Labrador Inuit Lands Sample Clauses

Labrador Inuit Lands. Labrador Inuit Settlement Area (land and Waters) Labrador Inuit Settlement Area (Zone) Nunavut Québec Labrador Sea dor Xxxxx 53° 30' N kilometres scale
AutoNDA by SimpleDocs
Labrador Inuit Lands. 4.3.1 The boundaries of Labrador Inuit Lands on the Effective Date are set out in the Map Atlas (shown for illustrative purposes only in schedule 4-B) and described in appendix A-3 Part 2.
Labrador Inuit Lands. (a) are under the administration, control and management of the Nunatsiavut Government; and
Labrador Inuit Lands. The Settlement Area consists of 72,520 square kilometres of land and 48,690 square kilometres of ocean (referred to as the Zone). Within that area there will be 15,800 square kilometres of Inuit-owned land referred to as Labrador Inuit Lands. Inuit will have the most substantial rights and benefits in Labrador Inuit Lands but will also have certain rights and benefits throughout the rest of the Settlement Area. A new Inuit regional government known as the Nunatsiavut Government will have law-making powers under the Agreement, primarily on Labrador Inuit Lands and with respect to Inuit. A draft regional land use plan will be developed for the Settlement Area scheduled to be completed within three years of December 1, 2005. The plan will come into effect through Nunatsiavut Government legislation with respect to Labrador Inuit Lands, and provincial legislation with respect to the Settlement Area outside Labrador Inuit Lands.

Related to Labrador Inuit Lands

  • Metode Penelitian Penelitian ini bersifat deskriptif. Jenis penelitian yang digunakan adalah hukum normatif. Sumber data yang dipergunakan pada penelitian ini adalah data sekunder yang terdiri dari :

  • SHOPPING CENTRES 1. The general terms and provisions of the VBIA shall apply to “Shopping Centres” (as defined) with the following variations:

  • Land The real property described in Exhibit A attached hereto and made a part hereof (the “Land”);

