Overview of Project Flow Regulation and Generation Sample Clauses

Overview of Project Flow Regulation and Generation. The amount of flow that enters the Rocky Reach Project is regulated by releases from the federal Grand Coulee Project, which essentially dictates the flowage curve for all downstream projects on the Columbia River hydropower system. Seasonal demand for hydroelectric generation is governed by the Pacific Northwest Coordination Agreement (PNCA);4 however, non-power constraints such as flood control operations and the FCRPS Biological Opinion also dictate flow releases from the Grand Coulee Project. In the mid-Columbia, five non-federal hydroelectric projects (Xxxxx, Xxxxx Reach, Rock Island, Wanapum and Priest Rapids projects) cooperate with each other and with the federal projects immediately upstream (Grand Coulee and Chief Xxxxxx projects) through the Hourly Coordination Agreement to efficiently manage these releases to meet power demand and non-power operations for fish protection under the Hanford 4 Grand Coulee Project releases are governed by the Pacific Northwest Coordination Agreement (PNCA). All generating utilities in the Northwest, with the exception of Idaho Power Company, are parties to the Agreement. The Agreement, in conjunction with the Canadian Treaty of 1964, provides a plan for optimizing water releases to meet power and non-power requirements on a seasonal basis. Reach Agreement. The Hourly Coordination Agreement is set up to meet the daily demands of power load peaking while maintaining reservoir levels as stable and full as possible. These seven projects are the primary source for electricity load regulation for the entire Northwest. Hydropower is a unique energy resource because of its ability to start and stop with relative ease compared to other energy sources, such as coal or natural gas, which require hours or days to bring additional capacity online to meet increased demand. If generation and load requirements do not match, the electrical system becomes unstable. Load regulation is the ability to adjust generation as often as every four seconds so that at every moment in time, the generation of the interconnected electrical system matches the load requirements being placed upon it by customer demand. The BPA uses the Grand Coulee and Chief Xxxxxx projects as its primary tools to align supply with demand signals, while all major Northwest investor-owned and some public power utilities have shares of the generation output of the five mid-Columbia non-federal projects. These projects are used for load regulation because of their abi...
AutoNDA by SimpleDocs

Related to Overview of Project Flow Regulation and Generation

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Allocation and use of scarce resources Any procedures for the allocation and use of scarce resources, including frequencies, numbers and rights of way, will be carried out in an objective, timely, transparent and non-discriminatory manner. The current state of allocated frequency bands will be made publicly available, but detailed identification of frequencies allocated for specific government uses is not required.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Cooperation on forestry matters and environmental protection 1. The aims of cooperation on forestry matters and environmental protection will be, but not limited to, as follows: (a) establishing bilateral cooperation relations in the forestry sector; (b) developing a training program and studies for sustainable management of forests; (c) improving the rehabilitation and sustainable management of forest with the aim of increasing carbon sinks and reduce the impact of climate change in the Asia-Pacific region; (d) cooperating on the execution of national projects, aimed at: improving the management of forest plantations for its transformation for industrial purposes and environmental protection; (e) elaborating studies on sustainable use of timber; (f) developing new technologies for the transformation and processing of timber and non-timber species; and (g) improving cooperation in agro-forestry technologies. 2. To achieve the objectives of the Article 149 (Objectives), the Parties may focus, as a means of cooperation and negotiations on concluding a bilateral agreement on forestry cooperation between the two Parties. Such collaboration will be as follows: (a) exchanges on science and technology as well as policies and laws relating the sustainable use of forest resources; (b) cooperation in training programs, internships, exchange of experts and projects advisory; (c) advice and technical assistance to public institutions and organizations of the Parties on sustainable use of forest resources and environmental protection; (d) facilitating forest policy dialogue and technical cooperation under the Network of Sustainable Forest Management and Forest Rehabilitation in Asia- Pacific Region, initiated at the 15th Asia Pacific Economic Cooperation (APEC) Meeting; (e) encouraging joint studies, working visits, exchange of experiences, among others; and (f) others activities mutually agreed.

  • Description of Projects Services

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Construction and Scope of Agreement The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any party. This Agreement is the only, sole, entire, and complete agreement of the parties relating in any way to the subject matter hereof. No statements, promises, or representations have been made by any party to any other, or relied upon, and no consideration has been offered or promised, other than as may be expressly provided herein. This Assumption of Risk, Release of Claims, Indemnification, and Hold Harmless and Agreement supersedes any earlier written or oral understandings or agreements between the parties. Participant acknowledges that he/she has read this Assumption of Risk, Release of Claims, Indemnification and Hold Harmless Agreement, understands its meaning and effect, and agrees to be bound by it. Date:

  • REGULATORY FILINGS AND CAISO TARIFF COMPLIANCE 3.1 Filing

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

Time is Money Join Law Insider Premium to draft better contracts faster.