For more information visit our privacy policy.Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing buildings or that occupy an area under 50 square feet behind the building they serve.
Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.
Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.
Two-Way Interconnection Trunks 2.4.1 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and Ymax, Ymax, at its own expense, shall: 2.4.1.1 provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA; and/or 2.4.1.2 obtain transport to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA (a) from a third party, or, (b) if Verizon offers such transport pursuant to this Agreement or an applicable Verizon Tariff, from Verizon. 2.4.2 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and Ymax, Verizon, at its own expense, shall provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA. 2.4.3 Prior to establishing any Two-Way Interconnection Trunks, Ymax shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Seconds (Hundred Call Seconds) information, and the Parties shall mutually agree on the appropriate initial number of End Office and Tandem Two-Way Interconnection Trunks and the interface specifications at the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA at which the Parties interconnect for the exchange of traffic. Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One- Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.4 On a semi-annual basis, Ymax shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that Ymax anticipates Verizon will need to provide during the ensuing two (2) year period for the exchange of traffic between Ymax and Verizon. Ymax’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Seconds (Hundred Call Seconds) equal to five (5). Either Party may disconnect End Office Two-Way Interconnection Trunks that, based on reasonable engineering criteria and capacity constraints, are not warranted by the actual traffic volume experienced. 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx- Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and Xxxx shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three (3) consecutive calendar traffic study months. 2.4.10 Ymax shall determine and order the number of Two-Way Interconnection Trunks that are required to meet the applicable design blocking objective for all traffic carried on each Two-Way Interconnection Trunk group. Ymax shall order Two-Way Interconnection Trunks by submitting ASRs to Verizon setting forth the number of Two-Way Interconnection Trunks to be installed and the requested installation dates within Verizon’s effective standard intervals or negotiated intervals, as appropriate. Ymax shall complete ASRs in accordance with OBF Guidelines as in effect from time to time. 2.4.11 Verizon may (but shall not be obligated to) monitor Two-Way Interconnection Trunk groups using service results for the applicable design blocking objective. If Verizon observes blocking in excess of the applicable design objective on any Tandem Two-Way Interconnection Trunk group and Ymax has not notified Verizon that it has corrected such blocking, Verizon may submit to Ymax a Trunk Group Service Request directing Ymax to remedy the blocking. Upon receipt of a Trunk Group Service Request, Ymax will complete an ASR to establish or augment the End Office Two-Way Interconnection Trunk group(s), or, if mutually agreed, to augment the Tandem Two-Way Interconnection Trunk group with excessive blocking and submit the ASR to Verizon within five (5) Business Days. 2.4.12 The Parties will review all Tandem Two-Way Interconnection Trunk groups that reach a utilization level of seventy percent (70%), or greater, to determine whether those groups should be augmented. Ymax will promptly augment all Tandem Two-Way Interconnection Trunk groups that reach a utilization level of eighty percent (80%) by submitting ASRs for additional trunks sufficient to attain a utilization level of approximately seventy percent (70%), unless the Parties agree that additional trunking is not required. For each Tandem Two-Way Interconnection Trunk group with a utilization level of less than sixty percent (60%), unless the Parties agree otherwise, Ymax will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for each respective group, unless the Parties agree that the Two-Way Interconnection Trunks should not be disconnected. In the event Ymax fails to submit an ASR for Two-Way Interconnection Trunks in conformance with this Section, Verizon may disconnect the excess Interconnection Trunks or bill (and Ymax shall pay) for the excess Interconnection Trunks at the applicable Verizon rates. 2.4.13 Because Verizon will not be in control of when and how many Two- Way Interconnection Trunks are established between its network and Ymax’s network, Verizon’s performance in connection with these Two- Way Interconnection Trunk groups shall not be subject to any performance measurements and remedies under this Agreement, and, except as otherwise required by Applicable Law, under any FCC or Commission approved carrier-to-carrier performance assurance guidelines or plan. 2.4.14 Ymax will route its traffic to Verizon over the End Office and Tandem Two-Way Interconnection Trunks in accordance with SR-TAP-000191, including but not limited to those standards requiring that a call from Ymax to a Verizon End Office will first be routed to the End Office Interconnection Trunk group between Ymax and the Verizon End Office.
Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.
Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.
Illumination Normal & emergency AC & DC illumination shall be provided adequately in the control room & other buildings of the substation. The switchyard shall also be provided with adequate illumination. Lighting of the entire control room building, fire-fighting pump house, other building (if any) and switchyard shall be done by LED based low power consumption luminaires.
COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.