Manufacturing Drawings Sample Clauses

Manufacturing Drawings. ‌ In the event of a Defect resulting in outage of the Plant in excess of two (2) days during the applicable Warranty Period, Seller shall immediately give Buyer full, unimpeded, and unqualified access to all information, documents, processes and operations, processes or operations so as to enable Buyer to satisfy itself that the Plant and Equipment shall in all respects be properly and timely repaired and/or replaced and so as to be in full compliance with the requirements of the Agreement.
AutoNDA by SimpleDocs
Manufacturing Drawings. In the event of a Defect resulting in outage of the Facility in excess of two (2) days during the applicable Warranty Period, Developer shall immediately give PacifiCorp full, unimpeded, and unqualified access to all information, documents, processes and operations so as to enable PacifiCorp to satisfy itself that the Facility and Equipment shall in all respects be properly and timely repaired or replaced and so as to be in full compliance with the requirements of this Agreement.
Manufacturing Drawings. 10.1. If the Goods and/or Services provided by the Contractor are to be based on manufacturing drawings, these drawings must be:
Manufacturing Drawings. In the event of a Defect resulting in outage of the Plant in excess of two (2) days during the applicable Warranty Period, Contractor shall immediately give Company full, unimpeded, and unqualified access to all information, documents, processes and operations, processes or operations so as to enable Company to satisfy itself that the Plant and Equipment shall in all respects be properly and timely repaired and/or replaced and so as to be in full compliance with the requirements of the Contract.
Manufacturing Drawings. Sets of manufacturing drawings and cabling lists are attached with this document. These drawings are for reference use only. The subcontractor shall modify use 'as is', or redo these drawings to support manufacturing of the Multi-Function Work Station. Attachment B SUBCONTRACT # 198422 Schedule A Schedule A- Payment schedule and Milestone Dependences- This remains propriatary and sensisity material. Attachment C- Subcontract # 198422 GENERAL PROVISIONS LOCKHEED XXXXXX CORPORATION GENERAL PROVISIONS INTERNATIONAL COMMERCIAL SUBCONTRACTS/PURCHASE ORDERS 1 Acceptance of Contract/Terms and Conditions. 2 Applicable Laws 3 Assignment 4 Changes 5 Communication with Lockheed Xxxxxx Customer 6 Contract Direction 7 Default 8 Definitions 9 Disputes 10 Ecusable Delay 11 Export Control 12 Extras 13 Furnished Property 14 Gratuities/Kickbacks 15 Importer of Record 16 Independent Contractor Relationship 17 Information of Lockheed Xxxxxx 18 Information of Seller 19 Inspection and Acceptance 20 Insurance/Entry on Lockheed Xxxxxx'x Property
Manufacturing Drawings. The Contractor will receive a complete set of specification drawings from CERN. The manufacturing drawings, which are adapted to the facilities of the Contractor have to be prepared by the Contractor.

Related to Manufacturing Drawings

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, Title 24 calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow all of Tenant’s Agents to bid on the work and to obtain all applicable permits (collectively, the ‘‘Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval, which shall not be unreasonably withheld, conditioned, or delayed. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings, Landlord shall not unreasonably withhold, condition, or delay its approval of the Final Working Drawings. Landlord shall approve or reasonably EXHIBIT A disapprove of the Final Working Drawings within ten (10) business days after Landlord’s receipt thereof. If Landlord reasonably withholds its approval, Landlord shall provide Tenant with the specific reasons therefor.

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

  • Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. The term "Specifications" shall also include all written matter in the Project Manual or on the drawings and any Addenda or Change Orders thereto.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Manufacturing Costs Patheon shall be allowed to adjust the Fees: (i) for costs associated with the conversion of Granulations and Components into Drug Product (the “Conversion Costs”) in respect of the Drug Product based on the most recently available final Producers’ Price Index for Pharmaceutical Product as published by the U.S. Bureau of Labor Statistics or any governmental successor thereto (“PPI”) using the procedure set forth in Section 4.3 and (ii) for Component Costs to pass on the actual amount of any increase or decrease in such costs without xxxx-up. For each Contract Year in which Patheon is entitled to adjust the Fees Patheon shall provide Client with written notice of any change in the Fees within 30 days of receipt by Patheon of the Annual Forecast. The Parties agree that the Fees shall not be adjusted more than once per Contract Year, however this limitation shall not include price adjustments under section 4.3 or 4.4. In addition, notwithstanding anything herein to the contrary, Manufacturing Fees associated with Conversion Costs shall not be increased by greater than [***]% per annum in any Contract Year during the Term. There shall be no similar limitation in terms of increases in Component Costs which shall be passed on to Client in an amount equal to the actual increase paid by Patheon without markup.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.