NSSS Thermal Performance Test Sample Clauses

NSSS Thermal Performance Test. A test (the “NSSS Thermal Performance Test”) shall be run at [***] licensed thermal power as indicated by the secondary calorimetric. The thermal power shall be at the highest maintainable power level, but in no event less than [***] licensed thermal power in order to conduct this test. The purpose of this test is to verify the reliable operation of the Unit and that the nuclear steam supply system indicated power level, as measured by the secondary calorimetric, is greater than or equal to [***] licensed thermal power during a period of continuous operation of [***]. Such test shall be satisfactorily completed when the Unit has demonstrated this capability for such continuous period. The measurement frequency shall be every sixty (60) minutes throughout the test. If there is any reduction in the thermal power output [***] or delay in the performance of the NSSS Thermal Performance Test that is not due to an error or omission of Contractor or its Personnel, Contractor shall re-run the NSSS Thermal Performance Test when such circumstances xxxxx, but the interruption or delay in the performance of the test shall constitute a Change and entitle Contractor to seek a Change Order pursuant to Article 9. If the reduction in the thermal power output [***] or delay is not due to an error or omission of Contractor or its Personnel or Uncontrollable Circumstances, the hours of continuous operation performed prior to such reduction or delay shall be credited toward the period of [***] of continuous operation once the NSSS Thermal Performance Test is resumed.
AutoNDA by SimpleDocs
NSSS Thermal Performance Test. The “NSSS Thermal Performance Test”, shall be run at [***] licensed thermal power, if achievable, as indicated by the secondary calorimetric; provided that, if the thermal power output [***] the Unit shall be operating with a Net Unit Electrical Output [***] in order to commence the NSSS Thermal Performance Test. The NSSS Thermal Performance Test shall be run during a period of continuous operation of [***]. Such test shall be satisfactorily completed when the Unit has operated for such continuous period. The measurement frequency shall be, at a minimum, every sixty (60) minutes throughout the NSSS Thermal Performance Test. If during the conducting of the NSSS Thermal Performance Test, the Net Unit Electrical Output, as determined based on a rolling four (4) hour average measured at one hour intervals [***], not due to any action or inaction by Owner or its Personnel, or an event of Force Majeure, then such [***] test shall be re-started once the Net Unit Electrical Output returns to a value [***]. If, however, during the conducting of the NSSS Thermal Performance Test, the Net Unit Electrical Output is [***] due to any action or inaction by Owner, its Personnel, or an event of Force Majeure or if there is a delay in conducting the NSSS Thermal Performance Test that is due to any action or inaction by Owner, its Personnel, or an event of Force Majeure, the hours of continuous operation performed prior to such reduction or delay shall be credited toward the period of [***] of continuous operation once the NSSS Thermal Performance Test is resumed. [***]. If the cumulative delays in conducting the NSSS Thermal Performance Test or cumulative time periods of reductions in Net Unit Electrical Output [***] during the conducting of the NSSS Thermal Performance Test that are due to any action or inaction by Owner, its Personnel or an event of Force Majeure exceed [***] and the Unit has demonstrated the capability of operating at a Net Unit Electrical Output [***] during the Start-up Tests and any partially completed NSSS Performance Test, then Contractor shall be entitled to receive the Milestone Payment that would be due for achieving Substantial Completion and the Warranty Periods associated with Substantial Completion shall commence, provided that the other requirements of Substantial Completion which are not related to the NSSS Thermal Performance Test have been met. Such a payment shall not waive or affect any of the other obligations of Contractor under this ...

Related to NSSS Thermal Performance Test

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • CONTRACTOR PERFORMANCE AUDIT The Contractor shall allow the Authorized User to assess Contractor’s performance by providing any materials requested in the Authorized User Agreement (e.g., page load times, response times, uptime, and fail over time). The Authorized User may perform this Contractor performance audit with a third party at its discretion, at the Authorized User’s expense. The Contractor shall perform an independent audit of its Data Centers, at least annually, at Contractor expense. The Contractor will provide a data owner facing audit report upon request by the Authorized User. The Contractor shall identify any confidential, trade secret, or proprietary information in accordance with Appendix B, Section 9(a), Confidential/Trade Secret Materials.

  • Quarterly Contractor Performance Reporting Customers shall complete a Contractor Performance Survey (Exhibit I) for each Contractor on a Quarterly basis. Customers will electronically submit the completed Contractor Performance Survey(s) to the Department Contract Manager no later than the due date indicated in Contract Exhibit D, Section 17, Additional Special Contract Conditions. The completed Contractor Performance Survey(s) will be used by the Department as a performance-reporting tool to measure the performance of Contractors. The Department reserves the right to modify the Contractor Performance Survey document and introduce additional performance-reporting tools as they are developed, including online tools (e.g. tools within MyFloridaMarketPlace or on the Department's website).

