Handling and Storing Test Panels Sample Clauses

Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 57M - 000 00-000 - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 67 - - 000 00-000 - 20-55 0-10 0-5 - - - A Asphalt Plant Mix, AST, Structural Concrete 78M - - - 100 98-100 75-100 20-45 0-15 - - - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 14M - - - - 100 98-100 35-70 5-20 - 0-8 - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - 000 00-00 - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - 000 00- 000 - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST C203870 I-5809 XxXxxxxx County with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-39, Article 1016-3, CLASSIFICATIONS , lines 27-32, replace with the following: (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and (C) Not more than 20% of the rock is less than 2” in diameter. No rippable rock will be permitted. Page 10-40, Tables 1018-1 and 1018-2, PIEDMONT, WESTERN AND COASTAL AREA CRITERIA FOR ACCEPTANCE OF BORROW MATERIAL, under second column in both tables, replace second row with the following: CONCRETE, replace with the following: Page 10-47, Subarticle 1024-3(B), Approved Sources, lines 16-18, replace the second sentence of the second paragraph with the following: Page 10-115, Subarticle 1074-7(B), Gray Iron Castings, lines 10-11, replace the first two sentences with the following: TABLE 1078-1 REQUIREMENTS FOR CONCRETE Page 10-126, Table 1078-1, REQUIREMENTS FOR CONCRETE, replace with the following: Property 28 Day Design Compressive Strength 6,000 psi or less 28 Day Design Compressive Strength greater than 6,000 psi Page 10-151, Article 1080-4, INSPECTION AND SAMPLING, lines 18-22, replace (B), (C)
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. 4 100 90- 000 00- 00 0-00 - 0-5 - - - - - A Asphalt Plant Mix 467M 000 00- 000 - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 5 - 100 90- 000 00- 00 0-00 0-5 - - - - - A AST, Sediment Control Stone 57M - 000 00- 000 - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- 000 00- 00 0-00 0-8 - - - - A AST 78M - - - 100 98- 100 75- 000 00- 00 0-00 - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 14M - - - - - 000 00- 00 0-00 - 0-8 - A Asphalt Plant Mix, AST, Weep Hole Drains, 9 - - - - - 100 85- 000 00- 00 - 0-10 - A AST ABC - 000 00- 00 - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - 000 00- 000 - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization Light-C - - - - 100 80- 100 5- 40 0-20 - 0-10 - 0-2.5 AST 14.01. 10441.1, etc R-13 Xxxxxxx, Xxxxxxx and Xxxxx Counties with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). Page 10-39, Article 1016-3, CLASSIFICATIONS , lines 27-32, replace with the following: (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Fly ash may be substituted for cement in the mix design up to 30% at a rate of 1.0 lb of fly ash to each pound of cement replaced. Use Table 1000-1 to determine the maximum allowable water- cementitious material (cement + fly ash) ratio for the classes of concrete listed. the table. 4 100 90- 000 00- 00 0-00 - 0-5 - - - - - A Asphalt Plant Mix 467M 000 00- 000 - 35- 70 - 0-30 0-5 - - - - A Asphalt Plant Mix 5 - 100 90- 000 00- 00 0-00 0-5 - - - - - A AST, Sediment Control Stone 57M - 000 00- 000 - 25- 45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90- 000 00- 00 0-00 0-8 - - - - A AST 67 - - 000 00- 000 - 20- 55 0-10 0-5 - - - A AST, Str. Concrete, Asphalt Plant Mix 78M - - - 100 98- 100 75- 000 00- 00 0-00 - - - A Asphalt Plant Mix, AST, Str. Conc, Weep Hole Drains 9 - - - - - 100 85- 000 00- 00 - 0-10 - A AST ABC - 000 00- 00 - 55- 80 - 35- 55 - 25- 45 - 14- 30 4- 12B Aggregate Base Course, Aggregate Stabilization ABC (M) - 000 00- 000 - 45- 79 - 20- 40 - 0- 25 - - 0- 12B Maintenance Stabilization 65
