Metering Points. Metering for generators is located the on the 4.8 kV, Glenwood-Medixx 000 Line. Transformer TB #1 and approximately 500 feet of 4.8 kV circuit separate the Metering and Delivery Points. 1 August 7, 1998 Granby Hydro Plant INTERCONNECTION AGREEMENT - Exhibit A Refer to the Granby Single Line Diagram, Drawing No. 811413
Metering Points. Electric power and energy supplied and delivered under the 1992 Agreement shall be measured by suitable metering equipment which shall be provided, owned and maintained by PSI or IPL as designated below at the following metering points: (i) 138,000 volt metering equipment installed by PSI at the Five Points Substation; 138,000 volt metering equipment installed by PSI at the Centerton Substation; 138,000 and 345,000 volt metering equipment installed by IPL at the Petersburg Station; 345,000 volt metering equipment installed by IPL at its Sunnyside Substation and at PSI's Gwynneville and Whitestown Substations; and 12.47 kV metering equipment installed by PSI at its Carmel Southeast Substation, and (ii) At such other locations as hereafter may be agreed upon by the Parties pursuant to Section 1.02 hereof. Electric power and energy supplied and delivered at the Alternate Delivery Points specified in Section 4.01 shall be measured by metering equipment either provided, owned and maintained by IPL or third parties. Such metering equipment shall not be subject to Sections 4.04 through 4.07 but shall meet the reasonable requirements of the Operating Committee." 1.01.3 Section 6.03 of the 1992 Agreement shall read as follows:
Metering Points. Electric power and energy supplied and delivered under the 1992 Agreement shall be measured by suitable metering equipment which shall be provided, owned and maintained by PSI or ILP as designated below at the following metering points: (i) 138,000 volt metering equipment installed by PSI at the Five Points Substation; 138,000 volt metering equipment installed by PSI at the Centerton Substation; 138,000 and 345,000 volt metering equipment installed by IPL at the Petersburg Station; 345,000 volt metering equipment installed by IPL at its Sunnyside Substation and at PSI*s Gwynneville and Whitestown Substations; and 12.47kV metering equipment installed by PSI at its Carmel Southeast Substation, and (ii) At such other locations as hereafter may be agreed upon by the Parties pursuant to Section 1.02 hereof.
Metering Points. Metering for generators is located on the 2.3 kV side of transformer TB #1. The transformer bank and approximately 50 feet of 34.5 kV conductor separate the Metering and Delivery Points. August 7, 1998 FIVE FALLS HYDRO PLANT Refer to the Five Falls Station Interconnection Diagram, Drawing No. 811497
Metering Points. Electric Power and energy supplied under this agreement shall be measured by suitable metering equipment, having appropriate voltage rating, to be installed, owned and maintained at the metering point or points by the party in each case, as provided below:
Metering Points. Electric power and energy supplied under this Agreement shall be measured by suitable metering equipment, at the voltages and metering points specified below ("Metering Points") and at such other points, voltages, and ownership as may be agreed upon by the parties in a written amendment hereto: 345 KV meters owned by IPL at the Petersburg substation of IPL. 138 KV meters owned by IPL at the Petersburg substation of IPL. 345 KV meters owned by IPL at the Sunnyside substation of IPL. 138 KV meters owned by IPL at the Five Points substation of PSI. 345 KV meters owned by IPL at the Whitestown substation of PSI.
Metering Points. Metering for generators is located the on the 2.4 kV side of Herrings Transformer TB #1. The transformer bank and approximately 30 feet of 23 kV circuit separate the Metering and Delivery Points. August 7, 1998 171 HEUVELTON HYDRO PLANT INTERCONNECTION AGREEMENT - Exhibit A Refer to the Heuvelton Hydro Station Interconnection Diagram, Drawing No. 811461
Metering Points. The physical locations of Metering Equipment installations are determined by written agreement of the Asset Owners’ Committee. When required, compensation from metering points to transfer points shall be determined by the Asset Owners’ Committee.
Metering Points. The Metering Points for power and energy delivered along the Interconnection Facilities are at the Xxxxxxxx substation, located in the Town of Massena, St. Lawrence County, New York, United States. Title : Senior Account Manager Address : 000 Xxxx Xxxx Xxxx, X-0 Syracuse, NY 13202 Telephone : (000) 000-0000 Email : Xxxxx.Xxxxxxx@xxxxxxxxxxxx.xxx
Metering Points. Net unit metering for the generator #2 will be located between switch 5133 and #1 Bank. Approximately 75 feet of 4.8KV cable, Transformer bank #1 and approximately 20 feet of 34.5KV circuit separate the metering and the delivery points. 146 RAYMONDVILLE HYDRO PLANT Refer to the Raymondville Hydro Station Interconnection Diagram, Drawing No. 811478