Integration of GEM and SOTA Sample Clauses

Integration of GEM and SOTA. ‌ 2.1.1 From SOTA to GEM‌ SOTA (State Of The Affairs) [ABZ12] is the ASCENS approach to describing the overall domain and the requirements for a system. SOTA abstracts the behavior of a system with a single trajectory through a state space. The state space is the so called state-of-the-affair space, and it represents the set of all possible states of the system at a single point of time (see Figure 3). ⟨ ⟩ The requirements of a system in SOTA are expressed as goals. A goal is an area of the SOTA space that a system should eventually reach, and it can be characterized by a goal pre-condition (the area of the SOTA space which activates the need of achieving a goal), the post-condition (the goal in itself, that is the actual area which has to be eventually reached for the goal to be satisfied), and utilities (constraints on how the goal should be reached, i.e., along which trajectory). Formally: G = Gpre, Gpost , U . SOTA is concerned with the overall domain and the requirements of the system. For this it is sufficient to deal with the state of the affairs without regard for details such as the state’s internal structure or the probabilities of the different trajectories. However, for a more detailed investigation of the structure and behavior of ensembles, we need a more expressive model. To this end, the concepts underlying General Ensemble Model (GEM) defined in WP1 (early described [HW11]) to model the behavior of ensembles, has been re-formulated in terms of an extension and generalization of SOTA. As in SOTA, in GEM it is not necessary to distinguish between ensemble and environment. How- ever, whenever it is necessary to do that, or when the system specification enforces such a distinction, a unique state space can always be obtained by combining ensemble and environment using a so-called Figure 3: The trajectory of an entity in the SOTA space, starting from a goal precondition and trying to reach the postcondition while moving in the area specified by the maintain condition. combination operator; in general, we will use the term system to refer to this combination. Combina- tion operators are also used as the means to hierarchically build ensembles from simpler components and smaller ensembles; therefore they serve as a uniform way to model a system’s structure and be- havior. ⊆ In general, a system can behave in a non-deterministic manner and therefore have multiple possible trajectories through the state space. In GEM we identify a system S with the...
AutoNDA by SimpleDocs

Related to Integration of GEM and SOTA

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Attachment A, Scope of Services The scope of services is amended as follows:

  • Integration of Exhibits All Exhibits attached to this Agreement are integral parts of this Agreement as if fully set forth herein, and all statements appearing therein shall be deemed disclosed for all purposes and not only in connection with the specific representation in which they are explicitly referenced.

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Use of Attachment Facilities by Third Parties Purpose of Attachment Facilities.‌‌ Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Attachment Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the New York State Transmission System and shall be used for no other purpose.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551