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 4 100 90-100 20-55 0-15 - 0-5 - - - - - A Asphalt Plant Mix 57M - 000 00-000 - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90-100 20-55 0-20 0-8 - - - - A AST 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - 000 00-00 - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - 000 00- 000 - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST C204026 I-5956 Guilford & Alamance Counties with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. with the following: Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 4 100 90-100 20-55 0-15 - 0-5 - - - - - A Asphalt Plant Mix 467M 000 00-000 - 35-70 - 0-30 0-5 - - - - A Asphalt Plant Mix 6M - - 100 90-100 20-55 0-20 0-8 - - - - A AST 67 - - 000 00-000 - 20-55 0-10 0-5 - - - A Asphalt Plant Mix, AST, Structural Concrete 78M - - - 100 98-100 75-100 20-45 0-15 - - - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 14M - - - - 100 98-100 35-70 5-20 - 0-8 - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains ABC - 000 00-00 - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST C203945 B-4964 Rockingham County A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 4 100 90-100 20-55 0-15 - 0-5 - - - - - A Asphalt Plant Mix 57M - 000 00-000 - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90-100 20-55 0-20 0-8 - - - - A AST 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - 000 00-00 - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - 000 00- 000 - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization C204089 2018CPT.13.01.10111, etc. Buncombe County with the following:
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 57M - 000 00-000 - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 67 - - 000 00-000 - 20-55 0-10 0-5 - - - A Asphalt Plant Mix, AST, Structural Concrete 78M - - - 100 98-100 75-100 20-45 0-15 - - - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 14M - - - - 100 98-100 35-70 5-20 - 0-8 - A Asphalt Plant Mix, AST, Structural Concrete, Weep Hole Drains 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - 000 00-00 - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - 000 00- 000 - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Shoulder Drain, AST, Weep Hole Drains,
Handling and Storing Test Panels. Notify the Area Materials Engineer when preconstruction or production test panels are made within 24 hours of shooting the panels. Field cure and protect test panels from damage in accordance with ASTM C1140 until the Department transports panels to the Materials and Tests Regional Laboratory for coring. Std. Size # 2" 1 1/2" 1" 3/4" 1/2" 3/8" #4 #8 #10 #16 #40 #200 Remarks 4 100 90-100 20-55 0-15 - 0-5 - - - - - A Asphalt Plant Mix 57M - 000 00-000 - 25-45 - 0-10 0-5 - - - A AST, Concrete Pavement 6M - - 100 90-100 20-55 0-20 0-8 - - - - A AST 9M - - - - 100 98-100 85-100 10-40 - 0-10 - A AST ABC - 000 00-00 - 55-80 - 35-55 - 25-45 - 14-30 4-12B Aggregate Base Course, Aggregate Stabilization ABC(M) - 000 00- 000 - 45-79 - 20-40 - 0- 25 - - 0-12B Maintenance Stabilization Light- weightC - - - - 100 80-100 5- 40 0-20 - 0-10 - 0-2.5 AST C204031 2018CPT.14.01.10751.1, etc. R-19 Polk, Xxxxxxxxx & Transylvania Counties with the following: A. See Subarticle 1005-4(A). B. See Subarticle 1005-4(B). C. For Lightweight Aggregate used in Structural Concrete, see Subarticle 1014-2(E)(6). (A) At least 50% of the rock has a diameter of from 1.5 ft to 3 ft, (B) 30% of the rock ranges in size from 2” to 1.5 ft in diameter, and (C) Not more than 20% of the rock is less than 2” in diameter. No rippable rock will be permitted. Page 10-40, Tables 1018-1 and 1018-2, PIEDMONT, WESTERN AND COASTAL AREA CRITERIA FOR ACCEPTANCE OF BORROW MATERIAL, under second column in both tables, replace second row with the following: CONCRETE, replace with the following: Page 10-47, Subarticle 1024-3(B), Approved Sources, lines 16-18, replace the second sentence of the second paragraph with the following: Page 10-115, Subarticle 1074-7(B), Gray Iron Castings, lines 10-11, replace the first two sentences with the following: TABLE 1078-1 REQUIREMENTS FOR CONCRETE Page 10-126, Table 1078-1, REQUIREMENTS FOR CONCRETE, replace with the following: Property 28 Day Design Compressive Strength 6,000 psi or less 28 Day Design Compressive Strength greater than 6,000 psi Page 10-151, Article 1080-4, INSPECTION AND SAMPLING, lines 18-22, replace (B), (C)

Related to Handling and Storing Test Panels

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If ECI chooses to subtend a Verizon access Tandem, ECI’s NPA/NXX must be assigned by ECI to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 ECI shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from ECI’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office ECI utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow ECI’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.