint-Nextel expense, a proposal to return the coverage to the pre-reconfiguration levels as shown by the pre-rebanding coverage testing, to the extent practical.
AutoNDA by SimpleDocs
Functional Acceptance Testing. Functional acceptance testing is the process of conducting a series of tests to ensure proper radio system functional performance. The tests verify that the network is configured, communicating and operating correctly. MCP will review the functional acceptance test plan as provided by the radio system vendor and verify that the test procedure is comprehensive and adequately verifies proper system performance. MCP will oversee the completion of the testing to verify all tests are performed correctly and documented accurately. The tests replicate the testing performed in the factory and add the end-to-end testing of the system connectivity and connectivity network under field and operational conditions.

Related to Functional Acceptance Testing

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.