Grant of Easement for Transmission Facilities Sample Clauses

Grant of Easement for Transmission Facilities. Grantor hereby grants and conveys to Grantee an exclusive easement (the “Transmission Easement”) on, in, along, over, across and under the Property, in the locations as generally depicted on the attached Exhibit B, which exhibit by this reference is incorporated herein (the “Proposed Transmission Easement Area”), for the sole purposes of surveying, erecting, designing, developing, siting, installing, constructing, replacing, relocating, improving, enlarging (for the purpose of increasing circuits or voltage), removing, inspecting, maintaining, operating, repairing, using, and allowing the line swings, from time to time, the following: (a) one or more overhead or underground electrical transmission and communications lines and related cables, wires, guy wires, cross arms, conduit, footings, foundations, towers, poles, cross-arms, guy lines and anchors, circuit breakers and transformers, interconnection, distribution and/or switching facilities, including for purposes of line swings from any such lines, whether constructed on the Property or adjacent Property; (b) any and all necessary and proper facilities, fixtures, and additional equipment and improvements in any way related to or associated with any of the foregoing for the transmission of wind-generated electrical energy; and (d) access roads (collectively, “Transmission Facilities”); provided, however, that such Transmission Facilities shall not include substations. Grantee shall conform to good utility practices in siting the Transmission Easement and in constructing all footings and lines, and shall consult with Grantor on the proposed location of the Transmission Easement before making Xxxxxxx’s final siting decisions; provided, however, that Grantor acknowledges and agrees that Grantee shall otherwise have sole discretion over final siting decisions with respect to the Transmission Easement so long as such Transmission Easement shall lie within the Proposed Transmission Easement Area as depicted in Exhibit B hereto. Promptly following detailed siting and construction of the Transmission Facilities by Grantee, Grantee shall both: (a) provide to Grantor a survey meeting the ALTA/NSPS requirements and containing both a legal description and graphic depiction of the as-built location of the area in which the Transmission Easement is located (the “Transmission Easement Area”), as well as additional easement areas adjacent thereto needed for construction and maintenance purposes (the “Construction and Ma...
AutoNDA by SimpleDocs

Related to Grant of Easement for Transmission Facilities

  • Grant of Easement Subject to clauses 2 to 4 inclusive of this Part, the Water Authority will grant to the Joint Venturers an easement over the Water Authority Land in accordance with clause 5 of this Part.

  • Grant of Easements Provided no Event of Default has occurred and is continuing, Landlord will join in granting and, if necessary, modifying or abandoning such rights-of-way, easements and other interests as may be reasonably requested by Tenant for ingress and egress, and electric, telephone, gas, water, sewer and other utilities so long as:

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner [shall/shall not] transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.

  • Access Easement The Owner shall grant to VBWD the necessary easements and rights-of-way and/or maintain perpetual access from public rights-of-way to the Facility for VBWD, its agent, or contractor.

  • Connecting Transmission Owner’s Attachment Facilities Connecting Transmission Owner shall design, procure, construct, install, own and/or control the Connecting Transmission Owner’s Attachment Facilities described in Appendix A hereto, at the sole expense of the Developer.

  • NYISO and Connecting Transmission Owner Obligations Connecting Transmission Owner and NYISO shall cause the New York State Transmission System and the Connecting Transmission Owner’s Attachment Facilities to be operated, maintained and controlled in a safe and reliable manner in accordance with this Agreement and the NYISO Tariffs. Connecting Transmission Owner and NYISO may provide operating instructions to Developer consistent with this Agreement, NYISO procedures and Connecting Transmission Owner’s operating protocols and procedures as they may change from time to time. Connecting Transmission Owner and NYISO will consider changes to their respective operating protocols and procedures proposed by Developer.

  • Connecting Transmission Owner Obligations Connecting Transmission Owner shall maintain its transmission facilities and Attachment Facilities in a safe and reliable manner and in accordance with this Agreement.

  • Developer and Connecting Transmission Owner Notice Developer and Connecting Transmission Owner shall each notify the other Party, first orally and then in writing, of the release of any Hazardous Substances, any asbestos or lead abatement activities, or any type of remediation activities related to the Large Generating Facility or the Attachment Facilities, each of which may reasonably be expected to affect the other Party. The notifying Party shall: (i) provide the notice as soon as practicable, provided such Party makes a good faith effort to provide the notice no later than twenty-four hours after such Party becomes aware of the occurrence; and (ii) promptly furnish to the other Party copies of any publicly available reports filed with any Governmental Authorities addressing such events.

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the Xxxxxxxxx Solar Collector Substation.

  • Utility Easements 2.1 Some properties may at the discretion of the Developer be subject to easements in favour of suppliers of water, power, gas, telephone, internet and wastewater utilities and services, including SaskPower for location of a transformer and SaskTel. The Property Owner acknowledges that the location of any transformer and which lots will be affected by any such easements, will not be known until such utility and service providers complete their design work and the Developer has negotiated the terms and conditions thereof. The Property Owner further specifically acknowledges and agrees that the Property may be subject to any such easement, and that the same shall not affect or result in a decrease or abatement of the purchase price of the Property.