Model Roles. Describe what kind of model will be developed and by what program. The role of this model will be to depict the visual concept and general layout of the project along with space requirements, along with other requirements as described in the UGA BIM Standards.
AutoNDA by SimpleDocs
Model Roles. All design models will be used to reflect the design. The models will then be used to generate the contract documents. The Construction model will be used primarily for estimating, scheduling, and constructability analysis.
Model Roles. The Architectural and Consulting Engineers’ models will be used to represent the actual assembly of the building from construction.
Model Roles. The Architectural model will show the general design and layout of the building structure and act as the baseline for all other subsystem designs, such as MEP and Structural models. The subsystem designs will be used to show the initial selection and layout of building components. The Architectural model and Consulting Engineers’ model will be used to inform the Energy Models.
Model Roles. The Architectural and Consulting Engineers’ models will be revised throughout construction, based on owner directives and As Built comments. The models will always reflect the revised contract documents. The Construction model will be used for scheduling analysis, construction sequencing, and trade coordination.
Model Roles. During the Conceptualization / Program of Requirements phase, if a model is created, its role will be to depict the visual concept and general layout of the project along with space requirements.

Related to Model Roles

  • Hot Weather Guidelines For the purposes of site based discussions regarding the need to plan and perform work during expected periods of hot weather, the following issues shall be considered in conjunction with proper consideration of Occupational Health and Safety issues.

  • HIV/AIDS Model Workplace Guidelines Grantee will:

  • Demographic, Classification and Wage Information XXXXXX agrees to coordinate the accumulation and distribution of demographic, classification and wage data, as specified in the Letter of Understanding dated December 14, 2011, to CUPE on behalf of Boards of Education. The data currently housed in the Employment Data and Analysis Systems (EDAS) will be the source of the requested information.

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Specification and Service Levels The Specification sets out the Services that the Contractor has undertaken to provide. The Specification includes Service Levels setting out particular levels of service that the Contractor has undertaken to meet.

  • Service Descriptions Available services for Transitional and Enhanced Supervision Services a. One (1) one-to-one meeting with the Contractor per week for case management services.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • CFR PART 200 Procurement of Recovered Materials A non-Federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines. Does vendor certify that it is in compliance with the Solid Waste Disposal Act as described above? Yes

  • Training Purpose Type Insert the purpose for taking this course or program using the appropriate training purpose type code. Code 01

  • Procurement Plan 8. The Borrower shall update the Procurement Plan as needed throughout implementation of the Project, and on each anniversary of the Effective Date, the Borrower shall in consultation with ADB determine whether the Procurement Plan needs to be updated. The Borrower shall implement the Procurement Plan in the manner in which it has been approved by ADB.

Time is Money Join Law Insider Premium to draft better contracts faster.