Hydraulic Design and Sediment and Erosion Control Design (Subconsultant Sample Clauses

Hydraulic Design and Sediment and Erosion Control Design (Subconsultant. Sungate) • Complete a field visit to verify existing drainage patterns and collect supplemental survey data for the project area. • Complete hydraulic designs for the project in accordance with NCDOT’s Guidelines for Drainage Studies and Hydraulic Design. Sungate will complete inlet and storm drainage calculations and ditch calculations. Sungate will attempt to provide stormwater treatment using Stormwater Control Measures where practicable. • For each stormwater outfall, Sungate will complete an analysis to determine that the downstream receiving channel will not be adversely affected. This will include calculation of preconstruction and postconstruction discharges for the 2, 5, and 10-year storm events. • Sungate will provide a Stormwater Management Plan based on NCDOT’s spreadsheet format. Stormwater Control Measures design in not included in this scope of work. • Sungate will prepare a Drainage Summary in NCDOT standard format. • It is anticipated that the project will disturb greater than 1 acre of land. Sungate will prepare and submit Sedimentation and Erosion Control Plans for NCDEQ Land Quality review and approval. Sungate will coordinate with the Town for signature on the Financial Responsibility Form. The Town will provide a check for the review fee. Sungate will complete Clearing and Grubbing Phase and Final Grade Phase erosion control designs and provide quantities and project special provisions.
AutoNDA by SimpleDocs

Related to Hydraulic Design and Sediment and Erosion Control Design (Subconsultant

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Technology Upgrades Notwithstanding any other provision of this Agreement, Verizon shall have the right to deploy, upgrade, migrate and maintain its network at its discretion. The Parties acknowledge that Verizon, at its election, may deploy fiber throughout its network and that such fiber deployment may inhibit or facilitate PNG’s ability to provide service using certain technologies. Nothing in this Agreement shall limit Verizon's ability to modify its network through the incorporation of new equipment or software or otherwise. PNG shall be solely responsible for the cost and activities associated with accommodating such changes in its own network.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Technology Access A. Contractor expressly acknowledges that state funds may not be expended in connection with the purchase of an automated information system unless that system meets certain statutory requirements relating to accessibility by persons with visual impairments. Accordingly, Contractor represents and warrants to System Agency that the technology provided to System Agency for purchase (if applicable under this Contract or any related Solicitation) is capable, either by virtue of features included within the technology or because it is readily adaptable by use with other technology, of:

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitation, either by competitive bidding or negotiation, made by the Contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential Subcontractor or supplier shall be notified by the Contractor of the Contractor’s obligations under this Agreement and the Regulations relative to non-discrimination on the grounds of race, color, or national origin.

Time is Money Join Law Insider Premium to draft better contracts faster.