Mechanical - The Sample Clauses

Mechanical - The. Design Report shall include a discussion of the major mechanical components, anticipated HVAC requirements, and proposed equipment. It is expected that the report will provide a discussion on compliance with regulatory requirements.
AutoNDA by SimpleDocs

Related to Mechanical - The

  • Mechanical (i) Large scale mechanical details complete. (ii) Mechanical schedules for equipment completed. (iii) Completed electrical schematic for environmental cooling and exhaust equipment. (iv) Complete energy conservation calculations and report.

  • Mechanical Rights The Licensor hereby grants to Licensee a non-exclusive License to use Master Recording in the reproduction, duplication, manufacture, and distribution of phonograph records, cassette tapes, compact disks, internet downloads, other and miscellaneous audio and digital recordings, and any lifts and versions thereof (collectively ,”Recordings”) worldwide for up to the pressing or selling a total of 5000 copies of such Recordings or any combination of such Recordings. Additionally, Licensor shall be permitted to distribute unlimited internet downloads for non-profit and non-commercial use.

  • Dispatching 1. Dispatchers will schedule and assign drivers and vehicles in accordance with the trips scheduled for each day; 2. Dispatchers will assist drivers while they are in service to carry out the assigned trips on time by providing address assistance and telephoning passengers as needed. 3. Dispatchers will monitor the performance of scheduled trips, reassigning trips and/or adjusting the number of vehicles in service as needed to ensure on-time performance in the most efficient manner. 4. Dispatchers will provide continuous monitoring of assigned radio frequencies during all hours that vehicles are in service, answer and respond to telephone calls on the Ride Status line, and respond to calls from drivers and OoA staff.

  • Fabrication Making up data or results and recording or reporting them.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Contract Monitoring The criminal background checks required by this rule shall be national in scope, and must be conducted at least once every three (3) years. Contractor shall make the criminal background checks required by Paragraph IV.G.1 available for inspection and copying by DRS personnel upon request of DRS.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.