Mobility paths Sample Clauses

Mobility paths. The 1st semester (Table 1) of studies always takes place in Rome (Italy), at the Coordinating Institution. This is the entrance university for all MASS students, who will remain enrolled at the University of Rome “Tor Vergata” for the whole duration of their studies. At the end of the Welcome and Information Days, the Student is expected to communicate the intentions about the study plan and mobility scheme for the second semester. In any case the Student shall submit the proposed plans by November 15th, <insert year>. Mid-term of the second semester, the Student will be asked to express a first and a second choice for the Student’s destination in the subsequent semesters. The study plan and mobility path proposed by the Student is subject to approval by the MASS Teaching Committee according to Article 5.3 and Annex V of the CA and to the mobility requirements set out in the E+PG. In particular, the mobility path must include 1 semester of studies in each of at least 2 countries, of which at least one must be an EU Member State or a third country associated to the Erasmus+ Programme. These two countries must be different from the Student’s country of residence at enrolment stage (“Mobility Rule”). The Winter School lasts for ~3-5 days and takes place in January-February in holiday houses. The 2nd semester (Table 1) takes place in France, Germany, or Serbia, at one of the three Consortium Universities, University of Côte d’Azur, University of Bremen, University of Belgrade. The Summer School lasts for 1-2 weeks and takes place in June-July in holiday houses. The summer break takes place in August. The 3rd semester (Table 1) takes place at a chosen location among the four Consortium Universities. It includes an internship that may be offered by a Third Party in collaboration with the Consortium University where the Student spends the third semester. The Student shall participate in the second Winter School at the end of the 3rd semester. The Master Thesis must be completed during the 4th semester (Table 1) and any of the 4 Consortium Universities can be chosen. The Master Thesis will be jointly supervised by at least two academics belonging to different Consortium Universities and possibly by a member of a third party, in accordance with Article 9 of the CA. The defence of the Master Thesis will take place at the Consortium University hosting the Student for the 4th semester.
AutoNDA by SimpleDocs

Related to Mobility paths

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Site Access Dell requires the right to access the APEX System in a timely way and as provided in the Service Offering Description to provide the Support Services. Failure to ensure that Customer provides Dell with timely access to a Site will relieve Dell of the Support Services obligations and Dell may also, at Dell’s discretion, suspend the APEX Service.

  • Building Access The authorized representatives of the Union shall upon request have access to the District’s premises at any reasonable time for the purpose of adjusting grievances, investigating working conditions, or ascertaining that provisions of this Agreement are being adhered to; provided the representatives check in with the front office, following school protocol to receive a visitor’s badge, they do not interfere with employees in the performance of their duties. The Union shall furnish the District with the names of its authorized representatives.

  • Technical Support Services 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Equipment and Software To use the Mobile Remote Deposit Services, you must obtain and maintain at your expense, compatible equipment and software that we may specify from time to time.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!