Garbage Containment Sample Clauses

Garbage Containment. To design, prior to construction, a waste management system for the collection, storage and disposal of waste and recyclable materials, to implement such system and to maintain same and to provide internal recycling and garbage areas sufficient to contain the required number of containers and/or materials. Any bulk garbage containment areas on the Land shall be constructed of materials consistent with the main building, or otherwise approved by the Municipality in accordance with Schedule ‘B’ of this Agreement, and be able to accommodate recyclable materials to the satisfaction of the Municipality. Recyclable materials include, but are not limited to, container metals and glass, 2L soft drink bottles, newsprint, fine paper, wooden skids, corrugated cardboard, and any other materials not mentioned but capable of being recycled. Without limiting the generality of the foregoing, no garbage receptacles, other than small (less than 1.0 cubic metres in volume) waste and recycling receptacles, which are properly emptied and maintained to the Municipality’s satisfaction, are to be located on the Land beyond such garbage containment areas. In the event that the Owner shall be in default of this provision, the Owner hereby constitutes the Municipality as the Owner’s agent for removal of such receptacles. The Municipality, however, shall not be obliged to provide prior notice to the Owner of removal of any such receptacle located on the Land in breach of this provision. The Owner shall indemnify the Municipality with respect to the removal of such receptacles. The Municipality shall be entitled to charge an administration fee with respect to such removal, such fee to be determined by the Municipality’s Director of Public works acting reasonably. The Owner agrees not to permit any refuse, junk, debris or other material to be deposited on the Land, any land, school land, or park-land in the area, and that any such refuse, junk, debris, or other material will be removed from the land at the expense of the Owner. If the Owner fails to remove the aforesaid material within a period of forty-eight (48) hours from the time of delivery of written notice to the Owner, the Municipality may enter on the land and remove the said material and the Owner will be charged for all expenses incurred by the Municipality and the Owner further agrees that the Municipality may make such charge against the security filed with the Municipality.
AutoNDA by SimpleDocs
Garbage Containment. The Owner agrees that any refuse, junk, debris or other material will be deposited in specified areas as outlined on the site plan.

Related to Garbage Containment

  • Garbage The Concessionaire will contract with and make payment directly to the provider.

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Rubbish Please note that the blue top bin is for recycling and all other rubbish should be placed in black bin liners in the other bin for collection. Bins should be put out on Sunday evenings for an early Monday morning collection. Any bin that has not been put out will be the responsibility of the Guest to dispose of the rubbish. The Council will not collect any loose rubbish that is not inside a black bin liner. See above note re dog mess and nappies.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Noise The Hirer shall ensure that the minimum of noise is made on arrival and departure, particularly late at night and early in the morning. The Hirer shall, if using sound amplification equipment, make use of any noise limitation device provided at the premises and comply with any other licensing condition for the premises.

  • Landscaping 3.9.1 All plant material shall conform to the Canadian Nursery Landscape Association’s Canadian Nursery Stock Standard (ninth edition or newer). 3.9.2 There shall be an opaque wood fence or masonry wall at least 1.8 metres tall along the eastern property line extending the length of the surface parking area and access to the underground parking area as generally shown on Schedule B. 3.9.3 Prior to the issuance of a Development Permit, the Developer agrees to provide Landscape Plan that comply with the provisions of this section. The Landscape Plan shall be prepared by a Landscape Architect (a full member, in good standing with Canadian Society of Landscape Architects) and comply with all provisions of this section. 3.9.4 Prior to issuance of the first Occupancy Permit the Developer shall submit to the Development Officer a letter prepared by a member in good standing of the Canadian Society of Landscape Architects certifying that all landscaping has been completed according to the terms of this Development Agreement. 3.9.5 Notwithstanding Section 3.9.4, where the weather and time of year do not allow the completion of the outstanding landscape works prior to the issuance of the Occupancy Permit, the Developer may supply a security deposit in the amount of 110 percent of the estimated cost to complete the landscaping. The cost estimate is to be prepared by a member in good standing of the Canadian Society of Landscape Architects. The security shall be in favour of the Municipality and shall be in the form of a certified cheque or automatically renewing, irrevocable letter of credit issued by a chartered bank. The security shall be returned to the Developer only upon completion of the work as described herein and illustrated on the Schedules, and as approved by the Development Officer. Should the Developer not complete the landscaping within twelve months of issuance of the Occupancy Permit, the Municipality may use the deposit to complete the landscaping as set out in this section of the Agreement. The Developer shall be responsible for all costs in this regard exceeding the deposit. The security deposit or unused portion of the security deposit shall be returned to the Developer upon completion of the work and its certification. 3.9.6 All landscape areas designed to be installed upon any portion of the building must be supported by documentation from a Structural Engineer indicating that the building design is able to support any required drainage or additional weight caused by the landscaped area.

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • Waste Borrower shall not commit or suffer any waste of the Property or make any change in the use of the Property which will in any way materially increase the risk of fire or other hazard arising out of the operation of the Property, or take any action that might invalidate or give cause for cancellation of any Policy, or do or permit to be done thereon anything that may in any way impair the value of the Property or the security of this Security Instrument. Borrower will not, without the prior written consent of Lender, permit any drilling or exploration for or extraction, removal, or production of any minerals from the surface or the subsurface of the Land, regardless of the depth thereof or the method of mining or extraction thereof.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!