Horizontal alignment Sample Clauses

Horizontal alignment. The horizontal alignment of the road should be consistent with the topography of the terrain through which it passes. Minimum curve radii should be applied only when necessary and should be used in conjunction with transition curves. Compound curves should be avoided whenever possible. The minimum radii of horizontal curves are shown in table 5 for each highway class.
AutoNDA by SimpleDocs
Horizontal alignment. In so far as possible, the use of the minimum radius values should be avoided; under normal circumstances it is preferable for the minimum values to be approximately 50 to 100% greater than those indicated. Moreover, transition curves to connect the different radii should be used.
Horizontal alignment. 25 Mainline horizontal alignment must comply with the requirements in Section 203 of the ADOT 00 Xxxxxxx Xxxxxx Xxxxxxxxxx. Xxxxxxx design must not include spiral curves.
Horizontal alignment. No Change Allowed
Horizontal alignment. (i) Subject to the other requirements of this Agreement the horizontal road geometry Design shall comply with the relevant design speed as described in Table 1 of Appendix D.
Horizontal alignment. The Consultant is aware of the County’s desire to avoid impacting the property located south of Xxxx 000xx Xxxxxx. This property was identified as having an undocumented landfill. The horizontal alignment will be developed to maintain all grading within the southerly right-of-way of Xxxx 000xx Xxxxxx.
Horizontal alignment. ALIGN SPANDREL BEAMS SO THAT THE OFFSET OF ONE END RELATIVE TO THE OTHER FROM THE ALIGNMENT SHOWN ON THE DRAWINGS DOES NOT EXCEED L/500. OFFSETS FOR SPANDREL BEAMS SHALL NOT EXCEED ???. OFFSETS FOR OTHER BEAMS SHALL NOT EXCEED ???. COLUMN ERECTION TOLERANCES -------------------------- ??? Project No. 9654 145 ATTACHMENT "F" CURTAIN WALL SECTION 08900 PAGE 28 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- [MAP] -------------------------------------------------------------------------------- XXX XX XXXXXXX 00000 Xxoject No. 9654 146 ATTACHMENT "G" SWISS RE AMERICA U.S. HEADQUARTERS TURNXX XXXSTRUCTION CO. NORTH CASTLE, NY 3/31/97 ADDENDUM #1 CURTAINWALL BIDDER QUESTIONS
AutoNDA by SimpleDocs
Horizontal alignment. Horizontal curve deficiencies can best be identified by a review of As- Constructed plans, but superelevation rates need to be measured in the field. As a minimum, superelevation is to be corrected with the 3-R project. Additional mitigation (delineation, signing, etc.) may also be appropriate due to site-specific conditions. Again, the Region Traffic Engineer should be consulted for input.
Horizontal alignment. The existing horizontal alignment will be developed from a survey of recovered existing street centerline monuments. This alignment will be used as the record centerline of improvement and the centerline of construction. Minor shifts in the travel lanes will be designed as tapers if the deflection angle of the shift is consistent with (not greater than) that as calculated for the design speed. Otherwise, a horizontal curve must be introduced or the design speed reduced. Turns at intersections will be designed on the basis of vehicle turn templates.

Related to Horizontal alignment

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Substantial Completion “Substantial Completion” means the stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but, in the Owner’s opinion, the Work has progressed to the point such that all parts of the Work under consideration are fully operational and usable for intended purposes, as evidenced by a Certificate of Substantial Completion approved by the Owner. If a Certificate of Occupancy is required by public authorities having jurisdiction over the Work, said certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall notify Owner’s Designated Representative (sometimes referred to as the “ODR”) and request a determination as to whether the Work or designated portion thereof is substantially complete. If the ODR does not consider the Work substantially complete, the ODR will notify the Contractor giving reasons therefore. Failure on the Owner’s part to list a reason does not alter the responsibility of the Contractor to complete all Work in accordance with the terms of this Agreement. After satisfactorily completing items identified by Owner’s Designated Representative, the Contractor shall then submit another request for the ODR to determine Substantial Completion. If The ODR considers the Work substantially complete, The ODR will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final completion and final payment, shall establish the time within which the Contractor shall finish the punch list, and shall establish responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the Contractor to complete all Work in accordance with the terms and conditions of this Agreement. The certificate of Substantial Completion shall be signed by the Owner and the Contractor to evidence acceptance of the responsibilities assigned to them in such certificate. Substantial Completion (as defined in this agreement) for all stages of the Work shall be achieved on or before the following Substantial Completion date: DATE FOR SUBSTANTIAL COMPLETION: TBD Under no circumstances will the time for Substantial Completion exceed this date without a written amendment to this Agreement. THE TIMES SET FORTH IN THE CONSTRUCTION DOCUMENTS ARE AN ESSENTIAL ELEMENT OF THE AGREEMENT. TIME LIMITS STATED IN THE CONTRACT DOCUMENTS ARE OF THE ESSENCE OF THIS AGREEMENT.

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • Projects There shall be a thirty (30) km free zone around the projects excluding the Metro Vancouver Area. For local residents, kilometers shall be paid from the boundary of the free zone around the project. Workers employed by any contractor within an identified free zone who resides outside of that same free zone will be paid according to the Kilometer Chart from the project to their residence less thirty

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!