Grading; Erosion Control Plan Sample Clauses

Grading; Erosion Control Plan. At the time of application for building permit, Redeveloper will submit, subject to the review and approval of the City Engineer, a final Grading Plan and a final Erosion Control Plan. Any approved final plans shall be incorporated into and be part of the Construction Plans. The Redevelopment Property shall be finally graded in accordance with the approved Construction Plans. Prior to commencement of grading operations, the erosion control plan portion of the Construction Plans shall be implemented by Redeveloper subject to the inspection and approval of the City. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion control plan portion of the Construction Plans, seed shall be certified oat seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention, or the Redeveloper shall use hydro seed to control seed retention. The parties recognize that time is of the essence in controlling erosion. If Redeveloper does not comply with the erosion control plan portion of the Construction Plans or supplementary instructions received from the City and such non-compliance continues for a period of forty-eight (48) hours following written notice from the City, the City may take such action as it deems appropriate to control erosion. No site development will be allowed unless the Redevelopment Property is in full compliance with the erosion control requirements.
AutoNDA by SimpleDocs

Related to Grading; Erosion Control Plan

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer. b. The kinds and frequency of erosion control structures shall be adjusted to soil types, topography and climatic conditions as directed by the Forest Officer. c. The Purchaser is required to recontour any excavated skid trails, and provide for effective erosion control in the trail location as directed by the Forest Officer. d. Erosion control work shall commence as soon as skidding is completed on each skid trail or landing, and must be kept current with unit operations. e. Erosion control work shall be completed and approved by the Forest Officer in unfinished units before operations cease for inactive periods including heavy winter snowfall, spring breakup and restricted dates. f. All erosion control work in each unit shall be completed prior to notification pursuant to Section VII.M.7.

  • Quality Control Program Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. Engineer shall submit a plan detailing its program to the Inspection Branch of the TxDOT Bridge Division for review and approval prior to beginning work. State may review or audit the programs.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Substance Abuse Program The SFMTA General Manager or designee will manage all aspects of the FTA-mandated Substance Abuse Program. He/she shall have appointing and removal authority over all personnel working for the Substance Abuse Program personnel, and shall be responsible for the supervision of the SAP.

  • EPP session-­‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a session command plus the reception of the EPP response for only one EPP session command. For the login command it will include packets needed for starting the TCP session. For the logout command it will include packets needed for closing the TCP session. EPP session commands are those described in section 2.9.1 of EPP RFC 5730. If the RTT is 5 times or more the corresponding SLR, the RTT will be considered undefined.

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic County PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than twenty-four (24) hours.

  • Staffing Plan The Board and the Association agree that optimum class size is an important aspect of the effective educational program. The Polk County School Staffing Plan shall be constructed each year according to the procedures set forth in Board Policy and, upon adoption, shall become Board Policy.

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.