Infiltration Rates from Design Manuals for Storm Water Sample Clauses

Infiltration Rates from Design Manuals for Storm Water. Infiltration Facilities Two widely recognized references are used to design of storm water infiltration facilities in Washington State. One is the Washington Department of Ecology’s Stormwater Management Manual for Western Washington (WDOE, 2001), and the second is the King County Surface Water Design Manual (King County, 1998). The Department of Ecology manual recommends three methods for estimating long-term infiltration rates. The first method is based on a correlation between USDA soil texture and infiltration rates for homogeneous soils. The infiltration rates that the Department of Ecology has recommended, which are reproduced in Table 1.2, are based on a correlation developed by Xxxxx, et al. (1982) with minor changes based on the Water Environment Federation (1998). The manual indicates that infiltration rates provided through this correlation represent “short-term conservative rates for homogeneous soils.” These estimates do not consider the effects of long-term clogging due to siltation and biomass buildup in the infiltration facility. The Department of Ecology recommends that the short-term infiltration rates be reduced by dividing them by a correction factor of 2 to 4, depending on the soil textural classification. These correction factors, which are included in Table 1.2, can be reduced if approved by the local jurisdiction for sites with little soil variability, sites that will have a high degree of long-term facility maintenance, or sites where pretreatment will be employed to reduce the total suspended solids entering the infiltration facility. The WDOE manual specifies that correction factors must be greater than or equal to 2.0 and that factors higher than those included in Table 1.2 should be considered “for situations where long-term maintenance will be difficult to implement, where little or no pretreatment is anticipated, or where site conditions are highly variable or uncertain.” The second method for estimating infiltration rates included in the Department of Ecology manual is based on soil gradation parameters measured with the ASTM soil gradation procedure. These estimates are based on studies that compare infiltration measurements from full-scale infiltration facilities to soil gradation data developed with the ASTM procedure (ASTM D422). The recommended infiltration rates are included in Table 1.3. These estimates are described as “long-term rates” that represent average conditions regarding site variability, the degree of long-...
AutoNDA by SimpleDocs

Related to Infiltration Rates from Design Manuals for Storm Water

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitation, either by competitive bidding or negotiation, made by the Contractor for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential Subcontractor or supplier shall be notified by the Contractor of the Contractor’s obligations under this Agreement and the Regulations relative to non-discrimination on the grounds of race, color, or national origin.

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Solicitations for Subcontractors, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin, sex, age, and disability/handicap.

  • Standards for Network Elements 1.8.1 BellSouth shall comply with the requirements set forth in the technical references, as well as any performance or other requirements identified in this Agreement, to the extent that they are consistent with the greater of BellSouth’s actual performance or applicable industry standards.

  • Solicitations for Subcontracts, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Engineer of the Engineer's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

  • Contract Database Metadata Elements Title: North Syracuse Central School District and North Syracuse Bus Drivers Unit, International Brotherhood of Teamsters (IBT), Local 317 (2010) (MOA) Employer Name: North Syracuse Central School District Union: North Syracuse Bus Drivers Unit, International Brotherhood of Teamsters (IBT) Local: 317 Effective Date: 07/01/2010 Expiration Date: 06/30/2013 PERB ID Number: 5791 Unit Size: Number of Pages: 35 For additional research information and assistance, please visit the Research page of the Catherwood website - xxxx://xxx.xxx.xxxxxxx.xxx/library/research/ For additional information on the ILR School - xxxx://xxx.xxx.xxxxxxx.xxx/ / NORTH SYRACUSE CENTRAL SCHOOL DISTRICT and TEAMSTERS LOCAL 317, an Affiliate of the International Brotherhood of Teamsters COLLECTIVE BARGAINING AGREEMENT July 1,2010, through June 30, 2013 INDEX Accident Committee 18 Additional Work Assignments 8 Arbitration Procedure 22 Bereavement Leave 16 Board of Education 2 Bulletin Board 24 Credit Union 16 Discipline and Discharge 20 Dispatcher Substitute Memorandum of Understanding - Appendix E 31 Dues/Fee Deduction 3 Duration 26 Early Dismissal........................................................................ 24 Education 17 Employment and Run Assignment.......................................................... 5 Entire Agreement 25 General Considerations 25 Grievance Procedure 21 Health and Safety 19 Hiring 4 Holidays - Appendix B 28 Holidays 12 Inspection Privileges....................... 24 Insurance 14 Job Postings 11 Jury Duty...................................... 11 Labor Management Committee 25 Layoff and Recall 5 Management Rights 2 Memorandum Accident Review Committee - Appendix C 29 Memorandum Accident Review Committee - Appendix D 30 Modified Agency Fee 2 No Strikes/Lockouts. 3 Non-Discrimination 20 Overtime Pay 11 Parties to the Agreement 1 Pension 14 Personal Illness and Family Illness Days 15 Physical Examinations 19 Probationary Period 4 Purpose and Intent 1 Recognition 1 Run Guarantees 7 Safety Shoes 24 Seniority 4 Snow Days 12 Summer Assignments 9 Summer Work Rules 10 Xxxxxx Law 26 Time Off for Union Activities 24 Uniforms 17 Union Stewards 23 Unpaid Leaves of Absence 13 Wages and Longevity - Appendix A 27 Workers’ Compensation and Early Return to Work 17 Workers’ Compensation Claims 17 TABLE OF CONTENTS - CHANGES TO AGREEMENT ARTICLE Page 1 - PARTIES TO THE AGREEMENT. 1 13 - EMPLOYMENT AND RUN ASSIGNMENT 5 15 - ADDITIONAL WORK ASSIGNMENTS 8 17 - SUMMER WORK RULES 10 21- HOLIDAYS,......................................................................... 12 22- SNOW DAYS 12 25-INSURANCE 14 26 - PERSONAL ILLNESS AND FAMILY ILLNESS DAYS 15 38 - GRIEVANCE PROCEDURE 21 46 - SAFETY SHOES............................................................................. 25 49-DURATION 26 APPENDIX A - WAGES AND LONGEVITY 27 APPENDIX B - HOLIDAYS 28 APPENDIX E - SUBSTITUTE DISPATCHERS 31

  • Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.

Time is Money Join Law Insider Premium to draft better contracts faster.