Trunk Side A Central Office Switch connection that is capable of, and has been programmed to treat the circuit as, connecting to another switching entity, for example, to another carrier’s network. Trunk side connections offer those transmission and signaling features appropriate for the connection of switching entities and cannot be used for the direct connection of ordinary telephone station sets.
Therapist Availability Therapist’s office is equipped with a confidential voice mail system that allows Patient to leave a message at any time. Therapist will make every effort to return calls within 24 hours (or by the next business day), but cannot guarantee the calls will be returned immediately. Therapist is unable to provide 24-hour crisis service. In the event that Patient is feeling unsafe or requires immediate medical or psychiatric assistance, he/she should call 911, or go to the nearest emergency room.
TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.
DS3 Loop DS3 Loop is a two-point digital transmission path which provides for simultaneous two-way transmission of serial, bipolar, return-to-zero isochronous digital electrical signals at a transmission rate of 44.736 megabits per second (Mbps) that is dedicated to the use of the ordering CLEC in its provisioning of local exchange and associated exchange access services. It may provide transport for twenty-eight (28) DS1 channels, each of which provides the digital equivalent of twenty-four (24) analog voice grade channels. The interface to unbundled dedicated DS3 transport is a metallic-based electrical interface.
Subgrade Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
Porcupine Site Highway 11
Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.
Orthodontia lifetime maximum Orthodontia benefits are subject to a three thousand dollar ($3,000) lifetime maximum benefit.
Dienste Und Materialien Von Drittanbietern (a) Die Apple-Software gewährt möglicherweise Zugang zu(m) iTunes Store, App Store, Apple Books, Game Center, iCloud, Karten von Apple und zu anderen Diensten und Websites von Apple und Drittanbietern (gemeinsam und einzeln als „Dienste“ bezeichnet). Solche Dienste sind möglicherweise nicht in xxxxx Sprachen oder in xxxxx Ländern verfügbar. Die Nutzung dieser Dienste erfordert Internetzugriff und die Nutzung bestimmter Dienste erfordert möglicherweise eine Apple-ID, setzt möglicherweise dein Einverständnis mit zusätzlichen Servicebedingungen voraus und unterliegt unter Umständen zusätzlichen Gebühren. Indem du diese Software zusammen mit einer Apple-ID oder einem anderen Apple-Dienst verwendest, erklärst du dein Einverständnis mit den anwendbaren Servicebedingungen für diesen Dienst, z. B. den neuesten Apple Media Services-Bedingungen für das Land, in dem du auf diese Services zugreifst, die du über die Webseite xxxxx://xxx.xxxxx.xxx/legal/ internet-services/itunes/ anzeigen und nachlesen kannst
Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.