Peak Alignment Sample Clauses

Peak Alignment. After a set of suitable spectral peaks have been selected from multiple data sets, they need to be aligned before they can be compared against each other or combined to form an average peak profile. The variations in peak location between data sets generated by the same MS protocol have been well demonstrated in several studies (Torgrip et al., (2003)[117], Xxxxxx (2004)[42]). According to Xx et al., (2006)[122], this variation exists even among the selected peak profiles of technical replicates, i.e., replicates of the same sample run under similar conditions. The reasons for this variability are not well understood and are quite often not of primary interest, at least as far as the functionality of the peak alignment algorithms are concerned. Current peak alignment algorithms range from fairly simple to extremely com- plicated. Xxxxxxx et al., (2003) assumes that peak variation is less than the typical distance between peaks and uses a closest point matching method for peak align- ment. Xx et al., (2006)[122] uses the same concept of peak distance to address the alignment of multiple peak sets. Xxxxxxx et al., (2003)[27] align spectral peaks by pooling the list of detected peaks that differed in location by three clock ticks in the retention time axis or by 0.05% of the mass. Xxxxx et al., (2003a)[120] extrapolate each peak to its local neighborhood with a peak width equal to 0.4% of the m/z value of the middle point based on the observation that the shift of peaks is approx- imately 0.1% to 0.2% of the corresponding m/z value. In a separate study, Xxxxx et al., (2003b)[121] first calculates the number of peaks in all samples allowing certain shifts, and selected m/z values with the largest number of peaks. Next, this set of peaks is removed from all spectra and the procedure is iterated until all peaks are exhausted from all samples. Xxxxxxxxxx et al., (2004)[115] propose the use of com- plete linkage hierarchical clustering to cluster peaks. All peaks that fall into the same cluster are considered to represent the same peak. Xxxxxxxx and Xxxxx (2006)[99] uses wavelets to represent the MS data in a multiscale frequency domain and use a coarse-to-fine decomposition method to first align peaks at a dominant scale and then refine the alignment of other peaks at a finer scale. Xxxxxx (2004)[42] propose a para- metric warping model with polynomial or spline functions to align chromatograms by adding calibration sequences into chromatograms. Peak alignment ap...
AutoNDA by SimpleDocs

Related to Peak Alignment

  • Visibility 1. Unless the Council of Europe requests or agrees otherwise, the Grantee shall take all necessary measures to publicise the fact that the Action has been funded within the framework of a Joint Project between the European Union and the Council of Europe. Information given to the press and to the beneficiaries of the Action, all related publicity material, official notices, reports and publications, shall acknowledge that the Action was carried out with a grant from a Joint Project between the European Union and the Council of Europe and shall display in an appropriate way the Joint Projects’ visual identity (for instructions on use of the Joint Projects’ visual identity, see Appendix IV). 2. In cases where equipment or major items have been purchased using funds provided by the European Union or the Council of Europe, the Grantee shall indicate this clearly on that equipment and those major items (including display of the European Union and Council of Europe’s logos), provided that such actions do not jeopardise the safety and security of the Grantee’s staff. 3. The acknowledgement and Joint Projects’ visual identity shall be clearly visible in a manner that will not create any confusion regarding the identification of the Acton as a project of the Grantee and the ownership of the equipment and items by the Grantee. 4. All publications by the Grantee pertaining to the Action that have received funding from a Joint Project between the European Union and the Council of Europe, in whatever form and whatever medium, including the Internet, shall carry the following or a similar disclaimer: “This document has been produced using funds of a Joint Project between the European Union and the Council of Europe. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Council of Europe”. 5. If the equipment purchased with a grant from a Joint Project is not transferred to the local partners of the Grantee or to the final recipient of the Action at the end of the implementation period of this Agreement, the visibility requirements as regards this equipment shall continue to apply between the end of the implementation period of this Agreement and the end of the Joint Project, if the latter lasts longer. 6. All layouts of any communication items prepared by the Grantee are subject to approval with the Contact point within the Council of Europe. 7. The Grantee accepts that the European Union and the Council of Europe may publish in any form and medium, including on their websites, the name and address of the Grantee, the purpose and amount of the grant and, if relevant, the percentage of co-financing.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Shiftwork (A) Where the Employee would have received shift loadings had the Employee not been on leave during the relevant period and such loadings would have entitled the Employee to a greater amount than a loading of 17.5% of the payment under clause 23.1(c), then the shift loadings must be added to the payment under clause 23.1(c)(i) instead of the 17.5% loading. (B) Provided further that if the shift allowance would have entitled the Employee to a lesser amount than the loading of 17.5% then such loading of 17.5% shall be used for the purpose of calculating annual leave loading in lieu of the shift allowance.

  • Elevation Elevation is defined as restoring an employee to the higher classification, with permanent status, which was held prior to being granted a demotion or to a class that is between the current class and the class from which the employee was demoted. Upon elevation, an employee’s salary will be determined in the same manner that is provided for promotion in Section 43.5, above.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf): a. Foundational Programs and Capabilities (As specified in Public Health Modernization Manual) b. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Accountability Metric: c. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Modernization Process Measure:

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Workloads The parties agree to the following provisions relating to faculty members' workload. (a) The registration limits for all courses currently offered by the Employer in the academic, career and technology areas are 35 unless established by practice as lower, excepting multiple sections where the limit is the correct multiple of the number of sections involved. (b) The registration limits for English are as follows: (i) Writing and Composition Courses - 25 (ii) Writing Skills -17 (iii) Creative Writing - 22

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!