Impact of implementation on existing Services & Infrastructure Sample Clauses

Impact of implementation on existing Services & Infrastructure. Identify any impact as a result of implementing this Future Service Contract e.g. any proposed planned outages, summary of additional equipment/software required Not applicable to this initiation phase.
AutoNDA by SimpleDocs
Impact of implementation on existing Services & Infrastructure. Identify any impact as a result of implementing this Future Service Contract e.g. any proposed planned outages, summary of additional equipment/software required As the Blue Coat devices are new infrastructure, it is not expected that there will be an impact in building, configuring and integrating the devices. Following migration of NCS to the new Blue Coat devices the existing Blue Coats will have a much greater capacity for the other applications remaining on these devices. There will also be much enhanced reporting on existing Blue Coat performance as well as for the new devices. At the end of Year 1 term Capgemini will require to provide a quotation for renewal of the maintenance / software licenses as required. At some future point of time, following analysis of the reporting from the Blue Coat Enterprise Reporter, the Agency may wish to consider migration of other applications to use the new devices with possible decommissioning of the old devices.
Impact of implementation on existing Services & Infrastructure. Identify any impact as a result of implementing this Future Service Contract e.g. any proposed planned outages, summary of additional equipment/software required FSC2320 will not directly impact any existing services or infrastructure, but will require planned time/effort from identified individuals within Authority and Contractor teams.
Impact of implementation on existing Services & Infrastructure. Identify any impact as a result of implementing this Future Service Contract e.g. any proposed planned outages, summary of additional equipment/software required Outages will be required during implementation to Live, which shall be defined and agreed in the Release Plans (see Section 1.3 – J and K). The system will not be available during the time of deployment during 20th Sept to 24th Sept 2012 (inclusive). The Batch Jobs that process ESF actuals are expected to be turned off from 28/08/12 until 21/09/12, this will result in no exception reports or summarization reports being produced during this period.

Related to Impact of implementation on existing Services & Infrastructure

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • Support and Services ISD and HC agree to the following conditions:

  • Implementation Services The Company and the Client have developed a plan for implementing the services to be provided hereunder, including with respect to the transition of responsibility for such services from the Client and its current administrator to the Company, which plan attached hereto as Schedule I (the “Implementation Plan”). The Company shall perform the services required to complete the Implementation Plan, as set forth therein (the “Implementation Services”). The Company and the Client shall comply with any applicable requirements agreed in the Implementation Plan.

  • SERVICE MONITORING, ANALYSES AND ORACLE SOFTWARE 11.1 We continuously monitor the Services to facilitate Oracle’s operation of the Services; to help resolve Your service requests; to detect and address threats to the functionality, security, integrity, and availability of the Services as well as any content, data, or applications in the Services; and to detect and address illegal acts or violations of the Acceptable Use Policy. Oracle monitoring tools do not collect or store any of Your Content residing in the Services, except as needed for such purposes. Oracle does not monitor, and does not address issues with, non-Oracle software provided by You or any of Your Users that is stored in, or run on or through, the Services. Information collected by Oracle monitoring tools (excluding Your Content) may also be used to assist in managing Oracle’s product and service portfolio, to help Oracle address deficiencies in its product and service offerings, and for license management purposes.

  • Project Implementation 2. The Borrower shall:

  • ACCESS TO OPERATIONS SUPPORT SYSTEMS 2.1 BellSouth shall provide Max-Tel access to operations support systems (“OSS”) functions for pre-ordering, ordering and provisioning, maintenance and repair, and billing. BellSouth shall provide access to the OSS through manual and/or electronic interfaces as described in this Attachment. It is the sole responsibility of Max-Tel to obtain the technical capability to access and utilize BellSouth’s OSS interfaces. Specifications for Max-Tel ’s access and use of BellSouth’s electronic Version R4Q01: 12/01/01 interfaces are set forth at xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx and are incorporated herein by reference.

  • Existing Services In the disconnection and sealing of services the Contractor is to comply with the requirements of the Authorities concerned and is to allow in his prices for serving all notices and paying all fees as necessary. The Contractor must take all necessary precautions and will be responsible for damage caused to any underground cables or services which exist on site.

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

Time is Money Join Law Insider Premium to draft better contracts faster.