  • Petroleum Storage Systems A. At Company’s expense, Company will at all times comply with all federal, state, and local requirements, including but not limited to, the regulations of the FDEP as stated in Chapters 62-761 and 62-762, FAC, the requirements of the Federal Oil Pollution Prevention regulation found in Title 40 of the Code of Federal Regulations Part 112 (40 CFR part 112), as well as the requirements of the Environmental Protection Commission of Hillsborough County (EPC), as may be amended or replaced, pertaining to petroleum storage tank and piping system construction, operation, inspection, and compliance monitoring programs; release detection methods and procedures; maintenance; and preventative maintenance programs. Company will be responsible for all spillage, overflow, or escape of gases, petroleum or petroleum products, and for all fines and penalties in connection therewith. All petroleum storage systems will be registered by Company, and Company will display the registration placard as required by law.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • MINES The Contractor represents and warrants that neither it, its parent entities (if any), nor any of the Contractor’s subsidiaries or affiliated entities (if any) is engaged in the sale or manufacture of anti-personnel mines or components utilized in the manufacture of anti-personnel mines.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • acres EXCEPTING THEREFROM: PART OF THE SOUTHWEST QUARTER OF SECTION 8, TOWNSHIP 26 NORTH, RANGE 12 EAST, XXXXXXXX TOWNSHIP, XXXXX COUNTY, INDIANA, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHWEST CORNER OF SAID SOUTHWEST QUARTER FOUND PER RECORD WITNESS; THENCE NORTHERLY, 527.00 FEET ALONG THE WEST LINE OF SAID SOUTHWEST QUARTER TO A P.K. NAIL; THENCE EASTERLY, DEFLECTING RIGHT 90 DEGREES 00 MINUTES 16 SECONDS, 655.00 FEET PARALLEL WITH THE SOUTH LINE OF SAID SOUTHWEST QUARTER TO A 5/8” REBAR STAKE; THENCE SOUTHERLY, DEFLECTING RIGHT 89 DEGREES 59 MINUTES 44 SECONDS, 527.00 FEET PARALLEL WITH THE WEST LINE OF SAID SOUTHWEST QUARTER TO A P.K. NAIL ON THE SOUTH LINE OF SAID SOUTHWEST QUARTER; THENCE WESTERLY, DEFLECTING RIGHT 90 DEGREES 00 MINUTES 16 SECONDS, 655.00 FEET ALONG SAID SOUTH LINE TO THE PLACE OF BEGINNING. CONTAINING 7.92 ACRES. CONTAINING AFTER SAID EXCEPTION 32.48 ACRES. Parcel No. 90-08-08-400-004,000-002 Commencing at the southwest corner of the southeast quarter of section eight (8), in township 26 north, range 12 east, and running thence north 1324.70 feet to the northwest corner of the south half of said quarter, thence east 558.20 feet to the west line of the right of way of the Ft. Xxxxx, Cincinnati and Louisville railroad company, thence in a southwesterly direction along the west line of said Railroad right of way a distance of 1437.50 feet to the south line of said Section 8, thence west 12 feet to the place of beginning, containing 8,67 acres. Parcel No. 90-08-08-400-020.000-002 PART OF THE NORTH HALF OF THE SOUTHEAST QUARTER OF SECTION 8, TOWNSHIP 26 NORTH, RANGE 12 EAST, XXXXXXXX TOWNSHIP, XXXXX COUNTY, INDIANA, DESCRIBED AS FOLLOWS: STARTING AT THE NORTHEAST CORNER OF SAID SOUTHEAST QUARTER FOUND PER RECORD WITNESS; THENCE WESTERLY, 1528.71 FEET ALONG THE NORTH LINE OF SAID SOUTHEAST QUARTER TO THE WESTERLY RIGHT-OF-WAY LINE OF THE NORFOLK & WESTERN RAILROAD, WHICH SHALL BE THE PLACE OF BEGINNING; THENCE SOUTHWESTERLY, DEFLECTING LEFT 67 DEGREES 21 MINUTES 32 SECONDS, 617.57 FEET ALONG SAID WESTERLY RIGHT-OF-WAY LINE; THENCE SOUTHWESTERLY, DEFLECTING RIGHT 00 DEGREES 02 MINUTES 05 SECONDS, 816.82 FEET ALONG SAID WESTERLY RIGHT-OF-WAY LINE TO THE SOUTH LINE OF THE NORTH HALF OF SAID SOUTHEAST QUARTER; THENCE WESTERLY, DEFLECTING RIGHT 67 DEGREES 09 MINUTES 58 SECONDS, 565.65 FEET ALONG THE SOUTH LINE OF THE NORTH HALF OF SAID SOUTHEAST QUARTER TO THE WEST LINE OF SAID SOUTHEAST QUARTER; THENCE NORTHERLY, DEFLECTING RIGHT 90 DEGREES 03 MINUTES 19 SECONDS, 1325.61 FEET ALONG THE WEST LINE OF SAID SOUTHEAST QUARTER TO THE NORTHWEST CORNER OF SAID SOUTHEAST QUARTER; THENCE EASTERLY, DEFLECTING RIGHT 90 DEGREES 07 MINUTES 21 SECONDS, 1120.66 FEET ALONG THE NORTH LINE OF SAID SOUTHEAST QUARTER TO THE PLACE OF BEGINNING. CONTAINING 25.64 ACRES MORE OR LESS.

  • Indigenous Peoples 8. The Borrower shall ensure, or cause the Project Executing Agency and Project Implementing Agency to ensure, that the Project does not have any indigenous peoples impacts, within the meaning of the SPS. In the event that the Project or any Subproject does have any such impact, the Borrower shall take, or cause the Project Executing Agency or Project Implementing Agency to take, all steps required to ensure that the Project or Subproject complies with the applicable laws and regulations of the Borrower and with the SPS.

  • Minerals All minerals, crops, timber, trees, shrubs, flowers and landscaping features now or hereafter located on, under or above Land;

Time is Money Join Law Insider Premium to draft better contracts faster.