  • Annual Performance Review The Employee’s performance of his duties under this Agreement shall be reviewed by the Board of Directors or a committee of the Board of Directors at least annually and finalized within thirty (30) days of the receipt of the annual audited financial statements. The Board of Directors or a committee of the Board of Directors shall additionally review the base salary, bonus and benefits provided to the Employee under this Agreement and may, in their discretion, adjust the same, as outlined in Addendum B of this Agreement, provided, however, that Employee’s annual base salary shall not be less than the base salary set forth in Section 4(A) hereof.

  • Ongoing Performance Measures The Department intends to use performance-reporting tools in order to measure the performance of Contractor(s). These tools will include the Contractor Performance Survey (Exhibit H), to be completed by Customers on a quarterly basis. Such measures will allow the Department to better track Vendor performance through the term of the Contract(s) and ensure that Contractor(s) consistently provide quality services to the State and its Customers. The Department reserves the right to modify the Contractor Performance Survey document and introduce additional performance-reporting tools as they are developed, including online tools (e.g. tools within MFMP or on the Department's website).

  • Performance Levels (a) The Performance Levels which apply to the performance by the respective Parties of their obligations under this Agreement are set out in Part 1 of Schedule 5. A failure by either Party to achieve the relevant Performance Level will not constitute a breach of this Agreement and the only consequences of such failure as between the Parties shall be the consequences set out in this Clause 5.6. (b) If the Operator does not comply with the Operator Performance Level then the Access Holder must pay to QR Network the amount determined in accordance with Schedule 5 as part of the invoice issued by QR Network for Access Charges and other charges for the Billing Period immediately following QR Network becoming entitled to that amount. Where there is no next Billing Period, the Operator must pay such amount to QR Network within fourteen (14) days after receipt of a Tax Invoice from QR Network. (c) If QR Network does not comply with the QR Network Performance Level then QR Network will credit to the Access Holder the amount determined in accordance with Schedule 5 by way of a deduction from the invoice issued by QR Network for Access Charges and other charges for the Billing Period immediately following the Access Holder becoming entitled to that amount. Where there is no next Billing Period, QR Network must pay such amount to the Access Holder within fourteen (14) days after receipt of a Tax Invoice from the Access Holder. (d) The Parties must, if requested by either Party, meet to review the Performance Levels subject to such review not occurring within six (6) Months after the Commitment Date or any previous review of the Performance Levels. If either Party notifies the other that it considers that the Performance Levels are no longer appropriate, the Parties may agree on varied Performance Levels and any associated variations to the Agreement including the Base Access Charges and the Train Service Description. If the Parties are unable to agree to such variations, then the existing Performance Levels shall continue to apply unless varied by QR Network in accordance with the provisions of Clause 5.6(e). (e) In the event that the Access Holder and/or the Operator (i) does not comply in any material respect with the Train Service Description; and (ii) the Access Holder fails to demonstrate to the reasonable satisfaction of QR Network when requested to do so, that the Access Holder will consistently comply with the Train Service Description for the remainder of the Term then, following consultation with the Access Holder, QR Network will be entitled to: (iii) vary the Train Service Description to a level it reasonably expects to be achievable by the Access Holder for the remainder of the Term having regard to the extent of previous compliance with the Train Service Description (ignoring, for the purpose of assessing previous compliance, any non-compliance to the extent that the non-compliance was attributable to a Railway Operator (other than the Access Holder) or to QR Network); and (iv) vary the Agreement (including, without limitation, the Operator Performance Level and the Base Access Charges) to reflect the impact of the change in the Train Service Description. (f) The Access Holder shall be entitled to dispute any variation proposed by QR Network pursuant to Clause 5.6(e) and such dispute will be referred to an expert for resolution in accordance with Clause 17.3.

  • Annual Performance Evaluation On either a fiscal year or calendar year basis, (consistently applied from year to year), the Bank shall conduct an annual evaluation of Executive’s performance. The annual performance evaluation proceedings shall be included in the minutes of the Board meeting that next follows such annual performance review.

  • Performance Measure Grantee will adhere to the performance measures requirements documented in

  • Registry Performance Specifications Registry Performance Specifications for operation of the TLD will be as set forth in Specification 10 attached hereto (“Specification 10”). Registry Operator shall comply with such Performance Specifications and, for a period of at least one (1) year, shall keep technical and operational records sufficient to evidence compliance with such specifications for each calendar year during the Term.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!