Overdubbing Sample Clauses

Overdubbing. Overdubbing is not deemed to be included under the terms of clause 9(a). Where it is established that overdubbing is absolutely necessary, in these instances, the Musician shall be credited with an additional session for each overdub, or a payment at the current appropriate MU rate.
AutoNDA by SimpleDocs
Overdubbing. Performers required to over-dub their own performance shall be paid an additional fee of 110% of the recording session fee for each over-dub.
Overdubbing. Fees payable to a Musician required to overdub their own performance within the same session shall be subject to an uplift of one hundred and ten percent. (110%) for that session (excluding porterage) for each overdub (Overdub).
Overdubbing. Where a musician in any session is required to overdub his or her own performance by adding a line or lines of sound to his first line of sound then he or she shall be paid for each such overdub at 125 per cent of the appropriate session fee.
Overdubbing. A musician may overdub his own performance provided that: In respect of the first overdub he shall be paid an additional 125% of the appropriate session fee; In respect of each subsequent overdub he shall be paid an additional 140% of the appropriate session fee. The test for overdubbing: ‘After recording, would the Musician be able to replicate the same performance (say in a live concert) without the requirement of an extra player?’

Related to Overdubbing

  • ROAD TOLERANCES Purchaser shall perform road work within the tolerances listed below. The tolerance class for each road is listed on the TYPICAL SECTION SHEET. Tolerance Class A B C Road and Subgrade Width (feet) +1.5 +1.5 +2.0 Subgrade Elevation (feet +/-) 0.5 1.0 2.0 Centerline alignment (feet lt./rt.) 1.0 1.5 3.0 1-6 ORDER OF PRECEDENCE Any conflict or inconsistency in the road plan will be resolved by giving the documents precedence in the following order:

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Load Shedding The Distributor may carry out Load Shedding in the following circumstances:

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

  • Viewing By strict appointment through the selling Agents, JD Commercial, 00 Xxxxxxxx Xxxxx, Bideford, North Devon. EX39 1TW TEL: (01237) 424053 / 07868 846357 E-MAIL: xxxxx@xx-xxxxxxxxxx.xx.xx JD COMMERCIAL, 00 XXXXXXXX XXXXX, website : xxx.xx-xxxxxxxxxx.xx.xx BIDEFORD, NORTH DEVON, EX39 1TW email : xxxxx@xx-xxxxxxxxxx.xx.xx

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Debriefing If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

Time is Money Join Law Insider Premium to draft better contracts faster.