Motor Connections i) Unless otherwise specified motors and associated machinery will be supplied and fixed by others. The Contractor will be required to provide an electrical supply and to connect the means of disconnection, starting and to the motor terminals and accessible to the machine operator where applicable. Unless specified as being supplied by others, the Contractor shall supply and install a local switch dis-connector for each motor. The switch dis-connector shall have a facility for padlocking in the “off” position. A suitable starter (which will be provided with the motor) shall be fixed and connected by the Contractor. Switch-disconnections shall, unless otherwise specified, be wall mounted adjacent to the motor, or onto a suitable floor mounting pedestal or onto the framework of the machine or equipment. The switch dis-connector shall be accessible within 2,0m of unobstructed access to the motor terminals. Unit starters shall, where possible, be mounted adjacent to the switch dis-connector provided that this position will afford easy control of the machine by the operator. The final connection to a motor shall comprise a multi-core armored cable with a neatly strapped loop of slack at least 800mm long to allow adjustments to be made to the motor and/or its mountings. The multi-core cable shall contain an extra core for earthing purposes. The entry into the motor terminal box should preferably be from below/or alternatively from the side, but never from above. The Contractor shall ensure the correct rotation of the motor and the settings of the starter in co-operation with the representative of the supplier of the motor.
AutoNDA by SimpleDocs

Related to Motor Connections

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Internet Connection In order to ensure the proper functioning of the Production Monitor and the Consumption Monitor, if possible, you must provide the Solar System with continuous access to a functioning broadband internet connection with one (1) wired Ethernet port and standard electrical outlet, at your cost. If you are unable to provide the Solar System with an internet connection in accordance with the foregoing sentence, the Home must be located in an area with cellular service that is acceptable to us in our discretion.

  • Connections HTC”s responsibility for service ends at the demarcation point. “Demarcation” means the point of meeting where the “hand-off” occurs between HTC’s system and Customer’s system. Facilities used by HTC in providing Services may be connected with terminal equipment or communications systems provided by Customer. In such a case, facilities and terminal equipment or communications systems provided by Customer or its customers shall be subject to mutually agreeable technical interface specifications.

  • Cross Connection For a collocation arrangement, the facilities between the collocating Party’s equipment and the equipment or facilities of the housing Party (such as the housing Party’s digital signal cross connect, Main Distribution Frame, or other suitable frame or panel).

  • Developer and Connecting Transmission Owner agree to report to each other in writing as soon as practical all accidents or occurrences resulting in injuries to any person, including death, and any property damage arising out of this Agreement.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Trunk Group Connections and Ordering 5.2.1 For both One-Way and Two-Way Interconnection Trunks, if Onvoy wishes to use a technically feasible interface other than a DS1 or a DS3 facility at the POI, the Parties shall negotiate reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

Time is Money Join Law Insider Premium to draft better contracts faster.