Instrumentation / Completion Sample Clauses

Instrumentation / Completion. The area surrounding the well is being monitored with a micro-seismic network operated by the (independent) Swiss Seismological Service (SED) since early 2012. In the beginning, the network consisted of six three-component surface seismometers and one shallow (depth of 205 meters) three-component borehole station. Since 2014, the network has been reduced in numbers of surface stations (four instead of six) but is still online and functional with minimum resolution above ML 1.0 and a 15 km radial alert region at least until the end of August 2020. The well itself is instrumented with (non-remotely controlled) manometers without data storage device at the surface measuring the fluid pressure within the upper most cased hole sections of the well as indicated in Figure 9. Fluids (water/gas) r between Bridge-Plug (second mechanical barrie reservoir and well (salt osion Conserving fluid water with corr inhibitor) kill string nitoring of us Well head with manometer (mo raiser and annul Productio n packer (first seal between reservoir and well) Present wellbore conservation: schematic view Figure 9: Schematic view of the St.Gallen GT-1 well with completion installed since Nov. 2013 (adapted from [22])
AutoNDA by SimpleDocs
Instrumentation / Completion. The area surrounding the well has been monitored with a micro-seismic network operated by the (independent) Swiss Seismological Service (SED) since early 2012. In the beginning, the network consisted of six three-component surface seismometers and one shallow (depth of 205 meters) three-component borehole station. Since 2014, the network has been reduced to four surface stations (instead of six), but it is still online and functional with minimum resolution above ML 1.0 and a 15 km radial alert region. Monitoring is planned to last at least until the end of August, 2020. The well itself is instrumented with non-remotely controlled manometers without data storage device at the surface measuring the fluid pressure within the upper most cased hole- sections of the well as indicated in Figure 3.

Related to Instrumentation / Completion

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Instrumentation The acceleration shall be recorded during the test, using equipment in accordance with channel frequency class 1000 as specified in the latest version of ISO 6487.

  • Project Completion Part 1 – Material Completion

  • Documentation control Specify how documentation will be identified with an alpha numeric which indicates source, recipient, communication number etc. Provide details of any particular format or other constraints; for example that all contractual communications will be in the form of properly compiled letters or forms attached to e mails and not as a message in the e mail itself. State any particular routing requirements but note from TSC3 who issues what to whom.

  • Project Documentation All documentation provided to the City other than Project drawings shall be furnished on a Microsoft compatible compact disc.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • PROGRESS AND COMPLETION 8.2.1 All time limits stated in the Contract Documents are material terms and time is the essence of the Contract. A failure by Contractor to do what is required by the time specified in the Contract Documents is a breach of the contract.

  • Project Implementation 2. The Borrower shall:

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Completion The Subcontractor will be required, unless otherwise stated under the terms of this Agreement, to complete the Services: (choose one) ☐ - By the Specific date of ______________________, 20____. ☐ - In accordance with industry standards. ☐ - Other: ________________________________________________________