Framework This Agreement establishes a framework that will enable Red Hat to provide Software and Services to Client. “Software” means Red Hat Enterprise Linux, JBoss Enterprise Middleware and other software programs branded by Red Hat, its Affiliates and/or third parties including all modifications, additions or further enhancements delivered by Red Hat. The specific services (the “Services”) and/or Software that Red Hat will provide to Client will be described in an Order Form, signed by the parties or otherwise accepted by Red Hat, which may consist of (a) one or more mutually agreed order forms, statements of work, work orders or similar transaction documents, or (b) an order placed by Client through Red Hat's online store accessible from a Red Hat website. The parties agree that the terms of this Agreement will govern all purchases and use by Client of Software and Services unless otherwise agreed by the parties in writing.
Legal Framework 1. This programme agreement shall be read in conjunction with the following documents which, together with this programme agreement, constitute the legal framework of the EEA Financial Mechanism 2014-2021: (a) Protocol 38c to the EEA Agreement on the EEA Financial Mechanism 2014-2021; (b) the Regulation on the implementation of the EEA Financial Mechanism 2014-2021 (hereinafter referred to as the “Regulation”) issued by the Donor States in accordance with Article 10(5) of Protocol 38c; (c) the Memorandum of Understanding on the Implementation of the EEA Financial Mechanism 2014-2021 (hereinafter referred to as the “MoU”), entered into between the Donor States and the Beneficiary State; and (d) any guidelines adopted by the FMC in accordance with the Regulation. 2. In case of an inconsistency between this programme agreement and the Regulation, the Regulation shall prevail. 3. The legal framework is binding for the Parties. An act or omission by a Party to this programme agreement that is incompatible with the legal framework constitutes a breach of this programme agreement by that Party.
NIST Cybersecurity Framework The U.S. Department of Commerce National Institute for Standards and Technology Framework for Improving Critical Infrastructure Cybersecurity Version 1.1.
Overview (a) The Employer is committed to maintaining a stable and skilled workforce, recognising its contribution to the operation of the Employer. As such, full time direct and ongoing employment is a guiding principle of this Agreement. (b) The Employer will take all measures to achieve employment security for the direct permanent employees of the Employer. The Parties agree upon the measures in this Clause to protect and enhance the employment security, health and safety, terms and conditions of employment and career development of the employees. (c) The employer agrees that it is highly important to ensure that work is performed effectively, efficiently and without undue pressure or bullying, and in a way that promotes OHS and EO principles and practices in the workplace and appropriate representation of employees should they so request. The employer will ensure that its employment practices are consistent with the above principles and practices.
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.
Service Description 2.1 General
Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.
Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).